SOW Attachments_Expand Ambulatory Services at Building 19.pdf

PDF 4 MB Posted

Attached to
C1DA--(672-306) Expand Ambulatory Services at Building 19 Minor Design - Puerto Rico VAMC
Solicitation number
36C77623R0083
Issued by

View the file

Other files

File Type Posted
Technical Questions and VA Responses Tracking Final Response 4-21-23.pdf PDF
36C77623R0083_1.docx DOCX document
Updated - SOW_Expand Ambulatory Services Bldg. 19 Minor Design - March 31 2023.docx DOCX document
36C77623R0083.docx DOCX document
PPQ - Puerto Rico.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit – A Project Location

45.50n.s.f.97.20n.s.f.92.66n.s.f.

309.40n.s.f.

120.59n.s.f. 134.74n.s.f.98.30n.s.f.

SUBCOMPACT PARKING

UP

AREAWAY

STAIR

#1

AREAWAY

ELEC.

EQUIPMENT

AREAWAY

FD

FD

PARKING

ENTRANCE

EMERG.

DISTRIBUTION

UP

#6

STAIR

UP

AREAWAY

FD

SUBCOMPACT PARKING

UP

STOR.

BF102

BG103

BF100

BF100

B

BF109

STORAGE

LIGHT BULBS & EQUIP.

#5

STAIR

#3STAIR

BG110STORAGECARPENTRY

BG111ELECTRIC SHOPSTORAGE

BG112STORAGEBIOMEDICAL SHOP

STORAGE

INTERIOR DESIGN

BG114

AREAWAY

FD

AREAWAY

FD

2516.20n.s.f.

544.64n.s.f.

206.00n.s.f.

87.50n.s.f.

635.10n.s.f.

328.90n.s.f.

320.50n.s.f.

319.60n.s.f.

AREAWAY

884.00n.s.f.

BF110

STORAGE

MULTI

BF111

407.00n.s.f.

MULTI

STORAGE

AREAWAY

OPEN TO

ABOVE

AREAWAY

#8A

DN

STAIR

CHILLER

#9A

STAIR

DN

A.H.U.

DN.

STAIR #10

ENGINEERING

CORRIDOR

CORRIDOR

SUBCOMPACT PARKING

CORRIDOR

H.A.C.

TRASHFD

COLLECT

SIG.

ELEC.

LINEN

COLLECT

SIG.

ELEC.

MECHANICAL

PUMP ROOM

CORRIDOR

MECHANICALOXYGEN

STORAGE

BATTERY

P-1P-3

A.H.U.

CORRIDOR

LOBBY

AREAWAY

AREAWAY

CHARGING

ELEC.

EQUIPMENT

AREAWAY

FD

FD

PARKING

ENTRANCE

EMERG.

DISTRIBUTION

UP

#6

STAIR

UP

AREAWAY

FD

SUBCOMPACT PARKING

STOR.

BG103

BF100

BE128

BE125

CB-4

BE124a

BE123

BE121

BE122

CB-10

BE102

BE100

BE101

CB-2

CB-6

BE118

CB-11

BF100

B

CONTROL CENTER

A/C SHOP

BE124

ROOM

BE119

BF109

STORAGE

LIGHT BULBS & EQUIP.

#5

STAIR

CLOS.

BG110STORAGECARPENTRY

BG111ELECTRIC SHOPSTORAGE

OFFICE

CHIEF

BE119b

BE119c

& DINING AREA

KITCHEN

ROOM

S.P.D.

AREAWAY

FD

AREAWAY

FD

SIDEWALK

SIDEWALK

ROOM

6" 6"

6"

AREAWAY

BE123a

STORAGE

BF110

STORAGE

MULTI

BF111

MULTI

STORAGE

STORAGE

UP

UP

S-1 S-2 S-3

DN UP

UP

STAIR

DN

#7A

CREDIT

UNION

PLUMBING & HVAC SHOP

#9

STAIR

DN

A.H.U.

DN.

