SOW B457 Hanger 24 120 v Outlet Mark up UPDATED.pdf

PDF 143 KB Posted

Attached to
B457 Hanger 2&4 120v Outlet
Solicitation number
FA460026Q0108
Issued by

About this file

This is a Statement of Work for the installation of electrical outlets at a U.S. Air Force facility. The project is titled "B457 Hanger 2&4 120v Outlet" with Work Task #5591313, dated 06 July 2026, and has a 30-day period of performance. The primary objective is to install two GFCI surface-mount duplex 120-volt outlets with switched control—one located on the vertical beam between Hangars 1&2 and one between Hangars 3&4, adjacent to the Liquid Cooling Cart reels. These outlets will enable Air Force and L3 personnel to operate and repair RC-135 mission systems within the hangar, reducing wasted labor hours and eliminating the need to tow aircraft for maintenance.

The scope of work requires the contractor to furnish all labor, services, tools, materials, and equipment necessary for complete installation and integration. The electrical installation includes approximately 640 linear feet of 1-1/4" conduit with #2 THHN wire and approximately 60 linear feet of 3/4" conduit with #10 THHN wire to connect the outlets to power. All work must comply with applicable codes including the International Building Code, National Electrical Code, AFI, UFC, UFGS, ASME, ASTM, ASHRAE, NFPA 72, and ISO 9001 quality management standards. Additional contractor responsibilities include obtaining all necessary security clearances and escort badges, environmental and life safety approvals, federal/state/local permits, site restoration within 10 workdays of completion, preparation of "as-built" drawings in AutoCAD .dwg format, provision of one-year workmanship and equipment warranties, and operations and maintenance manuals. The project is unit-funded with no special security clearances required beyond standard Air Force facility security protocols.

View the file

Other files

File Type Posted
GPS.jpg JPG image
Outlet.png PNG image
LCC Reel.jpg JPG image
B457 Electrical Outlets Questions and Answers.pdf PDF
B457 Electrical Outlet Installation Site Visit Sign-in.xlsx XLSX spreadsheet
WD - NE20260059.pdf PDF
Solicitation - FA460026Q0108.pdf PDF
55 SFS Form 31-Base Entry Authorization List.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement Of Work

Date: 06 July 2026 Work Task #: 5591313 Project title: B457 Hanger 2&4 120v Outlet Period of Performance: 30 Days

Objectives:

We require (1) duplex 120v outlet to be installed with power, between hangers 1&2 and (1) duplex 120v outlet between hangars 3&4 on the vertical beam next to the Liquid Cooling Cart reels (LCC).

This additional capability will allow Air Force and L3 personnel to fully operate and repair the RC- 135 mission systems within the Hangar. This will drastically reduce wasted man hours and eliminate the manpower required towing Aircraft for maintenance. This will be unit funded.

General Requirements:

Project includes, but is not limited to, the following work elements. The Contractor shall furnish all required services, labor, tools, material, and equipment necessary to complete the installation and integration of the prime mission equipment in accordance with the approved site design and installation plan. No alterations, additions, or deletions shall be made unless by prior approval of the Contracting Officer (CO). All work will meet the International Building Code, Uniform Plumbing Code, National Electrical Code, AFI, UFC, UFGS, ASME, ASTM, ASHRAE, ETL, NFPA 72 and any other applicable code requirement. The contractor shall maintain the work site in a clean and orderly manner so that the safest possible site is provided for workers and AF members.

Work shall be completed in a neat, substantial, and competent manner. The contractor shall perform quality assurance activities that conform to the quality assurance processes outlined in international organization of Standards (ISO) 9001, Quality Management Systems. The contractor shall use SOW requirements.

Scope:

1. Install 2 total 120v duplex outlets

a. Locate on vertical beam between hangers 1&2 (qty1) and hangers 3&4

b. GFCI surface mount receipt w/ switched control

c. Outlet must be connected to power

i. 1-1/4” conduit

1. #2 THHN

2. ~640 LF

ii. 3/4” conduit

1. #10 THHN

2. ~60

4. Additional General Requirements

• Item 1: All work will meet the International Building Code, Uniform Plumbing Code, National Electrical Code, IPC, ASME, ASHRAE, AFI, ETL, UFC, NFPA, 178 NAC 2, and any other applicable code or regulation requirement and manufacturers recommendations.

• Item 2: Maintain work site in a clean and orderly manner so that the safest possible site is provided for workers and AF members.

• Item 3: It is recommended that contractor visit site before starting any work to verify existing conditions/space requirements in work areas.

• Item 4: The Contractor shall furnish all required services, labor, tools, material, and equipment necessary to complete the installation and integration of the prime mission equipment in accordance with the approved site design and installation plan. No alterations, additions, or deletions shall be made unless by prior approval of the Contracting Officer

(CO).

• Ensure all construction meets federal regulations for safety standards.

• All security requirements must be met to include times of demolition and construction.

• At closeout the contractor shall provide a one-year workmanship warranty, equipment warranty documents and O&M manuals.

• The Contractor shall furnish all required services, labor, tools, material, and equipment necessary to complete the installation and integration of the prime mission equipment in accordance with the approved site design and installation plan. In addition, the Contractor shall be responsible for the following actions:

a. Obtaining all necessary security and safety clearances for facilities and personnel. This includes obtaining escort badges necessary for unaccompanied work within the area.

b. Obtaining necessary certifications for installation equipment and technologies to be installed.

c. Obtaining environmental and life safety approvals.

d. Acquiring all necessary federal, state, local and base environmental and civil engineering permits and approvals.

e. Redlining installation drawings based upon actual installation results and accommodations due to real-time installation change requirements.

f. Cleaning-up and restoring the site to its original or better condition within 10 workdays after project completion. This includes removal of any portable offices that may have been used to support implementation of the site design at the base.

g. Repairing damage to Government property resulting from contractor activities, assuring the property is returned to its original or better condition.

h. Removing all debris at the end of each shift or more frequently if required to keep the work area safe and useable.

i. Disposing of excess equipment and materials in accordance with General Requirements:

k. Preparing “as-built” drawings depicting the actual installation results. Electronic format of “as-built” drawings provided to the Government shall be an AutoCAD .dwg format.

Security Requirements The contractor or duly authorized representative shall comply with pertinent Air Force security regulations while working on the project(s). Special security clearances such as Confidential, Secret, etc., are not required by the contractor for this project. ALL POSSIBLE PRECAUTIONS

AND EFFORTS SHALL BE MADE TO PREVENT THE DISCLOSURE OF ANY

INFORMATION THAT MIGHT PROVIDE THE CONSTRUCTION CONTRACTORS,

MANUFACTURERS, OR SUPPLIERS AN ADVANTAGE OVER OTHERS.

Security Requirements