This pre-solicitation notice seeks SF 330 submissions from SDVOSB firms for Architect-Engineering design services. The project involves expanding behavioral health, laboratory, and imaging areas at an Eglin Air Force Base VA clinic with a period of performance of 280 calendar days from notice of award. Submissions are due by March 26, 2024 with evaluations made on factors including professional qualifications of key personnel, specialized experience in medical facility additions and upgrades, capacity, past performance, knowledge of the locality, and experience in construction period services. The contract is a 100% SDVOSB set-aside with a maximum page limit of 50 pages for SF 330 submissions.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
06-01-22
00 01 10-1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
SECTION NO. DIVISION AND SECTION TITLES DATE
DIVISION 00 - SPECIAL SECTIONS
00 01 15 List of Drawing Sheets 05-20 00 11 21 Request for Proposal to Design Build 09-21
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 11-21 01 32 16.01 Architectural and Engineering CPM Schedules 03-20 01 32 16.13 Network Analysis Schedules – Major Construction Project
Design-Bid-Build 05-22
01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 11-21 01 32 16.16 Network Analysis Schedules (Design-Build Only) 05-22 01 32 16.17 Network Analysis Schedules – Major Design/Build
Projects 06-19
01 33 23 Shop Drawings, Product Data, and Samples 06-21 01 35 26 Safety Requirements 11-21 01 42 19 Reference Standards 11-20 01 45 00 Quality Control 02-21 01 45 29 Testing Laboratory Services 11-18 01 45 35 Special Inspections 06-21 01 57 19 Temporary Environmental Controls 01-21 01 58 16 Temporary Interior Signage 07-15 01 74 19 Construction Waste Management 04-22 01 81 13 Sustainable Construction Requirements 10-17 01 81 13.02 Sustainability Certification Requirements – LEED NC V4 01-21 01 81 13.21 Sustainability Certification Requirements – GREEN
GLOBES
01-21
01 91 00 General Commissioning Requirements 04-22 01 91 00.01 DVA/USACE Projects General Commissioning Requirements 08-19
DIVISION 02 – EXISTING CONDITIONS
02 21 13 Site Surveys 01-21 02 41 00 Demolition 08-17 02 65 00 Underground Storage Tank Removal 01-21 02 82 11 Traditional Asbestos Abatement 01-21 02 82 13.13 Glovebag Asbestos Abatement 01-21 02 82 13.19 Asbestos Floor Tile and Mastic Abatement 01-21 02 82 13.21 Asbestos Roofing Abatement 01-21 02 82 13.31 Asbestos Transite Abatement 01-21 02 82 13.41 Asbestos Abatement for Total Demolition Project 01-21 02 83 33.13 Lead-Based Paint Removal and Disposal 01-21
00 01 10-2
SECTION NO. DIVISION AND SECTION TITLES DATE
DIVISION 03 – CONCRETE
03 23 00 Stressing Tendons 01-21 03 30 00 Cast-in-Place Concrete 01-21 03 30 53 (Short-Form) Cast-in-Place Concrete 01-21 03 37 13 Shotcrete 01-21 03 41 13 Precast Concrete Hollow Core Planks 01-21 03 41 33 Precast Structural Pretensioned Concrete 01-21 03 45 00 Precast Architectural Concrete 01-21 03 51 13 Cementitious Wood Fiber Decks 01-21 03 51 16 Gypsum Concrete Roof Decks 01-21 03 52 00 Lightweight Concrete Roof Insulation 01-21 03 55 11 Gypsum Concrete Floor Decks 01-21