STAIR #10

ENGINEERING

BE118

CONTROL CENTER

A/C SHOP

BE119

OFFICE

BE127

BE128

OFFICE

BE131 BE132

OFFICE

CHIEF

BE119b

BE119c

& DINING AREA

KITCHEN

PURCHASING AGENTS

STORAGE

PROSTHETICS REPS

DIRECTOR

WAITING/FILES AREA

RECEPTION PURCHASING

AGENTS

SUPERVISOR

787 SF

0082.016Tilche Pedestal Lavatory 8"C WHT American Standard Inc.

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE0000

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

RAMP DN.

FIXT_CODEFU_TOTALFU_WASTEFU_HOTFU_COLDFIXT_CODEFU_TOTALFU_WASTEFU_HOTFU_COLD

CREDIT

UNION

ASIDASCOLORASNAMEASCATNO

OPEN TO

ABOVE

UP

AREAWAY

#8

DN

STAIR

PLUMBING & HVAC SHOP

#9

STAIR

DN

A.H.U.

DN.

STAIR #10

ENGINEERING

CORRIDOR

CORRIDOR

STAIR

#2

S-3S-2

CORRIDOR

FUTURE

ELEV.

MACHINE

S-1

H.A.C.

TRASHFD

COLLECT

SIG.

ELEC.

LINEN

COLLECT

SIG.

ELEC.

MECHANICAL

PUMP ROOM

#4

STAIR

CORRIDOR

UP

MECHANICALOXYGEN

STORAGE

BATTERY

FUTURE

p-1

P-2

DN. UP

P-3

CORRIDOR

LOBBY

CHARGING

BE125

CB-4

BE124a

BE123

BE121

BE122

CB-10

BE102

BE105

BE100

BE101

CB-2

CB-6

BE118

CB-11

CONTROL CENTER

A/C SHOP

BE124

ROOM

BE119

AGENT

BE127

BE132

CLOS.

OFFICE

CHIEF

BE119b

BE119c

& DINING AREA

KITCHEN

S.P.D.

1648.40n.s.f.

80.00n.s.f.

80.00n.s.f.

449.50n.s.f.331.00n.s.f.

1135.80n.s.f.

102.20n.s.f.

144.50n.s.f.

5276.20n.s.f.

62.50n.s.f.

745.40n.s.f.

891.30 n.s.f.

172.10n.s.f.

281.70n.s.f.

48.00n.s.f.

155.80n.s.f.

139.10n.s.f.

BE123a

429.60n.s.f.

STORAGE

REPRESENTATIVE

PROSTHETICS

DIRECTOR

STORAGE

PURCHASING

AGENTS

SUPERVISOR

787 SF

159.84n.s.f.

155.47n.s.f.

257.58 n.s.f.

0082.016Tilche Pedestal Lavatory 8"C WHT American Standard Inc.

1580.00n.s.f.

GIP WAREHOUSE

OFFICE

63.00n.s.f.

BE118b

BE118c

ATH

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

0000 OFFICE

OFFICE0000

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

RAMP DN.

FIXT_CODEFU_TOTALFU_WASTEFU_HOTFU_COLDFIXT_CODEFU_TOTALFU_WASTEFU_HOTFU_COLD

257.08n.s.f. 231.71n.s.f.

244.03n.s.f. 394.45n.s.f. 383.65 n.s.f.

800 n.s.f.

138.80n.s.f.

85.70n.s.f.

85.70n.s.f.

1320.35n.s.f.

85.70n.s.f.

49n.s.f.

49n.s.f.

184n.s.f.

184n.s.f.

OFFICE

OFFICE

OFFICE

OFFICE

PURCHASING

AGENT

PROSTHETICS

PURCHASING

CHIEF OF

WAITING AREA

OFFICE

STORAGE

OFFICE STAFF

OFFICE

OFFICE

OFFICE

OFFICE

CORRIDOR

TREATMENT

ROOM OFFICE

UP

BATH

MECHANICALMECHANICALMECHANICAL

MIS.

ASSIT

MED.

RECD.

SUPERVISOR

CORRIDOR

SEC. SUPRV. SUPRV.

CHIEF CH.

BE111

BE113 BE114

BE110

BE115

BE112

97.20n.s.f.92.66n.s.f.

309.40n.s.f.

120.59n.s.f. 134.74n.s.f.98.30n.s.f.

