SOW Attachment 01 - VHA Required Div 01 Spec Sections.pdf
PDF 115 KB Posted
- Solicitation number
- 36C77621R0123
About this file
This pre-solicitation notice requests Standard Form 330 qualification packages from architecture and engineering firms for the Veterans Health Administration's Amarillo EHRM Infrastructure Upgrades project located in Amarillo, Texas. Firms must submit SF-330 responses by June 13, 2021 to be considered for the initial evaluation phase. The project involves design and construction management services for network infrastructure installation, IT system upgrades, electrical and mechanical system renovations, and security improvements. The anticipated award date for the A-E contract is August 2021 with a 144-day design period. The construction value is estimated between $10-20 million. The contract will be set aside for Service-Disabled Veteran-Owned Small Businesses. Evaluation criteria include specialized experience, professional qualifications, capacity, past performance, locality knowledge, and construction period experience. The highest rated firms will be invited for discussions and negotiations.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VHA Required Division 01 – General Requirement Specification Sections
* Note that these have been identified as required Division 01 specifications for this EHRM project. It is the responsibility of the A-E to determine if there are other specifications to include.
01 00 00 – General Requirements
01 32 16.01 - Architectural and Engineering CPM Schedules
01 32 16.15 – Project Schedules (Small Projects – Design/Bid/Build)
01 33 23 - Shop Drawings, Product Data, and Samples
01 35 26 – Safety Requirements
01 42 19 – Reference Standards
01 45 00 - Quality Control
01 45 29 – Testing Laboratory Services
01 57 19 - Temporary Environmental Controls
01 74 19 – Construction Waste Management
01 81 13 – Sustainable Construction Requirements
01 91 00 - General Commissioning Requirements
File details come from the government source that posted it. Updated .