This is a Statement of Work (SOW) for backflow valve assembly repair services at USCG Air Station San Francisco/Point Mugu.
The contractor must perform full repair and replacement of a failed backflow prevention assembly on meter #251022372 at the domestic water service located at 1020 North Access Road, San Francisco, CA 94128. Specific work includes: removing the existing 8" Watts 909 RPDA (serial #621460) and replacing it with an 8" Wilkins 475ST RP back-flow prevention assembly; installing a 4" Wilkins 475ST RP back-flow prevention assembly with ductile pipe and fittings to raise the assembly to appropriate height; obtaining necessary permits from San Francisco Airport Building Inspection & Code Enforcement (BICE); coordinating with the Water Department to isolate and restore water service; installing pipe supports and bracing in accordance with the Uniform Plumbing Code; and testing, certifying, and submitting results to appropriate agencies. The contractor must have a valid California Plumbing Contractor license, be registered in SAM.GOV, complete the BASE ACCESS LIST for site visit attendance, and provide a key personnel list requiring prior approval for facility access. All work is subject to 100% Coast Guard quality assurance surveillance, with unsatisfactory work to be re-performed at contractor expense. The performance period is 08/31/26 – 09/30/26, with option years available. Repairs must be completed within 60 days after award. Points of contact are LT Matthew Stickell and DCC Alex Medeiros.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Test Report.pdf | ||
| Backflow Assembly Repair Questions and Answers.pdf | ||
| BASE ACCESS LIST.xlsx | XLSX spreadsheet | |
| Combined Synopsis Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1.
2.
3. Delivery Schedule
4.
Department of Homeland Security
United States Coast Guard
/ Mugu
Backflow Valve Assembly Repair
The contractor shall perform full repair and replacement of failed components.
The contractor performing the work must have a valid California Plumbing Contractor license.
Interested vendors must completed the BASE ACCESS LIST to attend Site Visit.
Vendors must be registered in SAM.GOV to submit an offer.
USCG Air Station San Francisco 1020 North Access Road San Francisco, CA 94128
Completion of repairs shall be completed within 60 days after award.
08/31/26 09/30/26
Statement of Work – Francisco/Point Mugu
5.
6.
7.
The contractor shall repair backflow prevention assembly on meter# 251022372 on the domestic water service located at 1020 North Access Road. The existing assembly is failing to operate properly and is no longer in compliance with San Mateo Environmental Health Department. A new lead free RP type back-flow assembly is required at this time.
• Perform any necessary on & off site preparatory work.
• Have the Water Department isolate the water service at the main connection. The domestic water service will be interrupted.
• Have the Water Department restore the water service to the new assembly.
• Replace and raise one (1) 8" Watts 909 RPDA serial# 621460 with one (1) 8” Wilkins
475ST
• Obtain any necessary permits from the SFO San Francisco Airport Building Inspection & Code Enforcement (BICE).
• Remove the existing 8" Watts 909 RPDA.
• Install one (1) 4” Wilkins 475ST RP back-flow prevention assembly using any necessary ductile pipe & fittings in order to raise the assembly to the appropriate height.
• Install any necessary pipe and supports and bracing in accordance with the Uniform Plumbing Code (UPC).
• Test & certify the assembly and submit the results to the appropriate agencies.
• Submit all permits and final inspections to the SFO San Francisco Airport Building Inspection & Code Enforcement (BICE).
The contractor shall be escorted throughout the duration of the service. Contractor will provide the Contracting Officer with a key personnel list to keep on record. These members will need prior approval before entering the facility.
Statement of Work – Francisco/Point Mugu
9.
10.
8. t
11.
After award, the contractor shall conduct a site investigation and to ascertain the nature and location of the work and verify the general and local conditions. Failure to conduct a site investigation shall not relieve the contractor from performing the tasks in this SOW.
All services rendered will be subject to government inspection. The contractor shall perform or re-perform work which was not performed in a satisfactory manner, as determined by the KO, at the contractor’s expense. The Coast Guard will use a 100% quality assurance surveillance method.
LT Matthew Stickell