NEW PHARMACY ADMINISTRATIVE OFFICES

1 2 3 4 5

BATH.

TRANSCRIPTION

SUPV.

PHYS.

WORK

BE107

BE109

BE108

BE106

424.33n.s.f.

90.30n.s.f.

680.32n.s.f.

47.20n.s.f.

CODING OPD

CODING OPD

ELEV.

MACHINE

CB013LADIES

6 7

1,997 n.s.f.

MEN'S

WAITING

11 12 13109

16 17 18 19 20

4'-3"

6'-111 2"

5'-8"

21 22 23 24

25 26 28 29

6'-1"

6'-1"

3'-61 2"

5'

4'-6"

4'-6" 1'-2"

2'-3"

4'-41 2"

3'-11"

ELEV.

MACHINE

CB013LADIES

MEN'S

WAITING

NEW PHARMACY ADMINISTRATIVE OFFICES

CORRIDOR CORRIDOR

FILE

1,997 n.s.f.

REF.

ASSISTANCE

CHIEF

SERVICE

CHIEF

REF.

PRINTER

COPY

CLINICAL

COORDINATOR

PV PAYMENT

PROGRAM COORDINATOR

FILE

FILE

FILE

WAITING

AREA

STORAGE

COPYRECEPTION

CLERK

FILE

PACT

PHARMATECH

SUPERVISOR

SUPERVISOR

RESEARCH

COORDINATOR

FILE FILE

FILE FILE

ADPAC'S

& EDUCATION

REF.

FILE

CONFERENCE

3'-9"

2'-51 4"

3'-6"

4'-13 8"

SECRETARY

3'-10"

REF.

FILE

3'-03 8"

3'-61 8"

3'-81 4"

STORAGE

ACCESS TO

ADMIN BLDG

OFFICES

4380dgsf

1,220

2,100

This area will be for patient pick-up. Five parking spaces will be designated exclusively to picking up patients from the new ambulatory clinic. The A/E must plan and design this area for such purposes. The design must include floor slab, seating area, green area, and coverage from weather conditions (some sort of roof), among others. This area must be aesthetically pleasing and in harmony with the surrounding buildings.

This area has been designated for the construction of the new ambulatory clinic. In the event that we need to increase the footprint to meet the project requirements, the vehicular entrance of the parking cannot be lost or obstructed. In such case, the footprint increase should be done in a way that does not compromise the entrance.

In this area, the facility has electrical, mechanical, and storage rooms that serve OPA building.

Access to those rooms cannot be lost, limited or compromised due to this project. The A/E must take this into consideration and design functional access to those rooms. This access will be used for maintenance, repairs or replacement of the equipment in those rooms. Therefore, the access must be wide enough, uninterrupted and lead to the outside of the building effortlessly.

CONNECTION OF THE NEW AMBULATORY

CLINIC WITH THE OPA BUILDING

LEGEND

AutoCAD SHX Text

*SPACE NOT FOUND**SPACE NOT FOUND**SPACE NOT FOUND*

AutoCAD SHX Text

*SPACE NOT FOUND**SPACE NOT FOUND**SPACE NOT FOUND*

AutoCAD SHX Text

*SPACE NOT FOUND**SPACE NOT FOUND**SPACE NOT FOUND*B

AutoCAD SHX Text

*SPACE NOT FOUND**SPACE NOT FOUND**SPACE NOT FOUND*B

Exhibit – B Preliminary Space Program

Program for Design (5 PROCEDURES, NO CHANGE/DRESSING ROOM)

Functional Area Room Room Code Qty Area Net Area Comments

1 SUPPORT AREA Alcove, Clean Linen LCCL1 [[SC467]] 1 40 40 ok

2 SUPPORT AREA Alcove, Wheelchair SRLW1 [[SB252]] 1 40 40

3 SUPPORT AREA Housekeeping Aides Closet

(HAC)

JANC1 1 60 60

4 SUPPORT AREA medication room MEDP1 [[SV583]] 1 80 80

5 SUPPORT AREA Storage, Equipment [[240 S.F.

Between 6 & 10

[[CGE61]] 1 240 240 c-arms, fluroscopies stored after use

6 SUPPORT AREA Storage_instruments, Sterile [[2 X 80 for 6 to 10 rooms}}

SRS04 [[CGE56]] 1 80 80 updated to ONE as for FIVE procedure rooms. Update to TWO if SIX P. Rooms.

