This Statement of Work (SOW) details the requirements for replacing electroplating rectifiers at the Corpus Christi Army Depot's (CCAD) Advanced Metal Finishing Facility (AMFF). The contract calls for eight new switch mode rectifiers with varying amperage and voltage specifications (ranging from 250 to 2000 Amps, 0-12 Volts), with six of the rectifiers requiring forward and reverse capability. The existing rectifiers, some in service since 2003, are considered obsolete and oversized for current plating operations.
Key technical requirements include air-cooled rectifiers with less than 1% ripple output, remote controllers, digital voltage and amperage meters, and the ability to interface with CCAD's current process logic controller (PLC) and SCADA system. The contractor must deliver the rectifiers within 12 months of contract award, perform a site visit prior to fabrication, and provide comprehensive training for maintenance and operational personnel. The rectifiers will be located in a hot, humid plating shop environment and must withstand corrosive chemicals and low-pressure water. Delivery and installation will occur at Building 340 on Naval Air Station Corpus Christi in Texas.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
For
Building 340 Rectifiers
Prepared By:
Derek Flores
Chemical Engineer
Process Engineering Branch
Corpus Christi Army Depot
(361) 961-5596
STATEMENT OF WORK
1.0 GENERAL:
1.1. Purpose: This Statement of Work (SOW) defines the requirements for electroplating rectifers for the metal finishing operations at Corpus Christi Army Depot (CCAD).
1.2 Background: The current rectifiers which will be replaced in the Advanced Metal Finishing Facility (AMFF) have been in use since at least 2009 with two of the rectifiers in service since 2003.
The expected useful life for these rectifiers is 10 years so they are well beyond their recommended replacement date. Additionally, the rectifiers are, in many cases, oversized for the actual plating operations that are performed and also utilize older rectifier technology (silicon controlled rectification) which is not as precise as newer technology such as switch mode rectification.
1.3 Completion Date: The Contractor shall deliver the rectifiers within twelve (12) months from contract award.
1.4. Operational procedures:
1.4.1. Recognized federal holidays: the following is a list of federal holidays. The Contractor shall not deliver or conduct installation on these days or their federally recognized observance days unless required by the Contracting Officer’s Representative (COR) or the Contracting Officer (KO).
New Year’s Day Martin Luther King Jr’s Birthday President’s Day Memorial Day Juneteenth Independence Day Labor Day Columbus Day Veteran’s Day Thanksgiving Day Christmas Day
1.4.2. CCAD Closure: CCAD may schedule a shutdown period of approximately 40 working hours between Christmas Day and New Year’s Day holiday. CCAD may schedule a shutdown period at other times. The Contractor shall comply with administrative closing procedures for CCAD.
Announcements of closures will be made through the KO and COR.
1.4.3. CCAD Core Hours: Core hours of operation at CCAD are Monday through Thursday from 0800 to 1630, except on United States holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government directed facility/installation closings.
1.4.4 Site Access: The Contractor shall provide the COR a minimum of five business days prior notice of a site visitation so that any contracted personnel personal data can be placed in the NAS Corpus Christi security database for access to the installation.
1.4.5. Non‐Personnel Services Statement: Contractor employees performing under this contract shall be controlled, directed, and supervised at all times by management personnel of the Contractor.
Contractor employees shall perform their duties independent of, and without the supervision of, any Government official.
1.4.6. Location of Delivery: All items shall be delivered at Building 340 on Naval Air Station Corpus Christi (NASCC). Corpus Christi, TX is located by the Gulf of Mexico in south Texas, approximately 210 miles southwest of Houston, 150 miles south of San Antonio, and 150 miles north of Mexico. CCAD is a 154‐acre industrial complex located within the confines NASCC.
1.4.7. Trash And Debris Removal: The Contractor shall always keep the work area free of waste materials and rubbish accumulations. The Contractor shall leave the work area and premises in a clean, neat and organized condition and provide a dumpster for all metallic materials, and shipping containers. The Contractor shall place dumpsters in an area designated by the Government.
1.4.8. On And Off-Loading Equipment: The Contractor shall be responsible for offloading all equipment and tools in Building 340. The Contractor shall be responsible for preservation, packing, shipping, un‐packing, on‐site placement at CCAD and storage in accordance with the manufacturer’s commercial practices. The Contractor shall provide an on‐site, fully authorized representative for all receipt of goods. The Government will not provide storage for shipped equipment and materials.
The Contractor shall be responsible for the storage and handling of equipment and materials.
1.4.9.Travel Expenses: The Contractor shall be responsible for all travel expenses associated with this requirement.
1.4.10. Standards and Procedures: Applicable building, safety, construction, federal and process standards and procedures are listed in Section 2 of this SOW.
1.4.10.1. Approvals: Government approvals for any product, design, specification, or document does not negate the Contractor’s ultimate responsibility for meeting standards, codes, and regulatory agency requirements.
1.4.10.2. Standard By Reference: When a reference in this document is made to an industry specification, a manufacture, trade or trade association, an industry, or other generally recognized source, such are hereby made a part of the specification and shall have the same force and effect as though referenced in this document.
1.4.10.3. Competing Regulations: In the event of competing regulations and requirements for this installation, the strictest shall be enforced.
