SOW Att 1 - Repair Mission Planning.pdf

PDF 291 KB Posted

Attached to
Repair 176WG Mission Planning Room
Solicitation number
W50S6L22B0003
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOW Attachment 1. Site Plan Drawing FXSB211866, Repair Mission Planning, Hangar 18, 4 December 2021

332 33

3. Remove windows (x3), and drywall off.

Paint and finish to match surroundings.

4. Demo closet. Repair walls, ceiling, and floor.

1. Demolish raised flooring and railing. Repair floor and wall(s) and install carpet and resilient cove base.

6. Relocate Quad Screen from North wall to East wall. Exact location to be coordinated with user. Provide proper wall mount and support. Repair walls to match surrounding finishes, as needed.

Briefing Station

5. Install quad electrical outlet and telecommunication outlet to run Audio/Visual equipment at briefing station.

Install conduit. Telecomm. wiring will be purchased/installed by a third party.

7. Relocate ceiling mounted projector pole.

Exact location to be coordinated with user.

Projector Pole

8. Remove drop ceiling and lights in rooms 331, 332, 326, and the hallway connecting the three offices. Replace carpet and cove base. Install LED lights in hallway, dimmable LED lights in rooms. Install occupancy sensors in rooms and hallway. Repair HVAC supply/return to match 324’s setup. Repair fire suppression sprinklers (to match 324). Finish/paint 331, 332, 326, and hallway to match room 324’s color scheme. These areas shall be identical in finished appearance to room 324.

2. Install power pole for furniture/fiber.

Channel shall match room 324’s channels.

Exact location to be coordinated with user.

9. Replace door/hardware with STC-45 rated door.

10. Repair ceiling, patch hole and paint/finish to match surrounding ceiling.

11. Above this area (approximate location), which is accessed via Janitor closet’s (rm. 340) vertical ladder, the holes in wall shall be repaired per 11a requirement (see next page).

FOR REFERENCE ONLY

SOW Attachment 1. Site Plan Drawing FXSB211866, Repair Mission Planning, Hangar 18, 4 December 2021

11a. Repair wall to meet ICD-705 SDC-45 wall requirements. Area is located above rooms 335 and 336, access to area is through vertical ladder in Janitor Closet, Room 340. Holes shall be patched to leave a professional patch job appearance but doesn’t need to be painted.

FOR REFERENCE ONLY

File details come from the government source that posted it. Updated .