SOW Attachment 01 - VHA Required Div 01 Spec Sections.docx
DOCX document 19 KB Posted
- Solicitation number
- 36C77622R0065
About this file
This document includes a Statement of Work (SOW) attachment outlining required specification sections and a related federal contract opportunity notice seeking Standard Form 330 submissions from architectural and engineering firms.
The Department of Veterans Affairs is seeking design services for infrastructure upgrades at the Corporal Michael J. Crescenz Veterans Affairs Medical Center in Philadelphia to support a new Electronic Health Record Modernization system. Required specifications and scope of work include renovating existing IT closets, providing fiber optic and electrical upgrades, and physical security assessments. Interested firms must submit Standard Form 330 statements of qualifications by May 20th, with the highest rated firms invited to provide written responses. The awarded design contract is set aside for Service-Disabled Veteran-Owned Small Businesses and has a period of performance of 365 days from notice to proceed. Construction period services are optional line items that will be determined upon award of the construction contract.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VHA Required Division 01 – General Requirement Specification Sections
* Note that these have been identified as required Division 01 specifications for this EHRM project. It is the responsibility of the A-E to determine if there are other specifications to include.
01 00 00 – General Requirements 01 32 16.01 - Architectural and Engineering CPM Schedules 01 32 16.15 – Project Schedules (Small Projects – Design/Bid/Build) 01 33 23 - Shop Drawings, Product Data, and Samples 01 35 26 – Safety Requirements 01 42 19 – Reference Standards 01 45 00 - Quality Control 01 45 29 – Testing Laboratory Services 01 57 19 - Temporary Environmental Controls 01 74 19 – Construction Waste Management 01 81 13 – Sustainable Construction Requirements 01 91 00 - General Commissioning Requirements
File details come from the government source that posted it. Updated .