This pre-solicitation notice seeks standard form SF 330 architect-engineer qualification packages for design services related to infrastructure upgrades at the DC Veterans Affairs Medical Center to support a new electronic health record modernization system. Firms must submit qualifications by December 19, 2022. The selected firm will provide investigative and feasibility design, schematic design drawings, design development drawings, construction documents, specifications, cost estimates, and construction period services. Key project elements include upgrading facility fiber, electrical outlets, HVAC distribution, and physical security to current standards. Construction period services will include responding to requests for information, attending meetings, reviewing submittals and shop drawings, conducting site visits, and preparing record drawings. The award date for the design contract is March 15, 2023 and the design period of performance is 144 calendar days. This is a 100% set-aside for verified service-disabled veteran-owned small businesses.

View the file

Other files

File Type Posted
36C77623R0003_2.docx DOCX document
Continuation Page Modification to Contract Opportunities.docx DOCX document
36C77623R0003_1.docx DOCX document
AE Design SOW - EHRM Infrastructure Upgrades 688-22-700.pdf PDF
PPQ - EHRM DCVAMC.docx DOCX document
SOW Attachment 02 - VA OEHRM Site Infrastructure Req.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHA Required Division 01 – General Requirement Specification Sections

* Note that these have been identified as required Division 01 specifications for this EHRM project. It is the responsibility of the A-E to determine if there are other specifications to include.

01 00 00 – General Requirements

01 32 16.01 - Architectural and Engineering CPM Schedules

01 32 16.15 – Project Schedules (Small Projects – Design/Bid/Build)

01 33 23 - Shop Drawings, Product Data, and Samples

01 35 26 – Safety Requirements

01 42 19 – Reference Standards

01 45 00 - Quality Control

01 45 29 – Testing Laboratory Services

01 57 19 - Temporary Environmental Controls

01 74 19 – Construction Waste Management

01 81 13 – Sustainable Construction Requirements

01 91 00 - General Commissioning Requirements