SOW Attachment (1) Contract Drawings.pdf
PDF 4 MB Posted
- Solicitation number
- N6449823Q4001
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVAL SURFACE WARFARE CENTER
PHILADELPHIA DIVISION
PHILADELPHIA NAVY YARD ANNEX
PHILADELPHIA, PENNSYLVANIA
BUILDING 4
AHU-3 Cooling Coil Replacement
VICINITY PLAN LOCATION PLAN
G-001
N .T
.S
CO
VE
R
SH
EE
T
SECURITY BADGING OFFICE
CONTRACT ADMINISTRATION AND
OVERSIGHT OFFICES
PROJECT SITE
15 4 3 2
A
B
C
D
5 14 3 2
PROJECT NORTH
DR
AW
N B
Y:
DE
SI
GN
ED
B Y:
DW
G
N
AM
E:
SH
EE
T
SI
ZE
CO
DE
SA
VE
D
AT
E:
.2 4.
SC
AL
E:
PL
O
T
DA
TE
.2 4.
N O
TE
S:
of 04
N
SW
C P
D
IN
FR
A
ST
R
U C
TU
R
E A
C Q
U
IS
IT
IO
N S
U P
P O
R T
PH
IL
AD
EL
PH
IA
, P A
N
AV
AL
S
U
RF
AC
E
W
AR
FA
RE
C
EN
TE
R
BU
IL
DI
N
G
FL
O
O R
AH
U -3
C oo lin g
Co il
Re pl ac em en t
AR
CH
D (2
4-in
. x
4-in
REVISION TABLE
SYM DESCRIPTION DATE APPR
PREFINAL DRAWING 10/24/22
RM
S
RJ
S
SO
W
A
TT
A C
H M
EN
T
(1
MEP-001
N .T
.S
M
EC
HA
N
IC
AL
G
EN
ER
AL
N O
TE
S
SY
M
BO
LS
MECHANICAL ABBREVIATIONS GENERAL MECHANICAL NOTES
1. GENERAL NOTES ARE DISCIPLINE SPECIFIC, AND APPLY TO EVERY DRAWING IN THAT DISCIPLINE. GENERAL SHEET NOTES APPLY TO WORK
SHOWN ON A DRAWING. SHEET KEY NOTES NOTES APPLY TO INDIVIDUAL SITUATIONS AND EQUIPMENT.
2. WORK MUST BE PERFORMED IN ACCORDANCE WITH FEDERAL, STATE AND LOCAL CODES AND STANDARDS ENFORCED BY THE LOCAL
REGULATING AUTHORITIES.
3. COMPLETELY EXAMINE THE SITE AND OBSERVE THE CONDITIONS UNDER WHICH THE WORK WILL BE INSTALLED. NO ALLOWANCES WILL BE MADE FOR ERRORS OR OMISSIONS RESULTING FROM THE CONTRACTOR'S FAILURE TO COMPLETELY EXAMINE THE SITE.
4. INSTALL NEW WORK SUCH THAT CLEARANCES ARE PROVIDED AS REQUIRED BY THE MANUFACTURER TO ALLOW FULL ACCESSIBILITY FOR
OPERATION AND ROUTINE MAINTENANCE OF COMPONENTS.
5. CONTRACTOR SHALL COMPLETELY RESEAL ALL NEW OR MODIFIED OPENINGS AND PENETRATIONS IN THE AIR HANDLING UNIT ENCLOSURE AT THE
COMPLETION OF WORK IN ACCORDANCE WITH ASHRAE STANDARDS.
6. COMPLY WITH SMACNA "HVAC DUCT CONSTRUCTION AND STANDARDS" AND OTHER APPLICABLE STANDARDS INCLUDED IN THE SPECIFICATIONS
FOR THE CONSTRUCTION AND SUPPORT OF DUCT ACCESS DOORS, UNLESS OTHERWISE NOTED.
7. MAKE PROPER CONNECTION TO FIXTURES AND EQUIPMENT. DRAWINGS ARE SCHEMATIC AND BRANCH MAINS, ELBOWS,AND CONNECTIONS ARE
NOT ALL SHOWN.
8. COORDINATE INSTALLATION OF PIPING AND EQUIPMENT WITH MECHANICAL AND ELECTRICAL DISCIPLINES, AS WELL AS OTHER PLUMBING WORK.