DIVISION 04 – MASONRY
04 01 00 Maintenance of Masonry 01-21 04 05 13 Masonry Mortaring 10-17 04 05 16 Masonry Grouting 01-21 04 20 00 Unit Masonry 08-17 04 72 00 Cast Stone Masonry 01-21
DIVISION 05 – METALS
05 12 00 Structural Steel Framing 11-18 05 21 00 Steel Joist Framing 11-18 05 31 00 Steel Decking 01-21 05 36 00 Composite Metal Decking 01-21 05 40 00 Cold-Formed Metal Framing 01-21 05 50 00 Metal Fabrications 08-18 05 51 00 Metal Stairs 01-21
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 10-17 06 16 63 Cementitious Sheathing 01-21 06 20 00 Finish Carpentry 01-21
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 01 50.19 Preparation for Re-Roofing 01-21 07 08 00 Facility Exterior Closure Commissioning 01-21 07 08 00.01 DVA/USACE Projects Facility Exterior Closure
Commissioning 08-19
07 11 13 Bituminous Dampproofing 01-21 07 12 00 Built-Up Bituminous Waterproofing 01-21 07 13 00 Sheet Waterproofing 01-21 07 13 52 Modified Bituminous Sheet Waterproofing 01-21 07 14 21 Latex Mastic Deck Covering 01-21 07 18 13 Pedestrian Traffic Coatings 01-21 07 21 13 Thermal Insulation 01-21
00 01 10-3
SECTION NO. DIVISION AND SECTION TITLES DATE
07 21 23 Loose-Fill Insulation 01-21 07 22 00 Roof and Deck Insulation 01-21 07 24 00 Exterior Insulation and Finish Systems 01-21 07 27 26 Fluid-Applied Membrane Air Barrier, Vapor Permeable 01-21 07 27 27 Fluid-Applied Membrane Air Barrier, Vapor Retarding 01-21 07 31 13 Asphalt Shingles 02-21 07 31 26 Slate Shingles 01-21 07 31 29.13 Wood Shingles 01-21 07 32 13 Clay Roof Tiles 01-21 07 40 00 Roofing and Siding Panels 01-21 07 51 00 Built-Up Bituminous Roofing 12-21 07 51 13.11 Hot-Applied Built-Up Asphalt Roofing 12-21 07 51 13.13 Cold-Applied Built-Up Asphalt Roofing 12-21 07 52 16.11 Cold Adhesive Styrene-Butadiene-Styrene Modified
Bituminous Membrane Roofing 12-21
07 52 16.12 Hot-Mopped Styrene-Butadiene-Styrene Modified Bituminous Membrane Roofing
12-21
07 53 23 Ethylene-Propylene-Diene-Monomer Roofing 01-21 07 54 16 Ethylene Interpolymer (KEE) Roofing 01-21 07 54 19 Polyvinyl-Chloride (PVC) Roofing 12-18 07 54 23 Thermoplastic Polyolefin (TPO) Roofing 01-21 07 56 00 Fluid-Applied Roofing 01-21 07 57 13 Sprayed Polyurethane Foam Roofing 12-21 07 60 00 Flashing and Sheet Metal 01-21 07 61 16 Batten Seam Copper Roofing 01-21 07 71 00 Roof Specialties 01-21 07 72 00 Roof Accessories 01-21 07 81 00 Applied Fireproofing 10-17 07 84 00 Firestopping 01-21 07 92 00 Joint Sealants 04-22 07 95 13 Expansion Joint Cover Assemblies 01-21
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 01-21 08 11 73 Sliding Metal Fire Doors 01-21 08 14 00 Interior Wood Doors 01-21 08 17 10 Integrated Door Assemblies 01-21 08 31 13 Access Doors and Frames 04-22 08 32 13 ICU Sliding Glass Doors 01-21 08 33 00 Coiling Doors and Grilles 01-21 08 33 13 Coiling Counter Doors 01-21 08 34 53 Security Doors and Frames 01-21 08 34 59 Vault Doors and Day Gates 01-21 08 35 13.13 Accordion Folding Doors 01-21 08 36 13 Sectional Doors 01-21 08 38 16 Flexible Traffic Doors 01-21 08 41 13 Aluminum-Framed Entrances and Storefronts 01-21 08 42 33 Revolving Door Entrances 01-21 08 44 13 Glazed Aluminum Curtain Walls 04-20 08 51 13 Aluminum Windows 01-21