1.5 Security Requirements: The following information is provided on security related matters.
1.5.1 Installation Access: Access to U.S. installations, buildings and controlled areas is limited to personnel who meet security criteria and are authorized. Failure to submit required information/data and obtain required documentation or background investigations will be grounds for denying access to U.S. installations, buildings and controlled areas. The Contractor shall ensure that any subcontractors used in performance of this contract complies with these requirements and that all employees, of both the Contractor and any subcontractor utilized by the Contractor, are made aware of and comply with these requirements.
1.5.1.1 The Contractor shall be aware of and comply with the requirements associated with Installation Access Control. The Government is not liable for any costs associated with performance delays due solely to a firm’s failure to comply with Installation Access Control processing requirements.
1.5.1.2 The Contractor shall return installation and CCAD passes to the issuing Security office when the contract is completed or when a Contractor employee no longer requires access.
1.5.1.3 The contractor shall obtain a Base Access Pass through Navy Pass & Tag not to exceed contract expiration. The government Contracting Officer Representative (COR) will coordinate badging and briefing with Navy and CCAD Security. CCAD personnel will escort contractor at all times while onboard CCAD unless approved in advanced by CCAD Security. Contractors are not authorized to escort anyone on the installation or CCAD.
1.5.2 Access Passes
1.5.2.1 Installation Pass Log (Deliverable): The Contractor shall provide the Contracting Officer, via the COR, an Initial Installation Pass Log within 3 calendar days after contract award. The log must at a minimum contain the following information Full Legal Name, type of access (e.g. CAC, DBIDS, base pass) and working hours. The log shall be updated as employees are added or removed.
The Updated Installation Pass Log shall be current and available at any time upon request by the Government and submitted to the COR within 3 days after any changes to the log.
1.5.2.2 Individual Termination or Expiration of Employment (Deliverable): The Contractor shall collect the installation access passes the same day employment of an individual has expired or has been terminated and shall return them to the issuing office within 3 working days.
1.5.2.3 Contract Termination or Cancellation (Deliverable): Upon termination or cancellation of this contract, the Contractor shall collect all outstanding installation access passes and return them to the issuing office within 3 working days.
1.5.3: Physical Security: The Contractor shall safeguard all Government equipment, information, and property provided for Contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured IAW the Army Physical Security Program (AR 190-13.)
1.5.4 Operations Security (OPSEC) Requirements: Contractor personnel shall adhere to facility security policies and restrictions. The Contractor shall immediately report suspicious activities to security personnel. Government issued access badges shall not be worn outside designated facilities where visible to the general public.
1.5.5 Safeguarding Covered Defense Information: Contractors and subcontractors are required to safeguard covered defense information that resides in or transits through covered contractor information systems by applying specified network security requirements and reporting of cyber incidents in accordance with 48 CFR 204.73.
1.5.6 Identification of Contractor Employees: All Contractor personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties must identify themselves, to include proper marking of signature blocks in correspondence, to avoid creating an impression in the minds of members of the public that they are Government officials. The Contractor shall ensure that all documents or reports, produced by
Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.
1.5.7 Contractor workspace: (SOW para 5.0 All) staging site, on-site office, desk or work area, etc.)
shall contain a sign signifying the space is occupied by Contractor employee(s) to ensure that Government employees and the public know that they are not Government employees. The proposed sign shall be submitted to the Contracting Officer via the COR for review and acceptance 10 calendar day after contract award. Workspace sign location shall be coordinated with the COR. Contractor employees shall identify themselves by name and company affiliation when answering the telephone, presenting briefings, conducting or attending meetings, and seminars. All Contractor correspondence (written, facsimile, and email display) shall include their company name.
1.5.8 Data Rights: The Government has unlimited rights to all documents and materials produced under this contract. All documents and materials, to include the source codes of software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership and copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the Contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.
1.5.9 Non-Disclosure Requirements: Performance under this contract may require the Contractor to access data and information proprietary to a government agency, another Government Contractor, or of such nature that its dissemination or use other than as specified in this work statement would be averse to the interests of the Government or others. The Contractor and Contractor personnel shall not divulge, or release data or information developed, or obtained under performance of this SOW, except to authorized Government personnel or upon written approval of the Contracting Officer. The Contractor shall not use, disclose, or reproduce proprietary data, which bears a restrictive legend, other than as specified in this SOW. All documentation showing individual names or other personal information shall be controlled and protected under the provisions of the Privacy Act of 1974, Public Law 93-579, 5 United States Code (U.S.C.) Section 552a.
1.5.10 Protection of Government and Contract Information: Per Public Use Notice of Limitations stated by the Defense Media Activity and contained at www.dma.mil/resources/limitations/, the Contractor shall not cite any information (e.g., contract information, pictures, locations, etc.)
obtained through this contract on any hard copy or digital marketing tools to include its company website.