9. DIMENSIONS ARE IN INCHES UNLESS OTHERWISE NOTED.
10. DETAILS WITHOUT SPECIFIC REFERENCES TO A LOCATION MUST BE APPLIED TO THE GENERAL INSTALLATION OF MECHANICAL WORK.
11. INSTALL ALL MATERIAL AND EQUIPMENT IN ACCORDANCE WITH THE MANUFACTURER'S WRITTEN INSTRUCTIONS. PROVIDE ALL MATERIAL NOT FURNISHED BY THE MANUFACTURER BUT NECESSARY FOR A COMPLETE INSTALLATION AT NO ADDITIONAL COST TO THE GOVERNMENT.
12. ALL WORK SHALL CONFORM THE SAFETY REQUIREMENTS DEFINED IN THE UNITED STATES ARMY CORP OF ENGINEERS EM 385-1-1 HEALTH AND
SAFETY REQUIREMENTS MANUAL.
13. NO WORK MAY BEGIN ON A SYSTEM UNTIL ALL PRE-WORK SUBMITTALS ARE APPROVED AND MATERIAL IS ONSITE..
14. CONTRACTOR SHALL SEQUENCE WORK SUCH THAT DOWNTIME ON THE AHU IS MINIMIZED.
15. AHU IS WINTERIZED BETWEEN 15 OCTOBER AND 15 APRIL OF EACH CALENDAR YEAR. FINAL ACCEPTANCE OF CHILLED WATER COILS CANNOT
OCCUR DURING THIS PERIOD.
16. PROVIDE NEW INSULATION ON ALL NEW PIPING, VALVES, AND FITTINGS OR WHERE INSULATION IS REMOVED TO SUPPORT ADJACENT WORK.
17. CONTRACTOR SHALL SCHEDULE AND SEQUENCE WORK SUCH THAT THE DURATION THE UNIT IS INOPERABLE IS MINIMIZED TO THE MAXIMUM
EXTENT PRACTICAL.
MECHANICAL SYMBOLS
15 4 3 2
A
B
C
D
5 14 3 2
PROJECT NORTH
DR
AW
N B
Y:
DE
SI
GN
ED
B Y:
DW
G
N
AM
E:
SH
EE
T
SI
ZE
CO
DE
SA
VE
D
4.
SC
AL
E:
PL
O
T
DA
TE
.2 4.
N O
TE
S:
of 04
N
SW
C P
D
IN
FR
A
ST
R
U C
TU
R
E A
C Q
U
IS
IT
IO
N S
U P
P O
R T
PH
IL
AD
EL
PH
IA
, P A
N
AV
AL
S
U
RF
AC
E
W
AR
FA
RE
C
EN
TE
R
BU
IL
DI
N
G
FL
O
O R
AH
U -3
C oo lin g
Co il
Re pl ac em en t
AR
CH
D (2
4-in
. x
4-in
REVISION TABLE
SYM DESCRIPTION DATE APPR
PREFINAL DRAWING 10/24/22
RM
S
RJ
S
UNION
3-WAY CONTROL VALVE
TW
THERMOMETER
THERMAL WELL
PRESSURE GAUGE
WITH SHUT-OFF COCK
AIR VENT WITH PLUG
DRAIN VALVE WITH
HOSE COUPLING
MOTORM
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
ASHRAE AMERICAN SOCIETY OF HEATING, REFRIGERATING
AND AIR-CONDITIONING ENGINEERS
BAS BUILDING AUTOMATION SYSTEM
BTU BRITISH THERMAL UNIT
CFM CUBIC FEET PER MINUTE
CHWS CHILLED WATER SUPPLY
D.B. DRY BULB
DDC DIRECT DIGITAL CONTROLLER
EX EXISTING
°F DEGREES FAHRENHEIT
FPM FEET PER MINUTE
FT FOOT OR FEET
GPM GALLONS PER MINUTE
HOA HAND/OFF/AUTO SWITCH OR INDICATOR
HP HORSEPOWER
MBH THOUSAND BTUS PER HOUR
MEP MECHANICAL-ELECTRICAL-PLUMBING
PSI POUNDS PER SQUARE INCH
RF RETURN FAN
RPM REVOLUTIONS PER MINUTE
SF SUPPLY FAN
SYS SYSTEM
VFD VARIABLE FREQUENCY DRIVE
W.B. WET BULB
WG WATER GAUGE
MEP-101
N .T
.S
M
EC
HA
N
IC
AL
G
EN
ER
AL
N O
TE
S
SY
M
BO
LS
GENERAL MECHANICAL NOTES
1. EQUIPMENT AND PIPING SHOWN ON THIS SHEET IS SHOWN TO CONVEY GENERAL LAYOUT OF THE SPACE RELATIVE TO OTHER MAJOR HVAC
EQUIPMENT. DRAWING IS NOT PROVIDED TO CONVEY ACTUAL DIMENSIONS NOR IS IT PROVIDED AS A COMPREHENSIVE LAYOUT OF FEATURES
AND OBSTRUCTIONS IN THE VICINITY OF THE WORK SITE.
