This is a Statement of Work (SOW) for Radio Frequency (RF) Emissions Testing Services issued by Puget Sound Naval Shipyard in Bremerton, Washington. Element Materials Technology is the contractor responsible for performing RF emissions testing on the client's Unit Under Test (UUT), which consists of a Tablet (SN 7M8KLZ3) and a wireless access point (SN FJC28151MMV). The testing encompasses two items: emissions measurement at a directional antenna and emissions measurement at a radio antenna, both measuring maximum RF output in dBm at their respective connection points.
The performance period runs from September 14, 2026, through November 30, 2026. The total firm-fixed cost is redacted in the document, with additional testing time beyond the included 12 hours billed at a redacted hourly rate. Payment terms are Net 30. Deliverables consist of a comprehensive test report in PDF format detailing procedures and results. Client responsibilities include providing a Purchase Order referencing Quotation Number 67552Rev1, ensuring the UUT is fully operational, providing special test fixtures or support equipment, managing UUT setup and operation with clear written instructions, providing a shipping address and FedEx/UPS account number for return of the UUT, and completing a Trade Compliance Questionnaire before project commencement. The scope assumes setup and teardown will not exceed two hours, the UUT will pass all tests on the first attempt with no troubleshooting required, and testing will not exceed 12 hours. A cancellation fee may apply if the Client cancels, postpones, or delays with less than ten business days' notice, ranging from one week of EMI Lab time to the full quoted cost.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sole Source Determination_Elements_Redacted.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
08MAY2026 Quote: 67552Rev1
Statement of Work (SOW)
Project Title: Radio Frequency (RF) Emissions Testing Services
Request for Proposal (RFP)
Puget Sound Naval Shipyard
Bremerton, Washington
This proposal or quotation includes data that shall not be disclosed outside the government and shall not be duplicated, used, or disclosed—in whole or in part—for any purpose other than to evaluate this proposal or quotation. If, however, a contract is awarded to this offeror or quoter as a result of or in connection with the submission of this data, the government shall have the right to duplicate, use, or disclose the data to the extent provided in the resulting contract. This restriction does not limit the government’s right to use information contained in this proposal if it is obtainable from another source
Table of Contents
1.0 Background and Objective
2.0 Scope of Work
3.0 Deliverables
4.0 Period of Performance
5.0 Client Responsibilities
6.0 Assumptions
7.0 Pricing and Payment Terms
8.0 Cancellation Policy
1.0 Background and Objective
This Statement of Work outlines the agreement between Puget Sound Naval Yard (hereinafter "Client") and Element Materials Technology (hereinafter "Contractor") for the performance of RF emissions testing on the Client's Unit Under Test (UUT). The objective is to measure the maximum RF output as specified in the scope of work below. The test is proprietary and was developed to meet PSNS requirements.
2.0 Scope of Work
The Contractor shall provide all necessary personnel, equipment, and facilities to perform the following tests on the Client's UUT The Contractor shall provide all necessary personnel, equipment, and facilities to perform the following tests on the Client’s UUT. The equipment being used is Government furnished property and will follow governing requirements accordingly. The UUT consists of a Tablet (SN
7M8KLZ3) and a wireless access point (SN FJC28151MMV).
• Item 1: Emissions Measurement at Directional Antenna
• Specification: Measuring the maximum RF output in dBm at the connection of the directional antenna.
• Item 2: Emissions Measurement at Radio Antenna
• Specification: Measuring the maximum RF output in dBm at the connection of the radio antenna.
3.0 Deliverables
Upon completion of the testing, the Contractor shall provide the following:
• A comprehensive Test Report detailing the procedures followed and the results of the tests for each item listed in the Scope of Work. The report will be delivered as a secure Adobe Acrobat (.pdf) file via email.
4.0 Period of Performance
• Performance start date: 14 Sept 2026
• Performance end date: 30 Nov 2026
5.0 Client Responsibilities
• Provide a Purchase Order that references Quotation Number 67552Rev1.
• Ensure the UUT and its components are fully operational for the test setup.
• Provide any and all special test fixtures or support equipment required for testing.
• Client personnel will be responsible for the setup, monitoring, and operation of the UUT and support equipment, OR provide clear, written instructions for its operation and a point of contact for support.
• Complete and return the Contractor's Trade Compliance Questionnaire before the project commences.
• Provide a shipping address and a FedEx/UPS account number for the return of the UUT.
6.0 Assumptions
The pricing and scope are based on the following assumptions:
• Setup and teardown, including associated support equipment, will not exceed two (2) hours in total.
• The UUT will pass each test on the first attempt. The quoted cost does not include time for troubleshooting, re-testing, or delays.
• The initial quote covers up to 12 hours of testing.
7.0 Pricing and Payment Terms
Item 1 (Directional Antenna Test):
Item 2 (Radio Antenna Test):
Total Firm-Fixed Cost:
• Additional Hours: Any testing time required beyond the included 12 hours will be invoiced at a rate of per hour.
• Payment Terms: Net 30.
8.0 Cancellation Policy
If the scheduled test program is cancelled, postponed, or delayed by the Client with less than ten (10) business days’ notice, a cancellation fee may be applied at the Contractor's discretion, equivalent to at least one week of EMI Lab time and up to the full quoted cost.