1.5.11 Required Training: The following provides information on training requirements.
1.5.11.1 Anti-Terrorism (AT) Level I Training (Deliverable): All Contractor employees, including subcontractor employees, who are employed under the contract, shall complete AT Level I Training within thirty (30) calendar days as required on the AT/OPSEC Cover Sheet after contract start date or effective date of incorporation of this requirement into the contract, whichever applies, or thirty
(30) calendar days after employment of new personnel. Contractor personnel travelling overseas shall complete area of responsibility (AOR) specific AT awareness training for U.S. based Contractor employees and associated subcontractor employees. The Contractor shall submit certificates of completion for each affected Contractor employee and subcontractor employee to the
COR (or to the Contracting Officer, if a COR is not assigned) within five (5) business days after completion of this training by all employees and subcontractor personnel. AT Level I awareness training is available at https://jkodirect.jten.mil, (course JS-US007). Contractor personnel shall complete refresher training every twelve (12) months except AOR specific AT Level I training which shall be completed as required by local AT policies.
1.5.11.2 If training cannot be conducted on the website, the Contractor shall coordinate with the COR who will contact the local AT Officer at their assigned location for classroom training.
Contractor personnel completing training in the classroom will receive a certificate or the training attendance roster signed by the AT Officer. Verification of the training shall be provided to the COR within five (5) business days after completion of the training.
1.5.11.3 OPSEC Training (Deliverable): All Contractor employees, including subcontractors, shall complete Level I OPSEC training within thirty (30) calendar days of employment under this contract. Verification of the training shall be provided to the COR within five business days after completion of the training.
1.5.11.3.1 OPSEC Level I training is available at https://securityawareness.usalearning.gov.
Contractor personnel must complete refresher training every 12 months. Verification of the training shall be provided to the COR within five (5) business days after completion of the training.
1.5.11.4 iWATCH Training (Deliverable): The Contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within thirty (30) calendar days after the contract is awarded and within five (5) business days after new employees commence contract performance, with the results reported to the COR within five (5) business days after the contract is awarded and within thirty (30) calendar days} after new employees commence contract performance. Verification of the training shall be provided to the COR within five (5) business days after completion of the training.
2.0 APPLICABLE DOCUMENTS:
2.1 Military Specifications
2.1.1 MIL-P-26517A
2.1.2 MIL-PRF-49470
2.1.3 MIL-STD_1472H
2.2 CCAD Documents
2.2.1 CCADR 385-30, CCAD Workplace Safety
2.2.2 CCADR 385-40, CCAD Safety Program
2.3 Other Government Documents
2.3.1 29 CFR Part 1926, Safety and Health Regulations for Construction
2.3.2 29 CFR Part 1910, Safety and Health Regulations for General Industry
2.3.3 29 CFR OSHA 1910.303(g)
2.4 Industry Documents
2.4.1 NFPA 70 National Electrical Code
2.4.2 NFPA 79 Electrical Standard for Industrial Machinery
3.0 ACRONYMS AND DEFINITIONS:
3.1 Acronyms
3.1.1 ACC – Army Contracting Command
3.1.2 AHJ – authority having jurisdiction
3.1.3 AMC – Army Materiel Command
3.1.4 ANSI – American National Safety Institute
3.1.5 AR – Army Regulation
3.1.6 ASME – American Society of Mechanical Engineers
3.1.7 ASTM – American Society for Testing and Materials
3.1.8 CCAD – Corpus Christi Army Depot
3.1.9 CCADR – Corpus Christi Army Depot Regulation
3.1.10 CFR – Code of Federal Regulations
3.1.11 COR – Contracting Officer’s Representative
3.1.12 CRT – cathode ray tube
3.1.13 DOD – Department of Defense
3.1.14 EEWP – Energized Equipment Work Permit
3.1.15 EPA – Environmental Protection Agency
3.1.16 EPCD – Environmental Programs Compliance Division
3.1.17 GFCI – ground-fault circuit interruptor
3.1.18 HMI – human-machine interface
3.1.19 HZ – frequency in hertz
3.1.20 IAW – in accordance with
3.1.21 IH – Industrial Hygiene
3.1.22 IUID – Item Unique Identification
3.1.23 A – Amperage
3.1.24 KO – Contracting Officer
3.1.25 NASCC – Naval Air Station, Corpus Christi
3.1.26 NEPA – National Environmental Policy Act
3.1.27 NFPA – National Fire Protection Association
3.1.28 NIOSH – National Institute for Occupational Safety and Health
3.1.29 OSHA – Occupational Safety and Health Administration
3.1.30 PPE – personal protective equipment
3.1.31 PSIG – pressure in pounds per square inch, gauge
3.1.32 RO – reverse osmosis
3.1.33 SOW – Statement of Work
3.1.34 UFC – Unified Facilities Criteria
3.1.35 UFGS – Unified Facilities Guide Specifications
3.1.36 UL – Underwriters Laboratories
3.1.37 V – volts
3.2 Definitions
3.2.1 Plating Branch – the organization within CCAD that conducts electroplating and metal finishing operations.
3.2.2 Contractor – the organization that has been contracted to provide the equipment and services defined by the SOW.
3.2.3 Contracting Officer – also known as the KO, this is the individual that is authorized to enter into, administer, and/or terminate contracts, and make related determinations and findings on behalf of the Government. Note: This is the only individual who can legally bind the Government.
3.2.4 Contracting Officer’s Representative – also known as the COR, this is the individual that has been designated by the KO to provide contract surveillance and act as a liaison between the Government and the Contractor. This individual has the authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change to the contract, and has no funding implications. Note: This individual does NOT have the authority to change the terms and conditions of the contract.