2. DUCTWORK NOT SHOWN FOR CLARITY.
3. SUPPLY AND RETURN PIPING FOR CHILLED WATER AND GLYCOL LOOPS ARE SIMPLIFIED ON THIS DRAWING AND DO NOT SHOW ALL BRANCH LINES, FITTINGS, VALVES, GAUGES, AND COMPONENTS. REFER TO DRAWING MEP-501 FOR MORE DETAILS ON PIPING CONFIGURATION.
15 4 3 2
A
B
C
D
5 14 3 2
PROJECT NORTH
DR
AW
N B
Y:
DE
SI
GN
ED
B Y:
DW
G
N
AM
E:
SH
EE
T
SI
ZE
CO
DE
SA
VE
D
4.
SC
AL
E:
PL
O
T
DA
TE
.2 4.
N O
TE
S:
of 04
N
SW
C P
D
IN
FR
A
ST
R
U C
TU
R
E A
C Q
U
IS
IT
IO
N S
U P
P O
R T
PH
IL
AD
EL
PH
IA
, P A
N
AV
AL
S
U
RF
AC
E
W
AR
FA
RE
C
EN
TE
R
BU
IL
DI
N
G
FL
O
O R
AH
U -3
C oo lin g
Co il
Re pl ac em en t
AR
CH
D (2
4-in
. x
4-in
REVISION TABLE
SYM DESCRIPTION DATE APPR
PREFINAL DRAWING 10/24/22
RM
S
RJ
S
SCALE: 1/4" = 1'-0"A4 FOURTH FLOOR PLAN
AHU-2AHU-3
AHU-7
AHU-6
CH
ILL
ER
CH
ILL
ER
CH
ILL
ER
RF-3
AHU-1 AHU-2AH
U-
AH
U-
AHU-7
AHU-4 CT-2CT-1
AHU-6
CH
ILL
ER
CH
ILL
ER
CH
ILL
ER
RF-3
M
M
KEY PLAN
SF-3
AHU-3 DDC
1. AIR HANDLING UNIT (AHU) 3 BRANCH SUPPLY AND RETURN PIPING CONTINUES TO MAINS FOR CHILLED WATER AND HOT GLYCOL LOOPS. PIPING IS INSULATED WITH A JACKETED 1-INCH THICK FIBERGLASS INSULATION.
2. PROVIDE NEW CHILLED WATER COILS WITH PRESSURE RELIEF FREEZE PROTECTION AND PROVIDE PREFABRICATED ACCESS
DOORS TO SERVICE RELIEF VALVES.
3. EXISTING BAS DDC CABINET.
NEW WORK KEY NOTES:
CH
W
S
CH
W R
GS
GR
3/4" DRAIN W/GATE VALVE
& HOSE COUPLING (EX)
& HOSE COUPLING (EX)
3/4" DRAIN W/GATE VALVE
EXISTING CHWS
PIPING (EX)
EXISTING BALL VALVE - NO WORK
PRESSURE GAGE
W/ BALL VALVE
REPLACE
COOLING COILS
FOR NEW SIZING
EXISTING CHWR
PIPING (EX)
CALIBRATED
BALANCING VALVE (EX)EXIISTING
THERMOMETER WITH
SEPARABLE SOCKET
- NO WORK
EXISTING AIR VENT -
3/4" GATE VALVE
WITH CAP (EX) - NO
WORK
EXISTING 3-WAY CONTROL
VALVE W/ PNEUMATIC
ACTUATOR - NO WORK
REDUCER (EX) - NO WORK
UNION (EX) - NO WORK
N .T
.S
M
EC
HA
N
IC
AL
D
ET
AI
LS
GENERAL SHEET NOTES
1. DETAILS PROVIDED ON THIS SHEET ARE DIAGRAMMATIC ONLY. THE DETAILS ARE NOT TO SCALE, DO NOT REFLECT THE ACTUAL GEOMETRIC
CONFIGURATION OF THE PIPING SYSTEM, AND DO NOT DEPICT ALL ADJACENT OBSTRUCTIONS. CONTRACTOR SHALL OBTAIN AND/OR VERIFY ALL
DIMENSIONS AND COMPONENTS.