00 01 10-4
SECTION NO. DIVISION AND SECTION TITLES DATE
08 51 13.11 Side-Hinged Aluminum Windows 01-21 08 51 23 Steel Windows 01-21 08 51 69.11 Aluminum Storm Windows 01-21 08 56 19 Pass Windows 01-21 08 56 53 Blast Resistant Windows 01-21 08 56 59 Service and Teller Window Units 01-21 08 56 66 Detention Window Screens 01-21 08 63 00 Metal-Framed Skylights 01-21 08 71 00 Door Hardware 05-22 08 71 13 Automatic Door Operators 01-21 08 71 13.11 Low Energy Power Assist Door Operators 01-21 08 80 00 Glazing 01-21 08 90 00 Louvers and Vents 01-21
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 01-21 09 06 00 Schedule for Finishes 01-21 09 22 16 Non-Structural Metal Framing 06-18 09 23 00 Gypsum Plastering 01-21 09 24 00 Portland Cement Plastering 01-21 09 26 00 Veneer Plastering 01-21 09 29 00 Gypsum Board 04-20 09 30 13 Ceramic/Porcelain Tiling 01-21 09 51 00 Acoustical Ceilings 12-18 09 54 23 Linear Metal Ceilings 01-21 09 63 13 Brick Flooring 01-21 09 63 40 Stone Flooring 01-21 09 65 13 Resilient Base and Accessories 01-21 09 65 16 Resilient Sheet Flooring 06-22 09 65 19 Resilient Tile Flooring 05-18 09 66 13 Portland Cement Terrazzo Flooring 01-21 09 66 16 Terrazzo Floor Tile 01-21 09 67 23.20 Resinous Epoxy Base With Vinyl Chip Broadcast (RES 2) 12-21 09 67 23.30 Resinous (Epoxy Resin Composition) Mortar Flooring
(RES-3)
01-21
09.67.23.40 Resinous Poured In Place Resilient Flooring (RES-4) 01-21 09 67 23.50 Resinous Terrazzo Flooring (RES-5) 01-21 09 67 23.60 Resinous Urethane and Epoxy Mortar Flooring (RES-6A and
RES 6B)
01-21
09 68 00 Carpeting 01-21 09 68 21 Athletic Carpeting 01-21 09 69 00 Access Flooring 01-21 09 72 16 Vinyl-Coated Fabric Wall Covering 01-21 09 72 31 Polypropylene Fabric Wall Covering 01-21 09 78 23 Phenolic Interior Wall Paneling 01-21 09 84 33 Sound-Absorbing Wall Units 01-21 09 91 00 Painting 01-21 09 94 19 Multicolor Interior Finishing 01-21 09 96 59 Resinous Specialty Glazed Coating Systems for Walls, Ceilings, Wallboard, and Block CMU (RES-W1, RES-W2) 01-21
00 01 10-5
SECTION NO. DIVISION AND SECTION TITLES DATE
DIVISION 10 – SPECIALTIES
10 11 13 Chalkboards and Markerboards 01-21 10 11 23 Tackboards 01-21 10 11 33 Glassboards (Magnetic & Non-Magnetic) 01-21 10 13 00 Directories 01-21 10 14 00 Signage 01-21 10 21 13 Toilet Compartments 01-21 10 21 16 Shower and Dressing Compartments 01-21 10 21 23 Cubicle Curtain Tracks 01-21 10 22 13 Wire Mesh Partitions 01-21 10 22 19 Demountable Partitions 01-21 10 22 26.13 Accordion Folding Partitions 01-21 10 25 13 Patient Bed Service Walls 01-20 10 26 00 Wall and Door Protection 01-21 10 28 00 Toilet, Bath, and Laundry Accessories 01-21 10 44 13 Fire Extinguisher Cabinets 08-18 10 75 00 Flagpoles 01-21
DIVISION 11 – EQUIPMENT
