SOW Attachment.pdf

PDF 752 KB Posted

Attached to
Crossover Cable Replacement at Lock and Dam 2 in Hastings, MN
Solicitation number
W912ES25QA020
Issued by

About this file

This document is a Statement of Work (SOW) Attachment for a cable replacement project at Lock and Dam No. 2 in Hastings, MN. The project involves replacing segments of Dam Feeder No. 1 and Dam Feeder No. 2 circuits, removing unused cables in the crossover system, and reorganizing existing cable routing. Key requirements include dewatering the crossover system, identifying and documenting active cables, replacing four specific cables between manholes 1 and 2, and ensuring one dam feeder circuit remains serviceable during work.

The project is solicited by the Department of the Army Corps of Engineers Engineering District St. Paul under Solicitation Number W912ES25QA020. Critical project specifications include working within 10-hour daily work periods, coordinating with the Contracting Officer, following electrical safety standards, and submitting a dewatering plan and work schedule. A pre-bid site visit is scheduled for May 5, 2025, at 10:30 am, and the contractor must submit an Accident Prevention Plan compliant with Corps of Engineers safety requirements. Work is restricted during high-water river flow conditions exceeding 40,000 cubic feet per second.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Figure 1-1. Dam Feeder Cable Routing Through Crossover System.

Figure 1-2. Manhole 2 Cable Routing.

Figure 1-3. Cable Routing in Land Wall Crossover Tunnel.