15 4 3 2
A
B
C
D
5 14 3 2
PROJECT NORTH
DR
AW
N B
Y:
DE
SI
GN
ED
B Y:
DW
G
N
AM
E:
SH
EE
T
SI
ZE
CO
DE
SA
VE
D
4.
SC
AL
E:
PL
O
T
DA
TE
.2 4.
N O
TE
S:
MEP-201
N
SW
C P
D
IN
FR
A
ST
R
U C
TU
R
E A
C Q
U
IS
IT
IO
N S
U P
P O
R T
PH
IL
AD
EL
PH
IA
, P A
N
AV
AL
S
U
RF
AC
E
W
AR
FA
RE
C
EN
TE
R
BU
IL
DI
N
G
FL
O
O R
AH
U -3
C oo lin g
Co il
Re pl ac em en t
AR
CH
D (2
4-in
. x
4-in
REVISION TABLE
SYM DESCRIPTION DATE APPR
PREFINAL DRAWING 10/24/22
RM
S
RJ
S
SCALE: N.T.S.
EXISTING AIR HANDLING UNIT COIL & PIPING
CFM THRU
COIL
FACE VEL.
(FPM)
AIR
FRICTION IN.
WG.
AIR ENT.
TEMP (°F)
AIR LEAVING
TEMP (°F)
TOTAL
SENSIBLE
HEAT RATIO
TOTAL LOAD
(MBH) MIN. ROWS FINS PER
FOOT
WATER
FLOW (GPM)
WATER P.D.
(FT. H20)UNIT ENT. WATER
TEMP (°F)
D.B. W.B. D.B. W.B.
CHILLED
WATER
COIL
22,575 456 0.27 80.0 67.0 60.2 57.9 0.76 657.8 4 86 109.5 98 44
EXISTING COIL HEAT EXCHANGER SCHEDULE
NOTES:
1. CONTRACTOR SHALL DEMO EXISTING COILS FROM AHU-3. THE EXISTING CHILLED WATER COILS ARE STACKED IN PARALLEL AND ARE APPROXIMATELY 112-INCHES WIDE BY 72-NCHES HIGH IN TOTAL DIMENSION. EACH COIL IS 112-INCHES WIDE X 36-INCHES HIGH.
2. CONTRACTOR SHALL PROVIDE AND INSTALL NEW THERMAL EXCHANGE COILS, TYPICAL FOR CHILLED WATER SYSTEMS COILS STACKED VERTICALLY. PROVIDE COILS WITH PLUGGED VALVE AIR VENTS. THE CONTRACTOR SHALL SIZE NEW COILS PER THE NEW COILS SCHEDULE ABOVE. THE NEW COILS WILL NEED TO BE INCREASED IN SIZE VERTICALLY OR THE CONTACTOR CAN INSTALL ADDITIONAL COILS TO MEET
THE NEW COIL SCHEDULE. THE WIDTH AND DEPTH OF THE COILS SHALL REMAIN UNCHANGED.
3. THE CONTRACTOR SHALL MODIFY THE EXISTING AHU-3 DUCT WORK AS REQUIRED TO ENCAPSULATE THE NEW DIMENSIONS FOR THE NEW COILS. THE CONTRACTOR SHALL STRUCTURALLY REINFORCE THE NEW DUCT WITH ANGLE IRON OR OTHER SUTABLE MATERIALS.
THE DUCT MODIFICATION SHALL BE MADE FOR THE FULL UPSTREAM AND DOWNSTREAM COOLING COIL SECTION OF THE AHU. THE CONTRACTOR SHALL BRACE THE NEW COILS FROM FALLING OVER AGAINST THE TOP AND SIDES OF THE NEW DUCTWORK.