11 05 12 General Motor Requirements for Equipment 01-21 11 12 00 Parking Control Equipment 01-21 11 17 36 Package Transfer Units 01-21 11 26 00 Unit Kitchens 01-21 11 40 11 Custom Fabricated Food Service Equipment 01-21 11 40 21 Food Service Equipment-Utility Distribution System 01-21 11 41 00 Food Storage Equipment 01-21 11 41 21 Walk-In Coolers and Freezers 01-21 11 44 00 Food Cooking Equipment 01-21 11 48 00 Cleaning and Disposal Equipment 01-21 11 53 13 Laboratory Fume Hoods 01-21 11 53 23 Laboratory Refrigerators 01-21 11 53 53 Biological Safety Cabinets Laminar Airflow Stations 01-21 11 53 61 Custom Fabricated Laboratory Equipment 01-21 11 53 71 Solution Warming Cabinets 01-21 11 71 01 Medical Washing and Sterilizing Equipment 01-21 11 71 02 Laboratory Washing and Sterilizing Equipment 01-21 11 73 00 Ceiling Mounted Patient Lift System 08-20 11 78 00 Mortuary Equipment 01-21 11 78 13 Mortuary Refrigerators 01-21 11 79 13 Hydrotherapy Equipment 01-21 11 82 19 Packaged Incinerators 01-21
DIVISION 12 – FURNISHINGS
12 22 16 Drapery Track and Accessories 01-21 12 24 00 Window Shades 08-17 12 24 21 Lightproof Shades 01-21 12 31 00 Manufactured Metal Casework 01-21
00 01 10-6
SECTION NO. DIVISION AND SECTION TITLES DATE
12 32 00 Manufactured Wood Casework 01-21 12 34 00 Manufactured Plastic Casework 01-21 12 35 70.21 Medication Cabinet 01-21 12 36 00 Countertops 12-18 12 56 70.11 Suspended Table 01-21
DIVISION 13 - SPECIAL CONSTRUCTION
13 05 41 Seismic Restraint Requirements for Non-Structural
Components 01-21
13 17 23 Therapeutic Pools 01-21 13 17 23.11 Therapeutic Pool Accessories 01-21 13 19 13 Kennel Enclosures and Gates 01-21 13 21 29 Constant Temperature Rooms 01-21 13 21 49 Audiology Booth 01-21 13 34 19 Metal Building Systems 01-21 13 49 00 Radiation Protection 01-21
DIVISION 14– CONVEYING EQUIPEMENT
14 12 11 Traction and Winding Drum Dumbwaiter 11-20 14 21 00 New Traction Elevator 08-20 14 21 10 Modernization of Traction Elevator 08-20 14 21 11 Traction Cartlift 03-20 14 24 00 New Hydraulic Elevator 08-20 14 24 10 Modernization of Hydraulic Elevator 08-20 14 24 11 Hydraulic Cartlift 03-20 14 24 24 Renovation Hydraulic Elevator (Custom Written by VACO) 14 26 26 Renovation Traction Elevator (Custom Written by VACO) 14 91 33 Gravity Soiled Linen Chutes 08-20 14 91 82 Gravity Trash Chutes 03-20
DIVISION 21- FIRE SUPPRESSION
21 08 00 Commissioning of Fire Suppression System 11-16 21 08 00.01 DVA/USACE Projects Commissioning of Fire Suppression
Systems 08-19
21 12 00 Manual Dry Standpipe Systems 06-15 21 13 13 Wet-Pipe Sprinkler Systems 06-15 21 13 16 Dry-Pipe Sprinkler Systems 01-15 21-22-00 Clean Agent Fire Suppression Systems 05-15 21-30-13 Electric-Driven, Fire Pumps 05-15 21-30-16 Diesel-Driven, Fire Pumps 05-15
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 09-20 22 05 12 General Motor Requirements for Plumbing Equipment 09-20 22 05 19 Meters and Gages for Plumbing Piping 09-20 22 05 23 General-Duty Valves for Plumbing Piping 09-20 22 05 33 Heat Tracing for Plumbing Piping 09-20
00 01 10-7
SECTION NO. DIVISION AND SECTION TITLES DATE