3.2.5 Government – the organization that is purchasing the equipment and services defined by the
SOW.
4.0 REQUIREMENTS:
4.1 Switch Mode
4.2 Air Cooled
4.3 less than 1% ripple output over the rated voltage from 20% to 100 % of the rated voltage and full rated amperage.
4.4 Each rectifier must have a remote controller.
4.4.1 N- 13,16, 17, 18, 19, and 21 must include a “Forward – Reverse” selector switch. When in the “Forward” position the output connections will be positive and negative as marked and indicated by Red – Positive, Black – Negative bus bar supports. When the “Forward – Reverse” selector switch is in the “Reverse” position, the polarity is reversed. If the “Volt Adj” and “Amp Adj” potentiometers are not changed, the “Forward” and “Reverse” current and voltage will remain the same in either direction. The power supply is disabled for a short time during reversal of the output.
4.4.2 To properly interface with our current process logic controller (PLCs) SCADA system the rectifiers scaled output signals must be able to interface with the AB -1769-IF8 input card in the CompactLogix AB-1769:L33ER controller as currently configured. The output shall report the same readings as the remote-control unit and shall mirror the remote readings to the PLC, even after calibration. Ultimately must be able to view data with CCAD’s SCADA system.
4.4.3 The PLC’s are getting their 4-20ma output from the voltage and current meters located at our current remote stations for the monitoring values.
4.4.4 Must be able to with stand corrosive chemicals and low-pressure water from any direction.
4.4.5 Must contain digital voltage & amperage meters and shall have the following controls as a minimum: on/off, voltage adjustment, amperage adjustment, (Reverse and Forward switch for N tanks).
4.5 Power input: Contractor must make necessary adjustments to equipment to utilize existing power utilities and communication wires in place. See appendix A for current input specifications of existing rectifiers.
4.6 The rectifiers and remotes shall be rated for continuous duty at maximum power rating for 72 hours or longer between process batches. Rectifiers will be operated 24 hours per day, 7 days per week.
4.7 Operating Environment. The rectifiers shall be designed to operate in a plating shop environment. Base unit will be located on the first floor in a hot, humid environment. Remote control will be located on the second floor near the plating tank in a severely corrosive, hot, humid environment.
4.8 Remote controllers shall be powered by their respective rectifier and shall not be powered from an external source.
4.9 Remote controllers should also meet enclosure rating of NEMA 4X or equivalent. While rectifiers should meet an enclosure rating of IP 32 or equivalent.
4.10 Contractor shall perform a site visit prior to fabrication equipment to verify existing available wires and compatibility to the SCADA system. Any changes to existing wiring must be approved by the government.
4.11 New rectifiers and remote controllers must go in same location as existing equipment, therefore existing equipment will need to be moved by the contractor to a designated area indicated by the government.
4.12 Rectifiers must come with calibration certificate and paperwork.
4.13 Digital operations and maintenance manuals as well as drawings must be supplied prior to shipment of equipment and physical manuals at the conclusion of training.
6.0 INSPECTION AND ACCEPTANCE
6.1 Inspection and acceptance will be performed at CCAD by the COR. Objective evidence shall be provided by the Contractor of compliance with the requirements section 4.0.
6.2 A test plan for acceptance shall be developed by the Contractor.
6.3 Acceptance: Government acceptance of new equipment shall occur once the following occurs:
• All spare parts are provided
• All technical data and supporting documentation both physical and digital for the machine has been provided
• Successful implementation of the Government reviewed test plan in its entirety has occurred
• Equipment is functional and located in the proper location
• Training is completed
• Government inspection of the equipment utility installation
7.0 DELIVERABLES
Quantity (#) Quantity of Rev. and Fwd. (#) Output (Amps, Volts)
2 1 (N-13) 250 Amps, 0-12 Volts
3 2 (N-16, N-17) 500 Amps, 0-12 Volts
2 2 (N-18, N-19) 1000 Amps, 0-12 Volts
1 1 (N-21) 2000 Amps, 0-12 Volts
Total # of Rectifiers: 8
Total # of Controllers: 8
Total # with Rev. and Fwd.: 6
Total Rev. and Fwd.
Controllers: 6
Range: 250 to 2000 A, 0 to 12 V
7.1
(1) Input: 480 Volts, 6 Amps, 3 Phase, 60 Hertz Output: 250 Amps, 12 Volts, (FWD, REV)
N-13
(1) Input: 480 Volts, 12 Amps, 3 Phase, 60 Hertz Output: 250 Amps, 0-12 Volts
H-11
(1) Input: 480 Volts, 12 Amps, 3 Phase, 60 Hertz Output: 500 Amps, 0-12 Volts
R-12
(2) Input: 480 Volts, 23 Amps, 3 Phase, 60 Hertz Output: 500 Amps, 0-12 Volts, (FWD, REV)
N-16, 17
(2) Input: 480 Volts, 23 Amps, 3 Phase, 60 Hertz Output: 1000 Amps, 0-12 Volts, (FWD, REV)
N-18, 19
(1) Input: 480 Volts, 45 Amps, 3 Phase, 60 Hertz Output: 2000 Amps, 0-12 Volts, (FWD, REV)
N-21
8.0 TRAINING
8.1 After satisfactory completion of acceptance testing, a qualified representative (s) of the Contractor shall provide specialized training to familiarize personnel with the equipment and to help ensure reliable performance and maximum service life.
