SOW Attachment 01 - VHA Required Div 01 Spec Sections.docx

DOCX document 19 KB Posted

Attached to
C1DA--EHRM Infrastructure Upgrades - Asheville, NC
Solicitation number
36C77622R0028
Issued by

About this file

This presolicitation notice seeks standard form (SF) 330 architect-engineer qualification packages for a firm-fixed-price design contract to provide architect-engineering services for the development of complete construction documents including working drawings, specifications, reports, commissioning, and construction period services for the EHRM Infrastructure Design at the Charles George Veterans Administration Medical Center in Asheville, North Carolina. The project requires a full design team and has a 270 calendar day period of performance for completion of design. Responses are due by January 14, 2022. Evaluation criteria include specialized experience and technical competence in network infrastructure projects, professional qualifications of staff, capacity to accomplish work on schedule, past performance, knowledge of the project locality, and experience in construction period services. The project is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHA Required Division 01 – General Requirement Specification Sections

* Note that these have been identified as required Division 01 specifications for this EHRM project. It is the responsibility of the A-E to determine if there are other specifications to include.

01 00 00 – General Requirements 01 32 16.01 - Architectural and Engineering CPM Schedules 01 32 16.15 – Project Schedules (Small Projects – Design/Bid/Build) 01 33 23 - Shop Drawings, Product Data, and Samples 01 35 26 – Safety Requirements 01 42 19 – Reference Standards 01 45 00 - Quality Control 01 45 29 – Testing Laboratory Services 01 57 19 - Temporary Environmental Controls 01 74 19 – Construction Waste Management 01 81 13 – Sustainable Construction Requirements 01 91 00 - General Commissioning Requirements

File details come from the government source that posted it. Updated .