STATEMENT OF WORK

FOR

B1030 Chamber Door Bladder Leak Repair

AT

Edwards AFB, California

17 October 2022

Table of Contents

1. GENERAL:

2. BACKGROUND

3. OVERVIEW DESCRIPTION OF SERVICES:

4. ADDITIONAL INFORMATION

5. GOVERNMENT FURNISHED PROPERTY/SERVICES:

6. ENVIRONMENTAL PROTECTION:

7. SECURITY REQUIREMENTS: ....................................................................................... Error! Bookmark not defined.

1. GENERAL:

This contract is required to maintain the 412 Electronic Warfare Group’s (EWG) Maintenance &

Logistics Operations Division ability to support current and future aircraft testing here at the

Avionics Test & Integration Complex (ATIC), Edwards Air Force Base, California.

2. BACKGROUND

2.1. The basic door system was designed, manufactured, and provided by Ferguson Door Company and the RF shielding portion was designed, manufactured, and provided by Ray Proof Shielding

Systems in 1988. The RFI shielded door is a single free standing horizontal sliding door leaf

200’ 10” wide by 65’ 11” high by 11’ 5” thick structure. Subsequent operational issues with the door have occurred resulting in multiple reports and repair efforts that this report will not attempt to summarize. This report will focus on the pneumatic seal bladder leak and any additional

2.2. The initial shielding system on the door has three continuous redundant rows of pneumatic inflatable seals (G-1-2 Mod). The seals are located on the door jambs, sill, and header of the chamber. Over each pneumatic seal are two rows of beryllium copper (BE-CU) finger stock. In between the two rows is a 1.5” wide wire electromesh. The two layers of finger stock are staggered (shingled). The finger stock and wire mesh are secured to the chamber with a 1” steel flat bar. When the pneumatic inflatable seals are inflated, they push against the finger stock/wire electromesh and mate with the door system to provide an RF seal.

3. OVERVIEW DESCRIPTION OF SERVICES:

3.1. While inflated, the chamber shielding integrity is maintained if the compressor motor can keep pressure in the leaking bladder. Continuous use of the door will likely cause the motor to continue to run and ultimately fail. It is recommended that the leaks be repaired. Repairs would be conducted as follows:

Source new bladder

Mobilize crew to BAF w/tools, supplies, replacement bladder and parts

Open door to expose door header to gain access to leak area

Remove steel flat bar covering seal system

Remove beryllium copper (BE-CU) finger stock and wire electromesh

Extract bladder from cavity

Mark and cut a 4’ section of the bladder and discard

Prep ends of existing section and new sections for

Install new section into existing section

Test for leak

Reinstall bladder, finger stock, wire electromesh

Reinstall steel bar

Return door to close position, latch and seal

Monitor the pressure at the pneumatic compressor to confirm no leaks

4. ADDITIONAL INFORMATION

All spills or releases of hazardous materials or hazardous wastes that occur during this project

(regard less of quantity or location of spill ) must be reported immediately to the 412

EWG/EWS project manager at 661-277-1791. Cleanup of spilled hazardous materials/wastes are the responsibility of the party who spilled it.

5. GOVERNMENT FURNISHED PROPERTY/SERVICES:

The Air Force Test Center (AFTC) will provide access to secure areas within 412 EWG Compound.

6. ENVIRONMENTAL PROTECTION:

6.1. Environmental Protection. The Contractor shall comply with all applicable Federal, state and local laws, regulations and standards, including Air Force and installation policies, directives and instructions, that are or may become applicable to the Contractor’s activities in performance of this SOW.

6.2.The Contractor shall ensure all hazardous materials (HM) are authorized and managed in compliance with FAR Clause 52.223-3, Hazardous Material Identification and Material Safety

Data, FAR Clause 52.223-5, Pollution Prevention and Right-to-Know Information and applicable sections of Air Force Manual 32-7002, Environmental Compliance and Pollution

Prevention, and Edwards Air Force Base (AFB) HM policy, to ensure compliance with

Emergency Planning and Community Right-to-Know Act of 1986 (42 U.S.C. 11001-11050), and

Pollution Prevention Act of 1990 (42 U.S.C. 13101-13109).

6.2.1. For all chemicals/materials (paints, adhesives, solvents, lubricants, cleaners, etc.)

procured for this contract by any means other than an installation HAZMART, the

Proponent/Contractor shall provide the following to the Contracting Officer Representative

(COR), at least 45 days prior to the start of the contract:

• Completed Contractor Hazardous Materials Usage Tracking Form

• Current Safety Data Sheets

6.2.2. The Contractor shall continue to provide material usage updates to the COR by the 5th of each month until the term of contract. The COR will forward all contractor provided information to the 412CEG/CEVC HM Program Manager. For guidance regarding tracking of HM, usage and regulatory requirements, or questions regarding completing this form, contact the Edwards AFB Environmental Management Office at (661) 277-1401 or email

412CEG.CEVC.HMWorkflow@us.af.mil. For questions concerning AFRL, call (661) 277-

5135.