SUPPORT AREA EHRM/OIT ROOM ?? 1 100 100 ADDED, per conversation with Zoltan, was not on

SEPS

7 SUPPORT AREA Utility Room, Clean [120 S.F.

between 6 & 10 P. Rooms]

UCCL1 [[SB737]] 1 120 120

8 SUPPORT AREA Utility Room, Soiled [100 S.F.

between 6 & 10 P. Rooms]

USCL1 [[SB743]] 1 100 100

1 SPS SPS_Decontamination Room, Scope

USCL2 [[CGE41]] 1 120 120

2 SPS SPS_Reprocessing Room, Scope

USCL3 [[CGE46]] 1 120 120

3 SPS SPS_Anteroom disinfection 1 100 100 Ver SPS guides 60 +60 ppe

4 SPS SPS_Anteroom sterilization 1 100 100 Ver soil room

5 SPS SPS_Storage, Clean Scope [[80 S.F. for 6 to 10 rooms]]

USCL4 [[CGE51]] 1 80 80

1 RECEPTION AREA check in (REGISTRATION_Reception /

RCP02 (SC183) 1 260 260

2 RECEPTION AREA Consult Room_2 per 5 to 6 procedure rooms_REDUCED

OFDC2 (SC271) 2 100 200

3 RECEPTION AREA Kiosk, Patient Check-In RCHK2 (SC165) 1 60 60 CUT BACK TO ONE @ 60 sq.ft.

4 RECEPTION AREA Patient Education / Resource Room_REDUCED

CLSC3 [SC171] 1 100 100

5 RECEPTION AREA Patient Education_workstation

SC172 1 40 40

6 RECEPTION AREA Waiting (SB003, 540 NSF FOR

6 ROOMS)

WTG06 (sb003) 1 260 260

7 RECEPTION AREA TOILET VISITOR SB191 1 60 60

1 procedure_ENDO_PM&Rwith anesthesia boom and carts

PROCEDURE Room-ENDO_

PM&R

TRPE2 1 360 360

2 procedure_ENDOSCOPY ONLY_with anesthesia boom and carts

Procedure Room, G.I.

Endoscopy [[annual Colonoscopy, EGD, Esophageal Manometry, Flexible Sigmoidoscopy procedures projected]]

TREE1 (CGE11) 3 320 960

3 procedure_ENDOSCOPY/BRONCHO _with C-ARM

Procedure Room, G.I.

Endoscopy [[annual ERCP, Endoscopic Ultrasound procedures projected]] NEED

PROCEDURES PER YEAR

TREE1 (CGE14) 1 360 360

5 5 1040 1 prep & recovery-ENDOSCOPY Recovery_PREP HOLDING_

{10 X 10} CUBICLE_

CGE26 9 100 900

2 prep & recovery-ENDOSCOPY Recovery ROOM_PACU_3 WALLS_ {11.5'x10'}_2 spaces per 1 procedure

RROP1 (CGE21) 10 120 1,200 from 115 to 120 to fit grid

3 prep & recovery.y isolation anteroom_pacu RECOVERY, ISOLATION ANTE_ CSS243 1 80 80 ok

4 prep & recovery.y isolation_pacu RECOVERY, ISOLATION??

NUMBER PER PROCEDURE

CS242 1 160 160 ok

5 prep & recovery.y isolation_pacu Restroom, ISOLATION 1 60 60 prep & recovery PATIENT CHANGING ROOM 0 160 0 ADDED, per conversation with Zoltan

5 prep & recovery ed 0 60 0 ADDED, per conversation with Zoltan

7 prep & recovery.x ed NCWD4 [SV381] 1 120 120 from 124 to 120 to fit grid

8 prep & recovery.x Nurse Station 1@ 120 per 5 to 8 P. Rooms

NSTA3 [SC152] 1 120 120

8 prep & recovery.x Nurse Station PACU 1@ 120 per 5 to 8 P. Rooms

NSTA3 [SC152] 1 120 120 added cause of 2 separate holding areas

9 prep & recovery.x Toilet, Prep / 2 per 3 to 6 P.