8.2 The Contractor shall provide the services of instructors who shall train maintenance and engineering personnel in operation, maintenance, calibration, safety precautions and requirements and any other pertinent information of the rectifier and remote equipment. Training shall be for a minimum of two (2), eight (8) hour days.
8.3 The Contractor shall provide the services of instructors who shall train operators and engineering personnel in the operation of the rectifiers and remote including, but not limited to, start-up, operating procedures, and safety requirements. This training shall use the Operations Manual and shall include actual hands-on instruction with the rectifiers and remote equipment.
Training shall be for a minimum of two (2), eight (8) hour days.
8.4 All training shall be provided by the Contractor during regular workdays from 08:00 to 16:30 Monday to Thursday excluding federal holidays. All training shall be provided in the English language. Training shall include in-classroom and hands-on sections. All printed training aids shall be supplied at no cost to the Government.
9.0 IUID AND NAMEPLATE
9.1 Nameplate: A corrosion resistance metal nameplate shall be securely attached to rectifier by the Contractor. The nameplate shall contain the information listed below:
Manufacturer's Name Manufacturer's Model Designation Manufacturer' Serial Number Power Input Characteristics and Rating
Power Ouput Characteristics and Rating Date of Manufacture Contract or Order Number
Appendix I: Safety Requirements
A. Safety: The following provides information pertaining to Safety and Accident Prevention:
B. The Contractor shall comply with FAR 52.236-13, Accident Prevention (November 1991).
C. The Contractor shall be conducted all work in a safe manner and in compliance with Federal, State, Local, Department of Defense, Army, and Depot regulations and national consensus standards.
D. The Contractor shall provide a Site-Specific Safety and Occupational Health Accident Prevention Plan (APP) and Activity Hazard Analysis (AHA).
D.1 Site-Specific Safety and Occupation Health Accident Prevention Plan (APP). The Contractor shall develop, promulgate, and enforce a written site-specific safety and occupational health accident prevention plan (Herein referred to as safety plan). The safety plan shall identify protocols and procedures to ensure a safe and healthful workplace. The safety plan shall be reviewed and deemed acceptable by the COR before beginning any on-site activities.
D.2 Activity Hazard Analysis (AHA). The Contractor shall identify in sequence the activities being performed, the specific anticipated hazard, equipment, materials, and the control measures to implemented to eliminate or minimize each hazard to an acceptable level of risk. The contractor shall use the more stringent standard when standards are different. The names of the competent and qualified person required for a particular activity (e.g., excavation, scaffolding, fall protection, or other activities as specified by OSHA) shall be identified and included in the activity hazard analysis, as well as proof of their competency and qualification. The analysis shall be reviewed and deemed acceptable by the COR before beginning any on-site activities.
E. Service Condition. No part of the services covered by the McNamara-O’Hara Service Contract Act of 1965 will be performed in buildings or surroundings or under working conditions, provided by or under the control or supervision of the Contractor or any Subcontractor, which are unsanitary or hazardous or dangerous to the health or safety of service employees engaged to furnish the services.
F. OSHA Recordkeeping. The contractor will submit an annual OSHA form 300A to the COR not later than 31 January of each calendar year if the contractor works 1000 on-site hours or more per quarter.
G. 29 CFR OSHA 1910.303(g) for the required working space about electrical equipment.
G.1 OSHA voltages are different from NFPA 70 (NEC).Space about electrical equipment for 600 Volts, nominal, or less to ground shall comply with 29 CFR 1910.303(g).The depth of working space in the direction of access to live parts may not be less than indicated in Table S-1 of 29 CFR
OSHA 1910.303.
G.1.1 Condition A – 36 inches - Exposed live parts on one side and no live or grounded parts on the other side of the working space or exposed live parts on both sides effectively guarded by suitable wood or other insulating material. Insulated wire or insulated busbars operating at not over 300 volts are not considered live parts.
G.1.2 Condition B – 42 inches - Exposed live parts on one side and grounded parts on the other side.
G.1.3 Condition C – 48 inches - Exposed live parts on both sides of the workspace (not guarded as provided in Condition A) with the operator between.
G.2 The width of free space in front of equipment shall be the width of the equipment or 30 inches, whichever is greater.
G.3 The minimum headroom of working spaces about service equipment, switchboards, panelboards, or motor control center shall be 6.5 feet.
Appendix II: Environmental Requirements
A. Compliance with Environmental Laws and Regulations: Contractor shall comply with all applicable federal, state, and local environmental laws, statutes, regulations, executive orders, permits, Army regulations (with supplements), as well as Major Subordinate Command (MSC) and installation regulations and policies. Contractor shall immediately report any conflicts between applicable federal, state, local environmental laws, statutes, executive orders, and provisions of Army Regulation 200-1, and any specifications within this contract to the Contracting Officer Representative (COR), as well as to the Chief of the Environmental Programs Compliance Division
(EPCD).