22 07 11 Plumbing Insulation 09-19 22 08 00 Commissioning of Plumbing Systems 11-16 22 08 00.01 DVA/USACE Projects Commissioning of Plumbing Systems 08-19 22 11 00 Facility Water Distribution 05-21 22 11 23 Domestic Water Pumps 09-15 22 12 16 Facility Elevated, Potable-Water Storage Tanks 09-15 22 13 00 Facility Sanitary and Vent Piping 09-20 22 13 23 Sanitary Waste Interceptors 09-20 22 13 29 Sanitary Sewerage Pumps 09-20 22 13 29.13 Wet-Pit Mounted, Vertical Sewerage Pumps 09-20 22 13 33 Packaged, Submersible Sewerage Pump Units 09-20 22 14 00 Facility Storm Drainage 09-15 22 14 29 Sump Pumps 09-15 22 14 33 Packaged, Pedestal Drainage Pump Units 09-15 22 14 36 Packaged, Submersible, Drainage Pump Units 09-15 22 15 00 General Service Compressed-Air Systems 09-20 22 31 11 Water Softeners 09-15 22 33 00 Electric Domestic Water Heaters 09-20 22 34 00 Fuel-Fired Domestic Water Heaters 09-20 22 35 00 Domestic Water Heat Exchangers 09-20 22 40 00 Plumbing Fixtures 09-15 22 42 26 Commercial Disposers 09-15 22 61 13.74 Dental Compressed-Air Piping 09-20 22 61 19.74 Dental Compressed-Air Equipment 09-20 22 62 00 Vacuum Systems for Laboratory and Healthcare Facilities 09-15 22 62 19.74 Dental Vacuum and Evacuation Equipment 09-15 22 63 00 Gas Systems for Laboratory and Healthcare Facilities 09-15 22 66 00 Chemical-Waste Systems for Laboratory and Healthcare
Facilities 09-20
22 67 19.16 Reverse-Osmosis Water Equipment 09-15 22 67 21 Water Dealkalizing System 09-15
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 10 Common Work Results for Boiler Plant and Steam
Generation 04-20
23 05 11 Common Work Results for HVAC 04-22 23 05 12 General Motor Requirements for HVAC and Steam
Generation Equipment 02-20
23 05 41 Noise and Vibration Control for HVAC Piping and Equipment
02-20
23 05 51 Noise and Vibration Control for Boiler Plant 03-22 23 05 93 Testing, Adjusting, and Balancing for HVAC 02-20 23 05 93.01 DVA/USACE Projects Testing, Adjusting, and Balancing for HVAC 11-21
23 07 11 HVAC and Boiler Plant Insulation 02-20 23 08 00 Commissioning of HVAC Systems 04-22 23 08 00.01 DVA/USACE Projects Commissioning of HVAC Systems 08-19 23 08 11 Demonstrations and Tests for Boiler Plant 04-20 23 09 11 Instrumentation and Control for Boiler Plant 03-22
00 01 10-8
SECTION NO. DIVISION AND SECTION TITLES DATE
23 09 23 Direct-Digital Control System for HVAC 09-11 23 10 00 Facility Fuel Systems 04-20 23 11 23 Facility Natural-Gas Piping 04-20 23 21 11 Boiler Plant Piping Systems 09-21 23 21 13 Hydronic Piping 02-20 23 21 23 Hydronic Pumps 02-20 23 22 13 Steam and Condensate Heating Piping 02-20 23 22 23 Steam Condensate Pumps 04-20 23 23 00 Refrigerant Piping 02-20 23 25 00 HVAC Water Treatment 02-20 23 31 00 HVAC Ducts and Casings 02-20 23 34 00 HVAC Fans 02-20 23 36 00 Air Terminal Units 02-20 23 37 00 Air Outlets and Inlets 02-20 23 38 13 Commercial-Kitchen Hoods 02-20 23 40 00 HVAC Air Cleaning Devices 03-20 23 50 11 Boiler Plant Mechanical Equipment 03-22 23 51 00 Breechings, Chimneys, and Stacks 04-20 23 52 25 Low-Pressure Water Heating