SOW Attachment 01_VHA Required Div 01 Spec Sections.pdf

PDF 115 KB Posted

Attached to
C1DA--EHRM Infrastructure Upgrades East Orange, NJ (VA-22-00016518)
Solicitation number
36C77622R0098
Issued by

About this file

This notice requests Standard Form 330 qualification packages from firms for an Architect-Engineering contract to provide design services for East Orange Campus EHRM Infrastructure Upgrades in New Jersey. Services include network infrastructure installation, renovations and upgrades to information technology systems across multiple buildings and sites. Qualification packages are due by July 11, 2022.

The contract is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses. The NAICS code is 541330 and size standard is $16.5 million. The design must be complete within 325 calendar days of award. Construction value is estimated between $20-50 million. Selection will be based on specialized experience with similar projects, professional qualifications of staff, capacity to complete the work on schedule, and past performance. Knowledge of the project locality and experience providing construction period services are also evaluation factors.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHA Required Division 01 – General Requirement Specification Sections

* Note that these have been identified as required Division 01 specifications for this EHRM project. It is the responsibility of the A-E to determine if there are other specifications to include.

01 00 00 – General Requirements

01 32 16.01 - Architectural and Engineering CPM Schedules

01 32 16.15 – Project Schedules (Small Projects – Design/Bid/Build)

01 33 23 - Shop Drawings, Product Data, and Samples

01 35 26 – Safety Requirements

01 42 19 – Reference Standards

01 45 00 - Quality Control

01 45 29 – Testing Laboratory Services

01 57 19 - Temporary Environmental Controls

01 74 19 – Construction Waste Management

01 81 13 – Sustainable Construction Requirements

01 91 00 - General Commissioning Requirements

File details come from the government source that posted it. Updated .