SOW_AMO Ramp repaving.pdf
PDF 2 MB Posted
- Solicitation number
- 20180PR250000052
About this file
This Statement of Work (SOW) details a ramp repaving project for the United States Coast Guard Air Station in San Francisco. The project requires completely demolishing and removing the existing ramp attached to the supply warehouse hangar building and constructing a new ramp, with the work area approximately 38'x27'.
The contracted company must perform specific tasks including demolishing and disposing of existing pavement, preparing the subbase, installing rebar, forming and pouring concrete, ensuring a flat surface, and creating smooth transitions between the driveway and ramp. The work must be completed within 60 days after contract award, with the contractor required to provide a key personnel list to the Contracting Officer and obtain prior approval before entering the facility. The Coast Guard will conduct periodic inspections using a 100% quality assurance surveillance method, with the contractor responsible for re-performing any unsatisfactory work at their own expense.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMO ramp 1.jpg | JPG image | |
| AMO ramp 2.jpg | JPG image | |
| AMO ramp 3.jpg | JPG image |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Introduc�on
2. Loca�on of Work
3. Delivery Schedule
4. Period of Performance
Department of Homeland Security
United States Coast Guard
Air Sta�on San Francisco/Point Mugu
Statement of Work (SOW) or N/A- 1 2 3 4Option Years
Statement of Work – Coast Guard Air Station San Francisco/Point Mugu
5. Scope of Work
6. Specifica�ons/Requirements
7. Security Informa�on
Statement of Work – Coast Guard Air Station San Francisco/Point Mugu
9. Quality of Work
10. Points of Contact
8. Site Visit
11. Reference Pictures
| Project Title: AMO Ramp Repaving |
| Location: USCG Air Station San Francisco |
1020 North Access Road San Francisco, CA 94128
| Delivery Schedule: Delivery required within 60 days after award. |
| Specifications: The contracted company shall at a minimum: |
-Demo and dispose existing pavement (approx. 38'x27' area) -Prep subbase -Install rebar -Form and pour concrete -All required finishing to ensure a flat surface -Patching as required to ensure a smooth transition from the driveway to the ramp
| Security Information: Contractor will provide the Contracting Officer with a key personnel list to keep on record. These members will need prior approval before entering the facility. |
| Site Visit: A site visit is acceptable at no cost to the buyer. Contact the Contracting Officer for scheduling. |
| Introduction: Repaving required for graded ramp outside of Air Station San Francisco's supply warehouse |
| QOW: All services rendered will be subject to Government inspection. The Contractor shall perform or re-perform work which was not performed in a satisfactory manner, as determined by the KO, at the Contractor’s expense. The Coast Guard will use a 100% quality assurance surveillance method. Inspection of work shall be performed periodically while work is being performed and prior to contractor leaving the site. |
| POCs: Contact Contracting Officer for all questions |
| Pictures: enclosures 1-3: photos of the existing ramp and warehouse |
| Date to: |
| SOW: Air Station San Francisco requires repaving of ramp leading into the supply warehouse, attached to the hangar building. The company shall completely demo and remove the old ramp, and execute all required safety and construciton steps required to repave and grade a new ramp. The ramp area is approximately 38'x27', but the company shall demo and repave as much as is required to completely reinstall a safe graded ramp from the driving area up to the warehouse door. |