SOW 673 905 Tampa Morgue Final - 8-12-23.pdf
PDF 1006 KB Posted
- Solicitation number
- 36C77623R0167
About this file
This is a scope of work document for a project to construct a new morgue at the James A. Haley Veterans' Hospital in Tampa, Florida. The Department of Veterans Affairs is seeking an architectural and engineering firm to design the new morgue facility, which will cover an area of 1,296 square feet, as well as renovate an existing morgue covering 1,493 square feet. Key requirements for the project include designing the morgue to meet pandemic functionality standards, incorporating contemporary features such as hazardous liquid waste disposal and isolated autopsy facilities, and including a standalone and redundant HVAC system. The selected A/E firm will provide design development, construction documentation, bidding support, and construction period services. Submissions are required at schematic, design development, and construction document phases. The design must meet LEED silver certification standards and all applicable building codes and VA design criteria.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PPQ - Tampa Morgue.docx | DOCX document | |
| 36C77623R0167.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
James A. Haley Veterans' Hospital
13000 Bruce B. Downs Boulevard
Tampa, FL 33612-4745 08/12/2023
A/E SCOPE OF WORK
PROJECT TITLE: CONSTRUCT NEW MORGUE
PROJECT NUMBER: 673-905
1. OVERVIEW:
1.1 INTRODUCTION/PROJECT INTENT:
1. Project Description: This project requires the VA to hire an Architectural firm to design the morgue to be pandemic functionality ready and in capacity. The Annex Morgue design (Area of 1296 sq ft) and existing Morgue replanning Renovation (Area of 1493 sq
ft) shall be design simultaneously and integrated into one complete construction document that shall be used by the VA for bidding and construction. The morgue, located on the ground floor of Building 1, requires a significant upgrade to comply with present-day standards and new post pandemic laws and requirements. The new amenities will comprise contemporary features such as hazmat liquid waste disposal, isolated autopsy facilities, and A standalone and redundant HVAC system. The annex and current morgue shall have state of the art infrastructure to support new requirements.
2. Phases of A/E Services: A/E shall provide the services indicated. These services will be provided in distinct phases:
• Schematics – Preliminary User Group Meetings & Field Surveys – first review submission – “DD 1” Design Development
• 30% Submittal – “DD 2” Design Development
• 60% Submittal – “CD” Construction Documents
• 90% Submittal – “CD” Construction Documents
• 100% Submittal – Bid [Final] Documents.
• Construction Period Services
• Project Close Out Submittal – “As-Built” Construction Documents
2. GENERAL SCOPE:
2.1 DESIGN DISCIPLINES/SERVICES: Architect shall engage the services of all Engineering consultants in each discipline deemed to be necessary to fulfill the requirements of the project design plan. The following are the minimal expected disciplines to be used for this scope of work. A/E may include additional services which should be identified during proposal submission:
1. Demolition: The project demolition work may include architectural, plumbing, mechanical, and electrical demolition to clear space for the new systems. The minor https://www.va.gov/tampa-health-care/locations/james-a-haley-veterans-hospital
Tampa, FL 33612-4745 08/12/2023 demolition of existing landscaping and other items shall be included in this project. All structural members of the building shall be shore and supported during demolition. All demolition debris shall not concentrated any suspended concrete slab or floor.
2. Architectural: Field verification of elevations and architectural dimensions are crucial to the success of this project, as the existing drawings are best represented. Exterior work must blend into the surrounding buildings and architectural appearances. Patient and
Family Centered Care concepts are to be included in the design of this project. These concepts are outlined in the VA technical information library design guide documents.
See paragraph I.D.2 for additional information.
3. Structural/Civil: Work include architectural design and design modification that shall require structural design and computation analysis. Structural engineering is expected to be completed by a Florida Licensed Structural Engineer for all needed structural design requirements and shall required geo tech testing to support and complete the
Architect’s design. The A/E civil engineering shall be limited to the exterior amenities of architectural design.
