This document is a Statement of Work (SOW) for an AFIT Mobile Remote Sensing Laboratory Trailer required by the Air Force Institute of Technology (AFIT)/Center for Technical Intelligence Studies & Research (CTISR) at Wright-Patterson Air Force Base, Ohio.

The SOW outlines detailed technical specifications for a 21,000 lb. mobile trailer with climate control, power generation, and other features to support AFIT's remote sensing research activities. The trailer must be delivered within 90 days of contract award to the AFIT/EN facility. The government is conducting market research to identify potential sources, including small businesses, to fulfill this requirement. Responses to the sources sought notice are due by November 11, 2024. The North American Industry Classification System (NAICS) code is 336212 - Truck Trailer Manufacturing. The government reserves the right to set this procurement aside for small businesses based on the responses received.

View the file

Other files

File Type Posted
SS_Instructions.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

AFIT Mobile Remote Sensing Laboratory Trailer

Rev 05 November 2024

Air Force Institute of Technology of the United States Air Force, Wright-Patterson Air Force Base, Ohio

I. BACKGROUND:

Air Force Institute of Technology/ Center for Technical Intelligence Studies & Research (AFIT/CTISR) owns over $6M in exquisite remote sensing equipment that is periodically deployed to remote locations (3-6x/yr.) in austere (harsh) environments. To support these tests, a climate controlled mobile facility with self-contained electricity production is required. The instruments used in these tests are very sensitive to temperature and humidity changes and require at a minimum of 10 kW of electrical power. To date, these tests have been accomplished with an existing trailer which is not climate controlled using external generators. This capability has proven to be intractable (not easily manageable) in many of the environments we required to execute testing in.

II. SCOPE:

AFIT/CTISR has a requirement for a remote sensing field laboratory. The research center conducts significant DoD relevant research activities in remote locations. These activities require the deployment of exquisite remote sensing instruments against a variety of targets. These locations are often austere with little support infrastructure. This laboratory is necessary to protect both the instruments and operators from the environment during these excursions. In order to support this requirement, the Center requires a trailer of sufficient size, with an appropriate load capacity, the appropriate configuration, as well as the necessary power, and climate controls to support a broad variety of data collection efforts.

III. REQUIREMENTS:

The vendor shall provide the following specs for the trailer.

3.1. Trailer Specs:

3.1.1 21,000 pound load rating minimum

3.1.2 456 inch trailer length

3.1.3 >102 inch body width

3.1.4 >8 foot interior height

3.1.5 >96 inch interior width wall to wall

3.1.6 Bull nose front compatible to be towed with a standard 72 inch bed truck.

3.1.7 Aluminum roof, single piece

3.1.8 A.T.P. Front stoneguard 24 inch tall

3.1.9 >= 0.03 inch exterior painted aluminum wall covering

3.1.10 2 x 8 inch steel tube frame

3.1.11 Undercoat corrosion protective paint

3.1.12 1 x 1.5 inch steel tube walls

3.1.13 White vinyl interior ceilings and walls

3.1.14 >=3/4 inch plywood floor with moisture barrier

3.1.15 All wheel electric brakes

3.1.16 Breakaway kit

3.1.17 48 inch triple tube tongue

3.1.18 Radial tires on steel wheels

3.1.19 Dexter E-Z lube Torsion axels

3.1.20 Two 48 x 72 inch vendor doors on left side facing front with deadbolts and piano hinge

3.1.21 One 48 x 72 inch vendor doors on right side facing front with deadbolt and piano hinge.

3.1.22 One 48 inch side door on right side of trailer facing front with deadbolt and piano hinge with aluminum pull out step.

3.2.23 Spring assisted full height rear ramp door with 16 inch aluminum flap with cambers. Must include a transition plate between ramp and trailer crossing over the hinge.

3.1.24 Full light package to include panel lights, loading lights, backing lights, scene work lights, and switches

3.1.25 8-foot roof platform with 42 inch rails with front ladder minimum

3.1.26 Generator enclosure

3.1.27 Integrated generator with no less than 20 gallons integrated diesel tank.= 10 kW, including electrical and safety equipment.

3.1.28 No less than 10 120V outlets split between two 50 Amp electrical panels with external shore power plugs Nema SS2-50P for each panel.