Boilers 11-21 23 52 28 Low-Pressure Steam Boilers 11-21 23 52 33 Water Tube Boilers 03-22 23 52 39 Fire Tube Boilers 03-22 23 56 00 Solar Energy Heating System 03-20 23 57 33 Geothermal Energy – Direct Use (Heating Applications) 03-20 23 64 00 Packaged Water Chillers 03-20 23 65 00 Cooling Towers 03-20 23 72 00 Air-to-Air Energy Recovery Equipment 03-20 23 73 00 Indoor Central-Station Air-Handling Units 03-20 23 74 13 Packaged, Outdoor, Central-Station Air-Handling Units 03-20 23 81 00 Decentralized Unitary HVAC Equipment 03-20 23 81 23 Computer-Room Air-Conditioners 03-20 23 81 43 Air-Source Unitary Heat Pumps 03-20 23 81 46 Water-Source Unitary Heat Pumps 03-20 23 81 49 Ground-Source Heat Pump 03-20 23 82 00 Convection Heating and Cooling Units 03-20 23 82 16 Air Coils 03-20 23 84 00 Humidity Control Equipment 03-20
DIVISION 25 – INTEGRATED AUTOMATION
25 10 10 Advanced Utility Metering System 02-10
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 01-16 26 05 13 Medium-Voltage Cables 01-17 26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17 26 05 26 Grounding and Bonding for Electrical Systems 01-17 26 05 33 Raceway and Boxes for Electrical Systems 01-18 26 05 36 Wireways for Radiology Equipment 01-18 26 05 39 Underfloor Raceways for Electrical Systems 01-18
00 01 10-9
SECTION NO. DIVISION AND SECTION TITLES DATE
26 05 41 Underground Electrical Construction 01-17 26 05 73 Overcurrent Protective Device Coordination Study 01-18 26 08 00 Commissioning of Electrical Systems 11-16 26 08 00.01 DVA/USACE Projects Commissioning of Electrical Systems 08-19 26 09 23 Lighting Controls 01-18 26 11 16 Secondary Unit Substations 01-18 26 12 19 Pad-Mounted, Liquid-Filled, Medium-Voltage Transformers 01-18 26 13 13 Medium-Voltage Circuit Breaker Switchgear 01-17 26 13 16 Medium-Voltage Fusible Interrupter Switches 01-17 26 20 11 Isolated Power Systems 01-18 26 22 00 Low-Voltage Transformers 01-18 26 23 00 Low-Voltage Switchgear 01-17 26 23 13 Generator Paralleling Controls 01-17 26 24 13 Distribution Switchboards 01-18 26 24 16 Panelboards 01-18 26 24 19 Motor Control Centers 01-18 26 25 11 Busways 01-17 26 26 00 Power Distribution Units for Static Uninterruptible
Power Systems 01-18
26 27 26 Wiring Devices 01-18 26 29 11 Motor Controllers 01-18 26 29 21 Enclosed Switches and Circuit Breakers 01-17 26 32 13 Engine Generators 01-18 26 33 53 Static Uninterruptible Power Supply 01-17 26 35 26 Harmonic Filters 01-18 26 36 23 Automatic Transfer Switches 01-17 26 41 00 Facility Lightning Protection 01-17 26 42 00 Cathodic Protection 01-17 26 43 13 Surge Protective Devices 01-17 26 51 00 Interior Lighting 01-18 26 55 71 Medical and Surgical Lighting Fixtures 01-18 26 56 00 Exterior Lighting 01-18
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 09-19 27 05 26 Grounding and Bonding for Communications Systems 06-15 27 05 33 Raceways and Boxes for Communications Systems 10-18 27 05 61 Leased Space, Communication Equipment and Systems 06-15 27 08 00 Commissioning of Communications Systems 11-16 27 08 00.01 DVA/USACE Projects Commissioning of Communications
