SOW - B399 Kiddie Pool Restoration.pdf

PDF 216 KB Posted

Attached to
Laughlin AFB Children's Pool Liner
Solicitation number
FA3099-25-Q-1003
Issued by

About this file

This Statement of Work (SOW) details the restoration of the Kiddie Pool (Building 399) at Laughlin Air Force Base in Del Rio, Texas, scheduled for February 2025. The project requires a contractor to completely renovate the pool, including demolishing the existing liner and concrete, pressure testing plumbing, installing new 5000 PSI concrete with 3, 4, and 5 Grade Rebar, applying White Marble Dash Plaster, and placing 6"X 6" Dark Blue Pool Tile around the pool perimeter. The total project duration is 30 working days from the Notice to Proceed, with work to be performed Monday through Friday from 0800-1600 hours.

Key requirements include comprehensive site investigation, proper disposal of debris, maintaining a clean work area, and strict compliance with OSHA, Air Force safety regulations, and fire prevention standards. The contractor must provide detailed personnel information for base access, submit tile samples for government approval, and be responsible for any warranty and service calls during the manufacturer's warranty period. The project is anticipated to be a small business set-aside with a total value of less than $25,000, and interested parties were required to submit capabilities packages by March 26, 2025.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Restoration of Kiddie Pool B399

Laughlin AFB, TX 13 Feb 2025

1. DESCRIPTION OF SERVICES: The Contractor shall furnish all materials, labor, tools, equipment, transportation, supervision, and all other incidentals necessary to complete the work outlined in this Statement of Work (SOW) at Laughlin Air Force Base in Building #399 Friendship Pool (Kiddie Pool). Kiddie Pool Liner will be removed, concrete will be demoed and existing plumbing will be pressure tested. New concrete will be poured and plaster will be applied to form the new Kiddie pool floor, tile will be placed around the perimeter of the pool wall. The Contractor shall ensure management oversight throughout the accomplishment of this contract. The Period of Performance for this work shall be 30 working days from the Notice to Proceed (NTP).

2. DESCRIPTION OF PRODUCT:

5000 PSI Concrete with 3, 4, and 5 Grade Rebar. Inlet and Outlet pressure testing to ensure no leaks are present. White Marble Dash Plaster and 6"X 6" Dark Blue Pool Tile.

Prior to commencement of work, the contractor shall submit samples of the tile conforming to the required specifications for Government approval.

3. PERIOD OF PERFORMANCE: The contractor shall notify the government 14 days before they start the project. The total number of days it should take to complete this project after the material has been delivered is no more than 30 working days.

4. PLACE OF PERFORMANCE: Installation of all products to occur in Building

399. Contractor will be able to bring materials and stage materials in a designated area agreed upon with project point of contact (POC).

5. LOCATION, STORAGE, AND PARKING: Storage for any material shall be available in the fenced in area of the Kiddie Pool.

6. PROJECT SCHEDULE: Contractor shall ensure installation is scheduled with the POC.

The Work Shall be performed Monday through Friday from 0800-1600. Except Federal Holidays and scheduled with Government Representative. Any deviation from the hours of operations shall need to be approved by the CO in writing.

7 WORK REQUIREMENTS:

1. Demolish and remove existing Liner and concrete.

2. Pressure test existing plumbing to ensure no leaks are present.

3. Lay new supporting rebar and poor concrete to form new Kiddie Pool.

4. When concrete is dry and cured apply plaster forming the new walls and floor of Kiddie Pool.

5. Tile perimeter of the pool wall.

6. Repair any damage to the property caused by the contractor at no cost to the Government.

7. The Contractor shall investigate the existing condition at Building 399 Kiddie Pool and obtain all necessary information and engineering design data through on-site investigation, reconnaissance, and surveys, as required to complete the scope of work. However, the use of Government furnished data does not relieve the Contractor from performing thorough site investigations in order to obtain all the information necessary to provide complete and fully functioning systems.

8. Dispose all old concrete, liner, debris, and all trash at landfill. Laughlin will not provide any trash containers for contractors.

9. Area must be kept clean at all times and at the end of each day.

8. PRE-INSTALLATION INSPECTION: No pre inspection will be needed.

9. QUALITY ASSURANCE: The government shall inspect all work performed by the Contractor. Work performance shall be deemed satisfactory and acceptable to the government when the Government representative have reviewed the installation for accuracy, declares the project satisfactory, and signed the installation paperwork. The contractor shall repair or replace damaged items at no additional cost to the government.

10. BASE FIRE REGULATIONS: All work shall be in strict compliance with NFPA-101, Air Force Occupational Safety & Health (OSHA), Air Force Occupational Safety and the Fire Prevention and Health Program. Compliance with OSHA and other applicable laws and regulations for the protection of employees is exclusively the obligation of the contractor, and the government will assume no liability or responsibility for the contractor’s compliance or noncompliance with such responsibilities.

11. COMPLIANCE WITH LAWS: The Contractor shall comply and ensure that all subcontractors comply with all applicable federal, state, and local laws, regulations, ordinances, and standards.

12. SITE-MAI NT ENANCE The Contractor shall protect adjacent property, offices and their contents from dust, dirt, or other materials. Work areas shall be maintained in a neat, clean, safe condition and shall, at a minimum, be cleaned with all waste and packing materials removed at the end of each shift. Contractor shall maintain clearances through corridors for occupants to pass. Once installation is complete, contractor shall be responsible for any warranty and service calls throughout the manufacturer’s warranty period. Once warranty and service calls have been requested, contractor shall follow manufacturer’s warranty terms and conditions, and work with a government representative until issues are resolved.

13. SPECIFIC CONDITIONS/DEFINITIONS:

a. Installers shall have an emptied environment for each day of demo and installation.

Installers will work around plumbing inlet and outlets in kiddie pool, taking care not to cover.

b. Contractor shall provide the full names, birth dates, social security number and driver’s license numbers of each installer associated with this installation as required for sponsorship onto Laughlin AFB Del Rio TX. Work time schedules and the number of installation crews must be provided to the Contracting Officer prior to the start of work. Such information shall be submitted to the contracting office two weeks prior to the start of work. Base access will be granted to those listed on the above-mentioned document for the duration of the project.

c. At no time shall the contractor accept direction or changes in type of product obtained, configuration or installation without the written approval of the Contracting officer.

14. OSHA PUBLIC LAW 91

Comply with the OSHA Public Law 91-596, Occupational Safety and Health Act of 1970 and the resulting standards (e.g., 29 CFR 1910, Occupational Safety and Health Standards, 29 CFR 1926, Safety and Health Regulations for Construction), national consensus standards of the United States (e.g., National Fire Protection Association and National Electrical Codes), and all applicable federal, state, local, and Department of Defense, environmental, safety, and occupational health statues, policies, and regulations). It is the contractor’s responsibility to make certain that all safety requirements, equipment, and training are met and provided to their employees. Additionally, the contractor is responsible to ensure compliance with safety and health standards by all sub-contractor employees. Air Force Safety, Fire Protection, and Bioenvironmental Engineering officials may periodically enter a contractor’s workplace to verify working conditions of personnel or to make inspections for protection of Government facilities, personnel, and equipment. If an improper procedure or unsafe condition exists, the contractor shall notify the applicable Wing Representative/CO and immediately correct the unsafe condition within 24 hours after occurrence. Department of Labor OSHA inspectors are authorized right of entry to inspect any place of employment operated by an Air Force contractor. They are, for the most part, “NO NOTICE” inspections. Notify the COR if an OSHA inspector visits the site unescorted by Air Force Safety Personnel.