Rooms

[SB201] 2 60 120

10 prep & recovery.x Storage, Equipment [[120 S.F.

if btween 5 & 8 p.rooms

SRE01 [[CGE31]] 1 120 120

11 prep & recovery.x Alcove, Crash Cart RCA01 [[SC052]] 1 20 20

12 prep & recovery.x Alcove, Equipment [2 between 5 & 8]

RCA02 [SC079] 2 30 60

13 prep & recovery.x Exam / Assessment Room EXRG0 [CGE17] 1 120 120

1 MISC alcove, blanket warmer 1 20 20 2 MISC alcove, portable imaging 1 40 40 3 MISC Control Station 1 120 120 4 MISC medication room 0 80 0 repeated (see #4 under suppor area) 5 MISC Scrub / sink? 1 20 20 ask Zoltan

6 MISC alcove, Stretcher Storage(one per two OR

1 40 40

EXRG0 [CGE17]

ANESTHESIA clean workroom anesthesia 1 120 120 yes, pre-cleaning of instruments ANESTHESIA equipment room anesthesia

{1 PER PROCEDURE=6 + 4

BACK UP= 10]

1 120 120 yes

ANESTHESIA gas cylinder 1 80 80 yes, from 81 to 80 ANESTHESIA team room anesthesiaology6 workstations [7 x7 feet cubicles]

2 49 98 [2 providers to chart, reduced to place 2 cubicles 98 to 100 sq. ft.}

1 ADMIN AREA BREAK ROOM, Staff_1@ 140 per 6 to 10 procedure

SL001 [SS262 ] 1 140 140

2 ADMIN AREA Copier / OFFICE SUPPLY Room RPR01 [SS272] 1 80 80

3 ADMIN AREA Office, Digestive Diseases - Endoscopy Service Chief

OFA09 [SS204] 1 100 Shared by Clinicians

4 ADMIN AREA visitor waiting WTG03[[SB0003]] 1 80 80

5 ADMIN AREA Workstation, Admin.

SUPPORT [[1 between 1&10 P. Rooms}}[7 x7 feet cubicles]

OFA07 [SS218] 1 49 49

6 ADMIN AREA Office, Nurse Manager OFA09 [SS204] 1 90 90

7 ADMIN AREA Toilet w/shower, Staff_FEMALE ((LEFT AT A.S.C. standards other wise 60 s.f.))

TNPG1 [SB174] 1 60 60

8 ADMIN AREA Toilet w/shower, Staff_MALE TNPG1 [SB174] 1 60 60

9 ADMIN AREA locker changing room female_1 @ 200 per 6 p.

rooms ((LEFT AT A.S.C.

standards other wise 100 s.f.))

SS232 1 100 100

10 ADMIN AREA locker changing room male_1 @ 200 per 6 p. rooms ((LEFT AT A.S.C. standards other wise 100 s.f.))

SS241 1 100 100

11 ADMIN AREA Workstation, resident[fellows] and nurses [7 x7 feet cubicles]

OFA07 [SS218] 14 49 686 number 14 per service?

GROSS SQ. FT. 9,343

N.T.G. FACTOR X 1.65

NET SQ.F.T. = 15,416

Program for Design (6 procedures)

1 SUPPORT AREA Alcove, Clean Linen LCCL1 [[SC467]] 1 40 40 ok

2 SUPPORT AREA Alcove, Wheelchair SRLW1 [[SB252]] 1 40 40

3 SUPPORT AREA Housekeeping Aides Closet (HAC)

JANC1 1 60 60

4 SUPPORT AREA medication room MEDP1 [[SV583]] 1 80 80

5 SUPPORT AREA Storage, Equipment [[240 S.F. Between 6 &

[[CGE61]] 1 240 240 c-arms, fluroscopies stored after use

6 SUPPORT AREA Storage_instruments, Sterile [[2 X 80 for 6 to 10 rooms}}

SRS04 [[CGE56]] 2 80 160 updated to ONE as for FIVE procedure rooms. Update to TWO if SIX P. Rooms.

