This is a Statement of Work (SOW) for mold remediation services at Building 91259 Auditorium, located at Hurlburt Field, Florida. The contractor shall provide all management, tools, supplies, equipment, labor, and transportation necessary to perform the mold remediation in accordance with OSHA, EPA, FDEP, and local regulations. The contractor is responsible for all required site measurements, and drawings will be provided if necessary.
The specific tasks and deliverables include: removal and disposal of affected ceiling tiles and drywall (Category 3); replacement of ceiling with same or like style and reinstallation of fixtures; cleaning of vents and fixtures; HEPA vacuuming of area walls, walls, and floors with deodorization; application of plant-based antimicrobial agents to walls and floors; cleaning and disinfection of tables, equipment, and chairs; fogging and spray disinfection; operation of negative air fans and air scrubbers for a 24-hour period with HEPA filter installation; disposal of all unusable material; and a final inspection with government personnel to ensure mold mitigation is complete. Work shall be performed Monday through Friday (excluding US Federal Holidays) during core hours of 0700 to 1500 daily, though Alternate Work Schedules may be available if approved by the Contracting Officer with no additional cost to the Government. The contractor must establish proper contract administration processes, maintain a single point of contact with the Government, keep accurate time keeping records, establish clear organizational authority, and manage any subcontractors responsible for integrated work performance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA441726Q0194-Questions and Answers.pdf | ||
| Wage Determination Rev 33.pdf | ||
| Solicitation - FA441726Q0194.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW) For
Building 91259 Auditorium Mold Remediation
1. Scope. The contractor shall provide all management, tools, supplies, equipment, labor, and transportation necessary to perform Mold Remediation Services at Bldg. 91259 Auditorium Hurlburt Field, Florida in a manner that will maintain a safe environment for all personnel and in accordance with all applicable laws, rules, regulations, standards, codes and permits.
The Contractor is responsible for all required measurements during site visit, and those measurements will be used. Drawings will be provided if necessary.
2. Tasks:
PPE
Labor Materials & Supplies Debris Disposal General Clean Up HEPA Filtered Air Scrubbers during Duration of Cleaning Remove and Dispose of Affected Ceiling Tiles Spray, Wipe and Clean all Horizontal and Vertical Surfaces with an Antimicrobial HEPA Vacuum Partition Walls in Affected Area ULV Fogging of Affected Area with an Antimicrobial Professional Carpet Cleaning - Includes Sanitizing of Carpets Work to be completed in accordance with OSHA, EPA, FDEP, and local regulations and requirements.
3. Deliverables
TASKS FOR EACH DELIVERABLE
The contractor shall perform the following:
4. Government Furnished Property/Base Support. The Government will provide access to the facility for installation and maintenance efforts.
5. Location and Hours of Work. Accomplishment of tasks required by this PWS requires work at
Hurlburt Field, Florida. Normal workdays are Monday through Friday except US Federal Holidays. Core hours of work are from 0700 to 1500 daily. Contractor employees are expected to be available during core hours. Alternate Work Schedule (AWS) may also be available, approved by the Contracting Officer provided there is no additional cost to the Government.
6. Business Relations. The Contractor shall successfully integrate and coordinate all activity needed to execute the requirement: the timeliness, completeness and quality of problem identification, corrective action plans, proposal submittals, timely identification of issues, effective/responsive management of subcontractors, customer satisfaction, and professional and ethical behavior of Contractor personnel.
7. Contract Administration. The Contractor shall establish processes and assign appropriate resources to effectively administer the requirement. Duties include but are not limited to:
responding to Government requests for contractual actions in a timely fashion; having a single point of contact between the Government and Contractor personnel assigned to support task orders; and assigning work effort and maintaining proper/accurate time keeping records of personnel assigned to work on the requirement.
8. Contract Management. The Contractor shall establish clear organizational lines of authority and responsibility to ensure effective management and control of the resources assigned to the requirement. The Contractor must maintain continuity between the support operations at customer locations and the Contractor’s business offices.
9. Subcontract Management. The Contractor shall be responsible for any subcontract management necessary to integrate work performed on this requirement and shall be responsible and accountable for subcontractor performance on this requirement.
10. Bldg. 91259 Auditorium requires the following cleaning/actions:
10.1 Remove affected ceiling tile & drywall and bag - Cat 3
10.2 Replace ceiling with same or like style. Re-Install fixtures to tiles
10.3 Clean vents/fixtures
10.4 HEPA vacuum area walls and clean all walls ensuring mold is gone
10.5 HEPA vacuum area floors/Clean and deodorize
10.6 Apply plant-based anti-microbial agent to the walls
10.7 Apply plant-based anti-microbial agent to the floor
10.8 Apply antimicrobial and wipe clean surfaces of tables and other equipment in the area
10.9 Clean/Disinfect all chairs
10.10 Disinfect with fog / spray
10.11 Negative air fan/Air scrubber (24 hr period)
10.12 Add for HEPA filter (for negative air exhaust fan)
10.13 Dispose of all unusable material
10.14 Conduct a final inspection with government ensuring mold mitigation