B. Compliance with Green Procurement Requirements: Contractor shall follow Federal EPA Comprehensive Procurement guidelines (www.epa.gov/cpg) and Army Contracting Command Quick Guide (https://acc.aep.army.mil/accapps/ACCMAP/Documents/Quick-Guide-for- Sustainable-Procurement.docx) for acquisition of building materials and products and select materials that have a long life cycle; the least toxic materials; recyclable materials; materials that are resource-efficient; recovered materials; bio-based materials; materials with the maximum recycled content; materials harvested on a sustained yield basis; and products causing the least pollution during their manufacture, use, and reuse, to the extent possible. No acutely toxic materials, polychlorinated biphenyls (PCBs), formaldehyde, asbestos containing materials, asbestos compounds, or fragile or brittle materials, shall be procured or furnished unless specifically approved by the procuring activity. No Class 1 ozone depleting compounds (ODCs) or equipment requiring such substances, even if contained in a closed looped system, shall be procured or furnished for use at government installations. No Class 2 ODCs or equipment requiring such substances shall be procured or furnished for use unless specifically approved in writing by the procuring activity.
C. Compliance with License and Certification Requirements and local permits and approvals:
Contractor shall obtain all licenses and certifications required by Federal, State, and Local environmental laws and regulations necessary and ensure such licenses and certifications remain current throughout the duration of the contracted work to adhere to the specifications of this contract The Contractor shall submit all plans, notifications, reports, submittal documents, and fees required by Federal, State, and Local environmental laws and regulations to the appropriate Federal, State, and Local authority or agency as necessary to adhere to the specifications of this contract. All required licenses and certifications required by Federal, State, and Local environmental laws or regulations shall be considered a contract deliverable upon award. It is the responsibility of the Contractor to identify and obtain all of the installations' required permits and approvals prior to commencement of any of the work specified under this contract and to meet all stipulated conditions and requirements at all times while performing any work. Contractor shall abide by all local and installation requirements and provide a site specific environmental plan as part of the deliverables.
Appropriate and detailed notification shall be provided by the Contractor to the Chief of the EPCD prior to excavating or conducting any kind of hot work anywhere on the installation where the work is to be performed.
D. Notification of Federal and State Regulators: Contractor shall immediately notify the Chief of the EPCD and the COR, or their designated backups in their absence, of the arrival on site of any Federal, State, or DoD environmental regulator or enforcement agent or the receipt of any correspondence from a Federal or State environmental agency.
E. Inspections of Work Sites: Contractor shall submit to potential Federal, State, Army and installation work site environmental regulatory inspections and/or investigations into noncompliance, and fully cooperate with such inspections/investigations by providing the appropriate records and documentation. Environmental regulatory agencies are authorized by law to inspect any work site for environmental compliance with regulatory requirements. The inspection will only require the work site environmental officer, or supervisor/manager to answer questions and/or escort the inspector to specific work site areas with the potential to affect environmental quality. If an inspection is conducted, it will not stop or disrupt ongoing contract activities, except, if the Contractor is requested by the regulatory inspector, the Contractor shall correct any regulatory problems during the inspection to the extent possible. Any regulatory inspections and their outcomes shall be communicated to the COR and to the Chief of the EPCD or their appointed backups.
Typical environmental work site inspections are conducted in less than 30 minutes with an approximate frequency of one inspection every two months. More frequent inspections may be required at the installation level and some may also require a close-out inspection prior to the Contractor vacating the work site. Inspections will focus on hazardous material management, solid and hazardous waste disposal, Pollution Prevention (P2), air quality, and waste water management, to include storm water requirements. Contractor shall obtain the Environmental Compliance Checklist from the EPCD at the start of the contract performance period.
F. Reporting Noncompliance: Contractor shall immediately report any nonconformance or noncompliance with applicable Federal, State or Local environmental laws, Army and installation environmental regulations or policies, as well as any actions taken to address and correct the noncompliance, to the COR and Chief of the EPCD, or their appointed backups in their absence.
G. Verification of National Environmental Policy Act Documents: Where applicable, the Contractor shall obtain from the COR or Chief of the EPCD, of project NEPA documentation.
These documents include but are not limited to a Categorical Exclusion, and NEPA checklist for this project. , H. Conformance with Environmental Management System: Contractor shall adhere to the guidelines stipulated by CCAD's Environmental Management System (EMS) during the performance of the contracted work and shall take the necessary actions to identify, monitor, and control those contract operations and activities that pose a risk of contamination, or can negatively impact the natural or human environment.
I. Generation of Solid Waste: Contractor shall remove from the installation and dispose of all solid waste that is generated through their contracted work, and which cannot be recycled, to an approved and permitted off-post disposal facility.
I.(a). Submit in writing the quantities of waste removed and quantities recycled to the Chief of the EPCD or designee on a monthly basis and at the expiration of the contract. The submittal shall include the date of disposal/recycling, the disposal/recycling facility, the types of material disposed/recycled and each of the quantities of materials disposed of and recycled by weight.
I.(b). The Contractor shall establish a program to promote cost-effective waste reduction in all operations and facilities covered by the contract. This includes collection, separation, and processing products or other materials recovered from solid waste streams for use in the form of raw materials.
I.(c). The Contractor shall make maximum effort to reduce and prevent waste and comply with Executive Order 13693 and the installation's waste management requirements. Upon completion of the contracted work, the Contractor shall conduct final clean-up of the work site, containerize any debris, and haul it away for appropriate disposal at no additional cost to the government. The COR or an Environmental Advocate shall be contacted for approval of the final clean-up work.