6.2.3. Any products that meet the criteria of “Hazardous Waste” must be tracked until permanently removed from government property. Criteria for identifying hazardous waste are contained in Subpart C of 40 CFR Part 261. Note: Products containing chlorofluorocarbons (CFC’s) or ozone depleting substances shall not be allowed or approved for use.

6.2.4. The proponent/contractor shall ensure that all solid and hazardous waste management on this contract complies with all applicable sections of AFMAN 32-7002, and the Edwards Air

Force Base Hazardous Waste Management Plan (HWMP) and Integrated Solid Waste

Management Plan, the California Health and Safety Code (HSC), Title 22 California Code of

Regulations (CCR), and Title 40 Code of Federal Regulations (CFR).

6.2.5. Hazardous/regulated waste shall be disposed of under the Edwards AFB, US

Environmental Protection Agency (EPA) ID number, with Edwards AFB as the Generator, unless the Proponent/Contractor is considered “other persons” under the Resource

Conservation and Recovery Act (RCRA) and operates their HW activities independent of

Edwards AFB using their own US EPA ID number.

6.2.6. Signed HW disposal manifests shall be required for HW that may be generated on this contract prior to transportation for off-site disposal to a California Department of Toxic

Substance Control (DTSC) and/or US EPA-approved landfill or treatment facility. The

Proponent/Contractor shall submit draft manifests via email to the Edwards AFB

Environmental Management Office at 412CEG.CEVC.HWWorkflow@us.af.mil for review.

After the draft manifests have been approved, the waste shipment must be scheduled with the

Environmental Office to arrange for manifest signature by government personnel with

Signature Authority. Contact the Hazardous Waste Support Facility (HWSF) personnel at

(661) 277-3681, the 412CEG/CEVC HW Program Manager at (661) 277-1777, or email

412CEG.CEVC.HWWorkflow@us.af.mil for questions or additional information.

6.3. The Contractor shall comply with Pollution Prevention and Right-to-Know Information requirements. Control of environmental pollution requires consideration of air, water, and land uses, and involves the management of noise, solid waste, thermal energy and radioactive materials, as well as other pollutants. Protective measures shall be incorporated to control pollution and/or correct environmentally impacting conditions that may develop resulting from this contract. Environmental protection shall be provided during the life of the contract.

6.4.Recycling, Trash and Litter Control. The Contractor shall strive to recycle as much cardboard, paper, plastic, wood and metal as possible through the installation’s Qualified Recycling

Program (QRP), and shall develop a strict recycling, trash and litter control program. The recycling and litter control program shall consist of supplying an adequate number of covered recycling, trash and litter receptacles in all appropriate locations. The QRP may be able to provide limited additional recycling containers and bins as required (call 661-277-1167 for coordination). The contractor shall take precautions to prevent Foreign Object Debris (FOD) while working on or around the flight line. The contractor will be responsible to remove all debris as a result of the contract activity.

Contracting Officer Environmental Notification

The following Environmental Protection FAR Clauses are applicable:

FAR Clause Number

52.223-3: Hazardous Material Identification and Material Safety Data

52.223-5: Pollution Prevention and Right-to-Know Information

52.223-10: Waste Reduction Program

DFAR Clause Number

252.223-7001: Hazard Warning Labels mailto:412CEG.CEVC.HWWorkflow@us.af.mil mailto:412CEG.CEVC.HWWorkflow@us.af.mil

252.223-7006: Prohibition on Storage, Treatment, and Disposal of Toxic or Hazardous

Materials

OPSEC statements

OPSEC

The Contractor shall comply with established Operations Security (OPSEC) policies and procedures to protect classified, sensitive, and unclassified information and/or equipment, which is furnished to and operated by the Contractor.

Contractor shall maintain Operations Security (OPSEC) in accordance with DoD Directive 5201.2, the

DoD operations OPSEC Program.

7. SECURITY REQUIREMENTS

7.1 All Contractor employees will be subject to a criminal history background check IAW DoDM

5200.08V3_AFMAN 31-101V3, Installation Perimeter Access Control, and 412th Test Wing

Integrated Defense Plan (IDP) 31, Volume I (the AFMAN and IDP are both limited access documents but more details on the requirements/process in terms of background checks can be provided by the Contracting Office upon request). Vehicle registration, proof of insurance, and a valid driver's license must be presented for vehicles. Installation Commanders may deny access and credentials based on information obtained during identity vetting that indicates the individual may present a threat to the good order, discipline, and morale of the installation.