4. THE CONTRACTOR SHALL SEAL AND CAULK ALL OPENINGS AROUND NEW COOLING COILS. ALL AIR FLOW SHALL BE DIRECTED THRU
THE NEW COILS.
5. THE CONTRACTOR SHALL PROVIDE NEW DRAINS AND STAINLESS COIL PANS FOR THE NEW COILS. ALL INTERNAL AHU DRAINS SHALL BE COPPER. THE CONTRACTOR SHALL INSTALL A NEW DRAIN TO THE OUTSIDE MATCHING THE EXISTING SETUP.
6. THE CONTRACTOR SHALL INSULATE ALL NEW INTERNAL DUCT TO MATCH EXISTING INSULATION THICKNESS AND MATERIAL. THE CONTRACTOR SHALL REPLACE ALL FRAYED AND TORN EXISTING INSULATION WITHIN THE AHU WITH NEW INSULATION TO MATCH EXISTING
INSULATION THICKNESS AND MATERIAL.
7. THE EXISTING BYPASS DUCT, BYPASS DAMPER, AND BYPASS ACTUATOR DIRECTLY ABOVE THE COILS SHALL BE REMOVED AND DISCARDED. ALL POWER OR PNEUMATIC LINES SHALL BE SAFED BACK AT THE SOURCE. THE EXISTING BYPASS DUCT MAY BE REUSED IF
SUFFICIENT FOR PORTIONS OF THE NEW COIL ENCLOSURE.
8. THE CONTRACTOR IS RESPONSIBLE FOR ANY PIPING MODIFICATIONS REQUIRED TO FIT THE NEW COILS TO THE EXISTING PIPING.
9. THE CONTRACTOR SHALL PROVIDE FREEZE PROTECTION PRESSURE RELIEF VALVES ON CHILLED WATER COILS. PROVIDE ACCESS TO VALVES. ACCESS OPENING SHALL PROVIDE SUFFICIENT CLEARANCE FOR INSPECTION AND MAINTENANCE OF FREEZE PROTECTION VALVES AND SHALL BE IN ACCORDANCE WITH MANUFACTURER RECOMMENDED CLEARANCES. OPENING SHALL BE FACTORY FABRICATED ACCESS DOORS THAT UTILIZE QUARTER TURN FASTENERS OR CAM LOCKS AND SHALL BE GASKETED AND/OR SEALED FOR AN AIRTIGHT SEAL
10. IF THE HOT GLYCOL PIPING IS DISTURBED DURING THE COMPLETION OF THIS WORK, CONTRACTOR SHALL PROPERLY RECLAIM ALL
LIQUID DRAINED FROM LINES, AND REPLACE/REFILL GLYCOL PIPING SYSTEM AS REQUIRED.
11. ALL CHILLED WATER DRAINED MAY BE PROPERLY DISCARDED. NO REPLACEMENT IS REQUIRED.
FIN HEIGHT
(INCHES)
FIN LENGTH
(INCHES)
NUMBER OF
COILS
36 112 2
NOTE: DIMENSIONS PROVIDED ARE APPROXIMATE. CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO SELECTING COILS.
CFM THRU
COIL
FACE VEL.
(FPM)
AIR
FRICTION IN.
WG.
AIR ENT.
TEMP (°F)
AIR LEAVING
TEMP (°F)
TOTAL
SENSIBLE
HEAT RATIO
TOTAL LOAD
(MBH) MIN. ROWS FINS PER
FOOT
WATER
FLOW (GPM)
WATER P.D.
(FT. H20)UNIT ENT. WATER
TEMP (°F)
D.B. W.B. D.B. W.B.
CHILLED
WATER
COIL
30, 700 Max 500 0.27 80.0 67.0 60.2 57.9 0.76 894.54 4 >85 TBD BY
CNTR
NEW COIL HEAT EXCHANGER SCHEDULE
FIN HEIGHT
(INCHES)
FIN LENGTH
(INCHES)
NUMBER OF
COILS
112 2 or 3
NOTE: DIMENSIONS PROVIDED ARE APPROXIMATE. CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO SELECTING COILS THE NEW SIZING OF THE COILS SHALL BE DETERMINED BY THE CONTRACTOR PER THE NEW CFM THRU THE COIL.
TBD by
CNTR
TBD by
CNTR
neal.j.moran Inserted Text
File details come from the government source that posted it. Updated .