3.1.29 Underslung (under trailer mounted) spare tire mount

3.1.30 Insulated walls and roof

3.1.31 Etrack system on floor and walls. 3 floor tracks and 3 wall tracks evenly distributed the length of the trailer

3.1.32 Coin flooring or equivalent (must be durable and provide traction)

3.1.33 Tool cabinets and work benches installed in control room and on right side of

Trailer

3.1.34 Electric tongue jack

3.1.35 >=15000 BTU integrated heater/ac with 12 vdc battery for operation

3.1.36 Partition wall with door, 8 feet from front of trailer. AC/heat will be integrated in the partition.

3.1.37 Fold up work benches in partitioned space.

3.1.38 Windows in partitioned space to see out left and right side of trailer

3.1.39 two 5000 watt battery generators bonded together to produce 240 vac and 120 vac with two additional 2700 Wh or greater batteries to expand the amount of available power.

IV. DELIVERY:

4.1 Contractor shall deliver the Mobile Remote Sensing Laboratory Trailer with all accessories to the Air Force Institute of Technology (AFIT/EN) within 90 days of contract award.

4.2 Place of performance:

Air Force Institute of Technology (AFIT/EN) Area B 2950 Hobson Way, Building, #640 Room #264 Wright-Patterson AFB, OH 45433-7765

V. INVOICE AND PAYMENT:

The contractor shall be paid upon submission of a properly prepared invoice and after final inspection and acceptance has been made. A proper invoice shall cite the contractor’s name and address, invoice number, invoice date, order number, contract line-item number (CLIN), description of the supplies or service, unit of issue, unit price and extended price, terms of any prompt payment discount offered, and who to notify in the event that the invoice is defective.

5.1 The invoice shall be submitted to the Wide Area Workflow (WAWF https://wawf.eb.mil/) in accordance with the terms of the final contract award 100% payment upon completion of all requirements specified in this Statement of Work.

VI. WARRANTY:

Contractor shall provide manufacturing warranty coverage on any defective components and shall replace any broken or defective items within 30 days of notification.

VII. DELIVERY PROCEDURES COMMERCIAL VEHICLES:

7.1 All vehicles larger than a large pick-up truck are required to be inspected by the Wright- Patterson Air Force Base Commercial Vehicle Delivery Gate (CVDG) prior to entering the installation. Vehicles to be inspected include, but are not limited to, the following:

7.1.1. Step van/panel truck

7.1.2. Tractor/trailer, box and flatbed containing cargo

7.1.3. Tanker trucks

7.1.4. Box truck

7.1.5. Tour buses

7.1.6. Garbage/recycled waste trucks

7.1.7. Concrete trucks/mixers, dump trucks

7.1.8. Cranes, recreational vehicles, petroleum tanker

8.2. The following are exemptions to vehicles utilizing the CVDG:

8.2.1. If the vehicle has the product inside (concrete and asphalt trucks) and timely delivery is necessary due to product deterioration it does not need to enter the CVDG. To bypass the CVDG, the contractor shall submit a list containing drivers’ names, social security numbers and the state in which the driver's license is held for those drivers who will be entering the base. This shall be accomplished 24 hours prior to requested entry time. If entry is requested on Monday, this list shall be submitted by Friday at 1630 hours. All lists shall be submitted to the 88th ABW/CE Directorate contract inspector. The only gates that may be used under this exemption shall be 15A, 26A, 38A, and gate 1B. If the driver's name is not on the list, he/she will not be allowed access to the installation through these gates and the base will not assume liability for denied access.

8.2.2. If a delivery vehicle must exit, and then re-enter the base to complete its route, the vehicle shall be resealed upon exiting the base. After initially passing through the commercial vehicle delivery gate, trucks shall be resealed at Gates 15A, 38A and 22B. The resealing of the trucks will allow them to continue to any other area of the installation (Areas A, B, or Kittyhawk) without reprocessing through the CVDG. To receive resealing assistance, the drivers shall physically stop at one of the three authorized gates and request the installation entry controller to reseal their truck and provide the next location of their delivery. The controller will reseal the truck and give the delivery driver a pre-clearance form. The driver shall present the pre-clearance form to the entry controller at the next point of installation entry. This reentry can be through any base gate.

8.3. Vehicles may be subject to an inspection at any of installation entry control points during a directed random antiterrorism measure (RAM). Any commercial vehicle, regardless of size, can be directed to the CVDG at the discretion of the installation entry controller.