J. Generation of Hazardous Waste: Contractor shall abide by the guidelines stipulated in NASCC's Hazardous Waste Management Plan and shall assign all hazardous waste management responsibilities to the appointed ECD. Contractor shall contact the Chief of the EPCD to obtain technical assistance from the installation's Environmental Director who will assist the ECD with achieving and maintaining compliance with hazardous waste storage and disposal requirements. The EPCD will provide hazardous waste drums for the Contractor to containerize hazardous waste generated through the contracted work. Where liquid hazardous waste is to be stored, the Contractor shall provide appropriate secondary containment and ensure containers are properly bonded and grounded where the chemical waste requires it. In addition, the Contractor shall be responsible for maintaining an appropriate spill response and control kit at all times. All spills are reportable and shall be coordinated with the COR and the Chief of the EPCD. Contractor shall accumulate hazardous waste prior to disposal shipment in a satellite accumulation point at or near the point of generation or in a less-than-90-day site, in accordance with Federal, State, Army, and installation regulations or policies. The Government is responsible for removal of all hazardous waste.
Contractor shall contact the EPCD Chief for assistance. The Contractor shall provide a 24-hour notification to the Chief of the EPCD or designee that hazardous waste containers are ready for pick up and turn in by the EPCD. The EPCD will remove and dispose of manifested hazardous waste generated by contract activities from the installation to an approved, off-post, permitted hazardous waste disposal facility. The Contractor shall coordinate appropriately with the COR and the Chief of the EPCD the management of all hazardous waste to include profiling and final disposal. The Contractor shall perform a daily walk-through to ensure all hazardous material and all hazardous waste is properly secured and segregated by compatibility. Contractor shall reference section E of this appendix to ensure compliance with Federal, State and local laws and regulations.
K. Use of Hazardous Materials: Contractor shall contact the Chief of the EPCD to obtain technical assistance from the installation's Environmental Director who will assist the Contractor with achieving and maintaining compliance with hazardous materials management guidelines, to include requesting and obtaining an Approved Chemical List (ACL), labeling, storage, secondary containment, issue, use, and disposal requirements. Contractor shall submit to the COR or Chief of the EPCD a hazardous material inventory for any materials to be used in the performance of the contracted work. Where required by the Chief of the EPCD, the Contractor shall coordinate turn in and check out of all hazardous materials with a Hazardous Distribution Supply Center (HDSC) on a daily basis. The hazardous material inventory will be submitted 30 days prior to commencement of work for contracts that exceed 180 consecutive days and 15 days prior to commencement of work for contracts requiring under 180 days of consecutive work. The inventory list shall contain the hazardous material type and maximum quantities of materials anticipated to be used and stored on-site. The hazardous material shall be properly identified and labeled to include any applicable identification number, such as National Stock Number or Special Item Number and include any applicable hazardous materials management guidelines found on CCAD Regulation 200-16 and all applicable hazardous communication (hazcom) requirements or as required by the installation.
Contractor shall ensure all hazardous materials are properly secured and segregated by compatibility and kept under his or her control at all times. No expired hazardous materials shall be used or stored at the installation. Where applicable, and prior to bringing or removing hazardous materials on, at, or from the facilities where the contracted work is to be performed, the Contractor shall submit copies, preferably in electronic form, of Global Harmonization System (GHS) compliant Safety Data Sheets (SDSs) for all hazardous materials used and stored on-site during performance of the contract. Contractor shall not supply or deliver any hazardous materials or chemicals to an AMC installation that are listed on EPA toxic chemical list without prior written approval from Chief of the EPCD. During the performance of the contracted work, the Contractor shall ensure that hazardous material containers remain under the control of the user at all times and that containers are properly closed when the material is not in use. The Contractor shall not bring into a government installation any non-approved hazardous materials for use in the performance of their work. Where liquid materials are to be stored, the Contractor shall provide appropriate secondary containment and ensure containers are properly bonded and grounded where the chemical material requires it. In addition, the Contractor shall be responsible for maintaining an appropriate spill control kit at all times. All spills are reportable and shall be coordinated with the COR and the Chief of the EPCD.
The Contractor shall, upon completion of each day’s work, clean, remove, and properly containerize or dispose of any resultant hazardous waste generated by the work performed under this contract, where required by the installation. Upon completion of the contracted work, the Contractor shall conduct final clean-up of the work site, containerize any hazardous material/waste debris, and coordinate with the EPCD for pick up and turn in for disposal. Any unused hazardous material and any non-ozone depleting substances or refrigerants brought in by the Contractor shall be recovered and removed from the installation by the Contractor prior to vacating the work site. The COR or an Environmental Advocate shall be contacted for approval of the final clean-up work.
