SOW Attachment 01 General Requirement Specification Sections.pdf
PDF 115 KB Posted
- Solicitation number
- 36C77623R0003
About this file
This pre-solicitation notice seeks standard form SF 330 architect-engineer qualification packages for design services related to infrastructure upgrades at the DC Veterans Affairs Medical Center to support a new electronic health record modernization system. Firms must submit qualifications by December 19, 2022. The selected firm will provide investigative and feasibility design, schematic design drawings, design development drawings, construction documents, specifications, cost estimates, and construction period services. Key project elements include upgrading facility fiber, electrical outlets, HVAC distribution, and physical security to current standards. Construction period services will include responding to requests for information, attending meetings, reviewing submittals and shop drawings, conducting site visits, and preparing record drawings. The award date for the design contract is March 15, 2023 and the design period of performance is 144 calendar days. This is a 100% set-aside for verified service-disabled veteran-owned small businesses.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C77623R0003_2.docx | DOCX document | |
| Continuation Page Modification to Contract Opportunities.docx | DOCX document | |
| 36C77623R0003_1.docx | DOCX document | |
| AE Design SOW - EHRM Infrastructure Upgrades 688-22-700.pdf | ||
| PPQ - EHRM DCVAMC.docx | DOCX document | |
| SOW Attachment 02 - VA OEHRM Site Infrastructure Req.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VHA Required Division 01 – General Requirement Specification Sections
* Note that these have been identified as required Division 01 specifications for this EHRM project. It is the responsibility of the A-E to determine if there are other specifications to include.
01 00 00 – General Requirements
01 32 16.01 - Architectural and Engineering CPM Schedules
01 32 16.15 – Project Schedules (Small Projects – Design/Bid/Build)
01 33 23 - Shop Drawings, Product Data, and Samples
01 35 26 – Safety Requirements
01 42 19 – Reference Standards
01 45 00 - Quality Control
01 45 29 – Testing Laboratory Services
01 57 19 - Temporary Environmental Controls
01 74 19 – Construction Waste Management
01 81 13 – Sustainable Construction Requirements
01 91 00 - General Commissioning Requirements