7.2 Base Access. For Contractor personnel who wish to obtain long-term Base access via an Air

Force Materiel Command (AFMC) Form 496, Application for AFMC Identification Card, IAW Air

Force Federal Acquisition Regulation Supplement (AFFARS) Clause 5352.242-9000, Contractor

Access to Air Force Installations, the Prime Contractor shall submit a written request on company letterhead to the CO with the following information (prior to submitting a request for Base access via an AFMC Form 496): 1) contract number, 2) location of work, 3) expiration date (must be on or before contract’s expiration date), and 4) names of employees/ subcontractor employees needing access to the base, to include each employee’s company name.

7.3 It is recommended that the Prime Contractor provide a copy of the request letter to each employee for verification purposes when the employee comes to the Contracting Office at Building

2800 to get their AFMC Form 496 signed. Employees for which no request letter can be found or provided will result in the employee being asked to return on another date/time so verification can be made.

7.4 Base passes will be limited to the length of the contract not to exceed 3 years from the date the

AFMC Form 496 is submitted to the Contracting Office for signature.

7.5 The AFMC Form 496 will be reviewed/approved by the CO, then taken by the Contractor employee to the Edwards AFB Pass & Registration Office in Building 3000 for the security portion and issuance of the Base pass.

7.6 The contractor shall comply with all base security regulations. Additionally, the contractor shall comply with actions dictated by force protection condition changes/measures. For real-world situations/exercises, changes to force protection conditions could impact contractor performance of work and can include denial of access to the installation to perform work

7.7 Only employees who will be working on the contract consistently/frequently should be submitted for a long term Base pass.

7.8 The Contractor shall comply with all security requirements imposed by the Installation.

Specific security considerations will be handled on an individual Task Order basis as required.

7.9 The contractor shall report suspicious activity (refer to Edwards AFB Contractor Antiterrorism

Awareness pamphlet) to Security Forces at 661-277-3340 in a timely manner.

7.10 The Contractor and its employees shall comply with all base traffic regulations.

7.11 No States are subject to Real ID Act enforcement at this time. The Department of Defense will accept standard State-issued driver's licenses and identification cards from all U.S. States and territories as proof of identity. Please visit the Department of Homeland Security's (DHS) website to get the latest information, https://www.dhs.gov/current-status-states-territories.

7.12 Contractor personnel who require routine physical access to the installation shall comply with

Level I - Antiterrorism Awareness training requirements. Routine physical access applies to contractor personnel whose contract, performance work statement/statement of work has a 45 day or more period of performance. AT Level I training provides contractor employees with the requisite knowledge necessary to remain vigilant for possible terrorist threats. AT Level I training can be taken at https://jkodirect.jten.mil/Atlas2/page/login/Login.jsf for non-Common Access Card (CAC) holders.

CAC holders may complete AT Level I training (Force Protection course) via myLearning at https://lms-jets.cce.af.mil/moodle/. AT Level I training will be completed by all contractor personnel within 30 days of requiring access and annually thereafter. Tracking for each contractor or subcontractor employee is the responsibility of the COR or unit Antiterrorism Representative.

7.13 The Contractor shall be responsible for safeguarding all government property, equipment and materials provided for Contractor use. At the end of each work period, all government facilities, equipment, and materials shall be secured.

7.14 During performance of the contract, the Contractor shall be responsible for obtaining required identification for newly assigned personnel.

7.15 The Contractor shall be responsible for prompt return of credentials and vehicle passes for: 1) any employee who no longer requires access to the work site; 2) upon request by a CO; and 3) upon completion or termination of the contract. The Prime Contractor shall ensure that all Base identification passes issued to employees and subcontractor employees are returned to the issuing office. Failure to comply with these requirements may result in withholding of payment.

https://www.dhs.gov/current-status-states-territories

7.16 Contractor employees are prohibited from possessing weapons, firearms or ammunition, on themselves or within Contractor-owned or privately owned vehicle while on Edwards AFB.

7.17 OPSEC - Contractor shall maintain Operations Security (OPSEC) in accordance with DoD

Directive 5201.2, the DoD operations OPSEC Program.

7.18 The contractor shall employ a team consisting of only United States citizens for this project.

Information required to the government prior to commencing work:

Full Name of the individual

Driver’s license number

Driver’s license state of issue