L. Prevention of Storm Water Pollution: The Contractor shall perform, track, participate, implement, and comply with storm water pollution prevention minimum control measures, protocols, and best management practices (BMP) and ensure that water quality standards are not violated in accordance with all regulations and policies as they apply to the State Pollutant Discharge Elimination System general permit requirements and any of the installation's guidelines.
this project requires minimal digging outside. However, during any excavation, Best Management Practices to prevent storm water pollution are required in accordance with the Navy’s Stormwater Pollution Prevention Plan (SWPPP). The project falls under the Texas General Construction Permit (TX150000) but does not require a site specific SWPP because disturbance will be less than one acre. • The Contractor shall control all pollutants, including waste materials and demolition debris that occur onsite and shall be handled and disposed of in a manner that does not cause contamination of storm water. Good housekeeping and preventative measures shall be taken at all times to ensure that the site will be kept clean, well-organized, and free of debris. All spills are reportable and shall be coordinated with the COR and the Chief of the EPCD. No discharges to the stormwater system or wastewater systems are allowed without explicit approval from the COR and the Chief of the EPCD.
M. Protection of Work Site Resources: Contractor shall confine all activities to areas defined by the drawings and specifications. Prior to the beginning of any work, the Contractor shall identify any land resources to be preserved within the work area. Except in areas indicated on the drawings or specified to be cleared, the Contractor shall not remove, cut, deface, injure, or destroy land resources including trees, shrubs, vines, grasses, topsoil, and landforms. The Contractor shall provide effective protection for land and vegetative resources at all times. Prior to site clearing and grubbing, or any sort of outdoor construction activity, the Contractor shall coordinate harvesting of saleable timber with the Chief of the EPCD. Contractor shall notify the Chief of the EPCD if any trees are required to be disposed or removed. The Contractor is not authorized to remove or dispose of any tree greater than 6 inches in diameter unless permission has been granted in writing by the Chief of the EPCD.
N. Prevention of Spills: The Contractor shall follow NASCC's Spill Prevention, Control, and Counter Measure (SPCC) Plan and reference the Corpus Christi Army Depot's (CCAD's) Spill Prevention Control and Countermeasures Plan (SPCCP) and Installation Spill Contingency Plan (ISCP) if transporting, processing, storing, or in any way managing hazardous waste, hazardous material, petroleum-oils-lubricants, or other restricted items. The Contractor shall ensure secondary containment is in place any time liquid materials are stored on-site and shall provide his or her own spill response supplies and have them readily available at each work site. In case of a spill, the person in control of the spill site, or their designated representative, shall take appropriate action to protect workers and bystanders; contain the spill (if it can be done safely); secure the spill site;
restrict ignition sources; and immediately contact the installation Fire and Emergency Services (Fire Department), the COR and the Chief of the EPCD. Contractors storing 1,320 gallons or more of any oil-based product in an aboveground storage tank at a construction site shall follow NASCC's SPCC Plan. The Contractor shall immediately respond to actual emergencies and accidents, prevent or mitigate associated adverse environmental impacts, and contact the installation's Fire and Emergencies Services.
P. Corrective Action for Noncompliance: Contractor shall take immediate corrective action when given a verbal or written notice of environmental noncompliance or nonconformance by the COR or the Chief of the EPCD. Failure or refusal by the Contractor to comply promptly may be grounds for the Contracting Officer to invoke the appropriate contractual remedies. This may cause all or part of the work to be stopped immediately until satisfactory corrective action has been taken by the Contractor.
Q. Mercury: Mercury is prohibited, unless specified otherwise, with the exception of mercury vapor lamps and fluorescent lamps. Dumping of mercury-containing materials and devices such as mercury vapor lamps, fluorescent lamps, and mercury switches in rubbish containers is prohibited.
Contractors shall remove any mercury vapor lamps, fluorescent lamps or mercury containing switches without breaking, pack them to prevent breakage, and transport them out of the activity in an unbroken condition for disposal as directed by COR or the Chief of the EPCD. The Contractor shall immediately report any instances of breakage or mercury spillage to the Chief of the EPCD and the Contracting Officer. The Contractor shall contact the EPCD any time there is a need for cleanup of a mercury spill area resulting from any work under this contract.
R. Universal Waste / e-Waste Management: Universal waste including, but not limited to, some mercury containing building products such as fluorescent lamps, mercury vapor lamps, high pressure sodium lamps, CRTs, batteries, aerosol paint containers, electrical equipment containing PCBs, and consumed electronic devices, shall be managed in accordance with applicable environmental law and installation instructions. The Contractor shall coordinate the management of these types of waste with the COR and the Chief of the EPCD.
S. Pollution Prevention / Hazardous Waste Minimization: The Contractor shall implement practices that reduce, eliminate, or prevent pollution at the source and make a conscious effort to minimize the use of hazardous materials and the generation of hazardous waste. Contractor shall consult with the EPCD for suggestions and to obtain a copy of the installation's pollution prevention/hazardous waste minimization plan for use as reference material to reduce environmental impacts generated through their work.
Appendix III: Fire Protection Requirements
A. Fire Protection Requirements and Plans
A.1 ATTENTION CONTRACTOR: Ensure that you and your subcontractors read and abide by this guide. All contractors and subcontractors are under the jurisdiction of the station Commanding Officer. Contractor shall comply with all pertinent provisions of the latest version of U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1,UFGS-01 35 26 and NFPA 241 Standard for Safeguarding Construction, Alteration, and Demolition Operations.
Structures in the course of construction, alteration, or demolition, including those in underground locations a fire safety plan will be required. Essential items to be emphasized include the following:
• Good housekeeping
• On-site security if necessary
• Installation of new fire…