Systems 08-19
27 10 00 Control, Communication and Signal Wiring 06-15 27 11 00 Communications Equipment Room Fittings 06-15 27 15 00 Communications Structured Cabling 01-16 27 31 00 Voice Communications Switching and Routing Equipment 06-15 27 31 31 Voice Communications Switching and Routing Equipment -
Extension 06-15
27 32 41 Two-Way Radio Equipment and Systems 10-18 27 41 31 Master Antenna Television Equipment and Systems 06-15 27 51 16 Public Address and Mass Notification Systems 10-18
00 01 10-10
SECTION NO. DIVISION AND SECTION TITLES DATE
27 51 23 Intercommunications and Program Systems 06-15 27 52 23 Nurse Call and Code Blue Systems 10-18 27 52 41 Miscellaneous Medical Systems 06-15 27 53 19 Distributed Radio Antenna (Within Building) Equipment and System 10-18
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security 04-18 28 05 13 Conductors and Cables for Electronic Safety and
Security 10-18
28 05 26 Grounding and Bonding for Electronic Safety and Security
09-11
28 05 28.33 Conduits and Backboxes for Electronic Safety and Security
09-11
28 08 00 Commissioning of Electronic Safety and Security Systems 11-16 28 08 00.01 DVA/USACE Projects Commissioning of Electronic Safety and Security Systems 08-19
28 13 00 Physical Access Control System 10-11 28 13 16 Physical Access Control System and Database Management 09-11 28 13 53 Security Access Detection 09-11 28 16 00 Intrusion Detection System 10-11 28 23 00 Video Surveillance 09-11 28 26 00 Electronic Personal Protection System 09-11 28 31 00 Fire Detection and Alarm 10-11 28 52 31 Emergency Call System 06-15
DIVISION 31 – EARTHWORK
31 20 00 Earthwork 07-16 31 20 11 Earthwork (Short Form) 10-12 31 23 19 Dewatering 10-12 31 23 23.33 Flowable Fill 10-12 31 32 23 Pressure Grouting Soil Stabilization 10-12 31 62 00 Driven Piles 10-12 31 63 16 Auger Cast Grout Piles 10-12 31 63 26 Drilled Caissons 10-12
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 23 Cement and Concrete for Exterior Improvements 08-16 32 12 16 Asphalt Paving 09-15 32 14 16 Brick Unit Paving 08-16 32 17 23 Pavement Markings 08-16 32 31 13 Chain Link Fences and Gates 06-18 32 31 40 High Security Fences and Gates 08-16 32 84 00 Planting Irrigation 08-16 32 90 00 Planting 08-16
00 01 10-11
SECTION NO. DIVISION AND SECTION TITLES DATE
DIVISION 33 – UTILITIES
33 08 00 Commissioning of Site Utility Systems 11-16 33 08 00.01 DVA/USACE Projects Commissioning of Site Utility
Systems 08-19
33 10 00 Water Utilities 03-17 33 30 00 Sanitary Sewer Utilities 06-13 33 40 00 Storm Sewer Utilities 12-17 33 46 13 Foundation Drainage 10-11 33 51 00 Natural-Gas Distribution 10-11 33 63 00 Steam Energy Distribution 09-17
DIVISION 34 – TRANSPORTATION
34 71 13 Passive Vehicle Barriers 04-18 34 75 13.13 Active Vehicle Barriers 08-16
DIVISION 48 – Electrical Power Generation
48 14 00 Solar Energy Electrical Power Generation System 10-17 48 15 00 Wind Energy Electrical Power Generation System 10-17 48 16 23 Geothermal Energy Electrical Power Generation System 10-17