SUPPORT AREA EHRM/OIT ROOM ?? 1 100 100 ADDED, per conversation with Zoltan, was not on

SEPS

7 SUPPORT AREA Utility Room, Clean [120 S.F. between 6 & 10 P.

Rooms]

UCCL1 [[SB737]] 1 120 120

8 SUPPORT AREA Utility Room, Soiled [100 S.F. between 6 & 10 P. Rooms]

USCL1 [[SB743]] 1 100 100

1 SPS SPS_Decontamination Room, Scope

USCL2 [[CGE41]] 1 120 120

2 SPS SPS_Reprocessing Room, Scope

USCL3 [[CGE46]] 1 120 120

3 SPS SPS_Anteroom disinfection

1 100 100 Ver SPS guides 60 +60 ppe

4 SPS SPS_Anteroom sterilization

Zoltan 1 100 100 Ver soil room

5 SPS SPS_Storage, Clean Scope [[80 S.F. for 6 to 10 rooms]]

USCL4 [[CGE51]] 1 80 80

1 RECEPTION AREA check in (REGISTRATION_Recept ion /

RCP02 (SC183) 1 260 260

2 RECEPTION AREA Consult Room_2 per 5 to 6 procedure rooms_REDUCED

OFDC2 (SC271) 2 100 200

3 RECEPTION AREA Kiosk, Patient Check-In RCHK2 (SC165) 1 60 60 CUT BACK TO ONE @ 60 sq.ft.

4 RECEPTION AREA Patient Education / Resource Room_REDUCED

CLSC3 [SC171] 1 100 100

5 RECEPTION AREA Patient Education_workstation

SC172 1 40 40

6 RECEPTION AREA Waiting (SB003, 540

NSF FOR 6 ROOMS)

WTG06 (sb003) 1 260 260

7 RECEPTION AREA TOILET VISITOR SB191 1 60 60

0 procedure_Ophtalmology_with anesthesia boom and carts

Procedure Room Ophta TREE1 1 320 320

1 procedure_ENDO_PM&Rwith anesthesia boom and carts

PROCEDURE Room-

ENDO_ PM&R

TRPE2 1 360 360

2 procedure_ENDOSCOPY ONLY_with anesthesia boom and carts

Procedure Room, G.I.

Endoscopy [[annual Colonoscopy, EGD, Esophageal Manometry, Flexible Sigmoidoscopy procedures projected]]

TREE1 (CGE11) 3 320 960

3 procedure_ENDOSCOPY/BRONCHO _with C-ARM

Procedure Room, G.I.

Endoscopy [[annual ERCP, Endoscopic Ultrasound procedures projected]] NEED

PROCEDURES PER YEAR

TREE1 (CGE14) 1 360 360

5 6 1040 1 prep & recovery-ENDOSCOPY Recovery_PREP

HOLDING_ {10 X 10}

CUBICLE_

CGE26 10 100 1,000

2 prep & recovery-ENDOSCOPY Recovery

ROOM_PACU_3

WALLS_ {11.5'x10'}_2 spaces per 1 procedure

RROP1 (CGE21) 10 120 1,200 from 115 to 120 to fit grid

3 prep & recovery.y isolation anteroom_pacu

RECOVERY, ISOLATION

ANTE_

CSS243 1 80 80 ok

4 prep & recovery.y isolation_pacu RECOVERY, ISOLATION?? NUMBER

PER PROCEDURE

CS242 1 160 160 ok

5 prep & recovery.y isolation_pacu Restroom, ISOLATION 1 60 60 prep & recovery PATIENT dressing

ROOM

1 160 160 ADDED, per conversation with Zoltan

5 prep & recovery PATIENT dressing restrm

1 60 60 ADDED, per conversation with Zoltan

7 prep & recovery.x Alcove, Refreshment Center (nourishment station and seating area)

NCWD4 [SV381] 1 120 120 from 124 to 120 to fit grid

8 prep & recovery.x Nurse Station HOLDING 1@ 120 per 5 to 8 P.

