SCOPE OF WORK
FOR
Auxiliary Building Flood (RPUID #10656)
At U.S. Coast Guard Sector St. Petersburg
GENERAL REQUIREMENTS
PART 1 – General:
United States Coast Guard Sector St. Petersburg is accepting proposals for qualified individuals or firms to demolish flood damaged components of the Auxiliary Building at CG Sector St.
Petersburg. Prior to submitting a quote, it is mandatory to examine the SOW and it’s highly recommended to visit the facility to take field measurements, evaluations, etc, and become familiar with existing conditions under which the work will be performed. The POC is Don
Slowik, Phone: 727-824-7609, DONALD.J.SLOWIK@USCG.MIL or
Andy Galicia, Phone: 727-824-7599, Email: ANDY.GALICIA@USCG.MIL
PART 2 – Location:
U.S. Coast Guard Sector St Petersburg (South Moorings)
1301 Beach Dr. SE
St Petersburg, FL 33701
PART 3 – Facility Operating Hours:
The facility shall remain in operation throughout the service. Contractor access to the service site shall be limited to the following: 7:00am to 4:00pm, Monday through Friday, excluding holidays. Access to the site shall not be permitted on the weekends without prior approval from the Contracting Officer in writing.
PART 4 – Security Requirements
1. Contractor shall provide a list of names and copies of valid government issued ID’s for each member requiring access to the Coast Guard COR for access to the base. This shall be done a minimum of 3 days prior to starting work. Members that have not had background checks will not be granted access to the facility.
2. All personnel shall present ID to the security personnel at the entrance to the base.
PART 5 – Contractor Responsibilities:
SCOPE OF DEMOLITION:
Contractor shall provide all labor, materials, and equipment necessary to complete the following unless noted below:
1. Contractor shall remove and dispose of all damaged drywall within the Auxiliary building (Approximately all drywall up 4 feet from the floor) (Approximately 2300 SF).
2. Contractor shall remove and dispose of all damaged baseboards (Approximately 450 linear feet).
3. Contractor shall remove and dispose of all damaged vinyl flooring within the auxiliary building (Approximately 2,300 SF.)
4. Contractor shall remove and dispose of all kitchen cabinetry base cabinets, counter tops, and sink bowl.
5. Contractor shall remove and dispose of the damaged cabinetry, flooring, baseboards and drywall within the male and female restrooms.
mailto:DONALD.J.SLOWIK@USCG.MIL mailto:ANDY.GALICIA@USCG.MIL
6. Contractor shall dehumidify the building to prevent mold growth.
7. Contractor shall vacuum entire area with a HEPA vacuum.
8. Contractor shall apply an anti-microbial agent to all areas of potential mold growth.
9. Contractor shall clean and prepare all areas for new construction materials to be applied.
10. Contractor shall remove all contents of the building that is salvageable and reset in place upon completion of work.
PART 6– Cleanup:
1. Upon completion of each day all waste shall be removed and disposed of immediately from government property at the contractor’s expense.
2. Contractor shall maintain the area clean. The contractor shall not use Coast Guard dumpsters or any waste receptacles for disposal of debris.
3. Upon completion of each work day, contractor shall stow gear and cover work sight to ensure electrical and mechanical safety throughout the night.
PART 7 – Final Inspection and Acceptance:
1. When the contractor has completed all of the work, they shall notify the Coast Guard
(COR) for a final inspection.
2. Deliver all applicable warranties and paperwork
3. If the work is accepted, the contractor shall submit to the Coast Guard (COR):
Contractor’s notice of completion
Submittal of invoice(s) information will be provided once award of contract has been made.
PHOTOS AND SKETCHES
N/A