This document includes a statement of work and related federal contract opportunity solicitation. The statement of work outlines requirements for cleaning and inspecting ventilation systems onboard a Coast Guard cutter near San Francisco. Services required include cleaning specified galley and pantry room ventilation ducts and systems in accordance with standard specifications. The contractor must provide protective coverings, additional protective covering for food areas, and schedule work between 7pm-5:30am to avoid interfering with meal preparation. The solicitation is a combined synopsis and solicitation issued as a request for quotations with a firm fixed price contract awarded using simplified acquisition procedures. Quotes are due by July 24, 2020 with an anticipated award by the same date. The solicitation is set aside for small businesses with a NAICS code of 336611 and size standard of 1250 employees. Past performance is more important than price in the evaluation. Interested vendors must register in SAM.gov and email quotes and required documents to the point of contact provided.
View the file
Who attaches DI-SCREP-20017
| Agency | Files |
|---|---|
| Department of Homeland Security US Coast Guard | 1 |
Other files
| File | Type | Posted |
|---|---|---|
| Coast Guard Drawing 225B WLB 512-001.pdf | ||
| Coast Guard Drawing 225B WLB 512-009.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
51201_0617_FLT
REC_51200_FLT_225’ WLB ‘B’ Class (ALL) WORK ITEM 1: Vent Ducts (Galley and Pantry Room All), Commercial Cleaning
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect the designated shipboard ventilation systems.
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings
Coast Guard Drawing 225B WLB 512-001, Rev K, HVAC Diagram Coast Guard Drawing 225B WLB 512-007, Rev B, HVAC A&D, Fr 66-92, Innerbttm & 1st Platform Coast Guard Drawing 225 WLB 259-005, Rev C, Combustion Intake & Exhaust A&D Hull Block 940
Coast Guard Publications
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 5100 (SFLC Std Spec 5100), 2014, Clean Shipboard Ventilation Systems
Coast Guard Technical Publication (TP) 3796, Section A, Aug 2006, Galley Hood – Model NBDL-60 (13’-4”) Other References
None
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:
· Ducting Screens
· Electric pre-heaters
· Overhead sheating/panels
· Ventilation Covers note
Coast Guard personnel will operate all shipboard machinery and equipment.
3.2 Operational test, initial. Prior to commencement of work, the Contractor shall witness Coast Guard Personnel perform an initial operational test of the ventilation systems included in this work item, to demonstrate existing operational condition. Submit a CFR.
NOTE
It is recommended that the Contractor conduct a ship check to verify dimensions in the table below.
3.3 Cleaning requirements. The Contractor shall clean and inspect the following ventilation systems, shown on 225B WLB 512-001, 225B WLB 512-007, and 225 WLB 259-005, in accordance with SFLC Std Spec 5100. Submit a CFR.
table – 1 system location
| SYSTEM LOCATION |
| TYPE |
| Gaylord Hood |
| Exhaust |
| Galley |
| Supply |
| 1-57-1-Q (Galley) |
| Exhaust |
3.4 Additional requirements. In addition to the above, the Contractor shall accomplish the following:
3.4.1 Notification. Give written notification to the COR, 48 hours before starting ventilation cleaning work.
3.4.2 Additional protective covering. In addition to providing protective covering as specified in SFLC Std Spec 5100, subsection 3.1.3 (Protective measures), provide additional protective covering for all food preparation and serving surfaces in the immediate work area, as applicable, to prevent contamination.
3.4.3 Avoidance of meal preparation and service. Ensure that cleaning of galley ventilation systems is scheduled between 1900 and 0530 so that it WILL NOT interfere with meal preparation and service.
note
Coast Guard personnel will operate all shipboard machinery and equipment.
3.5 Operational test, post repairs. After completion of work, the Contractor shall thoroughly test, in the presence of the Coast Guard Inspector and demonstrate the ventilation systems included in this work item to be in satisfactory operating condition. Submit a CFR.
4. NOTES
This section is not applicable to this work item.