Rooms

NSTA3 [SC152] 1 120 120

8 prep & recovery.x Nurse Station PACU 1@ 120 per 5 to 8 P. Rooms

NSTA3 [SC152] 1 120 120 added cause of 2 separate holding areas

9 prep & recovery.x Toilet, Prep / 2 per 3 to 6 P. Rooms

[SB201] 2 60 120

10 prep & recovery.x Storage, Equipment [[120 S.F. if btween 5 & 8 p.rooms

SRE01 [[CGE31]] 1 120 120

11 prep & recovery.x Alcove, Crash Cart RCA01 [[SC052]] 1 20 20

12 prep & recovery.x Alcove, Equipment [2 between 5 & 8]

RCA02 [SC079] 2 30 60

13 prep & recovery.x Exam / Assessment Room

EXRG0 [CGE17] 1 120 120

1 MISC alcove, blanket warmer 1 20 20

2 MISC alcove, portable imaging

1 40 40

3 MISC Control Station 1 120 120 4 MISC medication room 0 80 0 repeated (see #4 under suppor area) 5 MISC Scrub / sink? 1 20 20 ask Zoltan 6 MISC alcove, Stretcher

Storage(one per two

OR

1 40 40

EXRG0 [CGE17]

ANESTHESIA clean workroom anesthesia 1 120 120 yes, pre-cleaning of instruments ANESTHESIA equipment room anesthesia {1 PER

PROCEDURE=6 + 4

BACK UP= 10]

1 120 120 yes

ANESTHESIA gas cylinder 1 80 80 yes, from 81 to 80 ANESTHESIA team room anesthesiaology6 workstations [7 x7 feet cubicles]

180 2 49 98 [2 providers to chart, reduced to place 2 cubicles 98 to 100 sq. ft.}

1 ADMIN AREA BREAK ROOM,

Staff_1@ 140 per 6 to 10 procedure

SL001 [SS262 ] 1 140 140

2 ADMIN AREA Copier / OFFICE SUPPLY Room

RPR01 [SS272] 1 80 80

3 ADMIN AREA Office, Digestive Diseases - Endoscopy Service Chief

OFA09 [SS204] 1 100 Shared by Clinicians

4 ADMIN AREA visitor waiting WTG03[[SB0003]] 1 80 80

5 ADMIN AREA Workstation, Admin.

SUPPORT [[1 between 1&10 P. Rooms}}[7 x7 feet cubicles]

OFA07 [SS218] 1 49 49

6 ADMIN AREA Office, Nurse Manager OFA09 [SS204] 1 90 90

7 ADMIN AREA Toilet w/shower, Staff_FEMALE ((LEFT AT A.S.C. standards other wise 60 s.f.))

TNPG1 [SB174] 1 60 60

8 ADMIN AREA Toilet w/shower, Staff_MALE

TNPG1 [SB174] 1 60 60

9 ADMIN AREA locker changing room female_1 @ 200 per 6

p. rooms ((LEFT AT A.S.C. standards other wise 100 s.f.))

SS232 1 100 100

10 ADMIN AREA locker changing room male_1 @ 200 per 6 p.

rooms ((LEFT AT A.S.C.

standards other wise 100 s.f.))

SS241 1 100 100

11 ADMIN AREA Workstation, resident[fellows] and nurses [7 x7 feet cubicles]

OFA07 [SS218] 14 49 686 number 14 per service?

GROSS SQ. FT. 10,063

N.T.G. FACTOR x 1.65

NET SQ.F.T. = 16,604

4. SOW_Expand Ambulatory Services at Building 19 20
4. SOW_Expand Ambulatory Services at Building 19 21
4. SOW_Expand Ambulatory Services at Building 19 22
4. SOW_Expand Ambulatory Services at Building 19 23
4. SOW_Expand Ambulatory Services at Building 19 24
4. SOW_Expand Ambulatory Services at Building 19 25
4. SOW_Expand Ambulatory Services at Building 19 26
4. SOW_Expand Ambulatory Services at Building 19 27
4. SOW_Expand Ambulatory Services at Building 19 28
SOW Attachments_Expand Ambulatory Services at Building 19

File details come from the government source that posted it. Updated .