4. Interior Design: The VA Interior Designer shall collaborate with the A/E in all project’s building interior material selections and provide color scheme from VA Interior Design Master plan. The A/E shall submit to the VA Interior Designer material samples and color swatches that shall be approved or dis-approved within 7 calendar days.
5. Plumbing/Piping: The plumbing systems need to be redesigned and updated to meet the latest Plumbing Codes. Design modifications, additions and relocations to the plumbing systems and fire protection system must follow the VISN 8 policy and Life Safety codes and other applicable code requirements for a complete certified functional system. Additional design consideration shall be considered for Morgue liquid waste to the disposal to the hospital main sewer line.
6. Heating, Ventilation, and Air Conditioning (HVAC): The HVAC systems need to be evaluated and updated to meet the latest VA design guide HVAC Design Criteria. The
A/E design shall be standalone and system redundancy in place. All HVAC shall comply to the latest rule and regulation requirement in the State of Florida and national HVAC design manual for Hospital.
7. Electrical: The electrical systems need to be evaluated and updated to meet the latest
Design Criteria. The A/E must evaluate the electrical systems serving architectural design scope area to determine if there is enough and provide modifications and
Tampa, FL 33612-4745 08/12/2023 extensions to the existing electrical systems, security system, communications system, fire / safety system, etc. All panels shall be metered before any planned connection to insure available capacity. This required metering will be the responsibility of the A/E firm to complete. This design shall evaluate existing as–Built drawings and all ongoing electrical upgrade projects during the design process.
8. Life Safety: In addition to in-house staffing, an independent third-party life safety expert must review design to ensure it meets current life safety requirements.
9. Fire Protection Engineer: The VA requires that all spaces shall be 100% sprinkled throughout the facility. The A/E shall have a fire protection engineer on staff to review and approval stamp the design/build fire protection system in the project as necessary.
10. Special Systems and Equipment: The design will include all special systems and equipment associated with the functions of the space. The A/E shall be required to coordinate the design work directly with the suppliers/ manufacturers of the new equipment and existing to produce a completely designed operational project. All drawings, schematics, and other data available from the equipment suppliers shall be incorporated in the A/E drawings and specifications. The design shall address special systems including but not limited to elevators, fire alarms, telecommunications, security (card access/CCTV), medical gas monitoring, public address, and nurse call systems. Any new building or renovated space must tie into the existing fire alarm system at the facility.
11. Energy & Resource Conservation: Any alterations or new equipment (motors, light fixtures, windows, HVAC equipment, pumps, chillers, water faucets, urinals, toilets, insulation, etc.) shall be energy efficient and resource efficient. This facility’s overall energy usage goal is 142,000 BTU/sq. ft. (142 MBTU/SF). Energy Star, LEEDS and other related criteria shall be utilized. Light bulbs and other equipment shall have very low mercury content or NOT contain mercury at all.
12. LEED Certification: The design of this building must meet the LEED requirements for silver certification, as required by the USGBC. A/E shall provide all required documentation, submit required applications and fees, and perform all necessary coordination to obtain LEED certification.
13. Hazardous Material: See Appendix C
2.2 SITE INVESTIGATION:
1. A physical survey of the construction site and renovation area shall be conducted.
Tampa, FL 33612-4745 08/12/2023
2. The A/E is required to conduct destructive investigations as necessary to minimize deferring site conditions. Penetrations for visible access into walls, hard ceilings, chases, and other locations are the responsibility of the A/E and shall be coordinated with COR.
A/E will be responsible to create openings in hard ceilings, openings in walls, and openings in chases and other areas as necessary. This should be established as a unit price. Locations should be coordinated with COR and ICRA/ILSM practices must be coordinated with COR. A/E is required to repair openings back to original fire code requirements within 48 hours.
2.3 SURVEYS:
1. The A/E shall make all field surveys required for design and of construction documents.
In general, this may consist of topographic site surveys, alignment, profiles and cross sections. Enough semi -permanent survey points to serve as initial horizontal and vertical survey controls for construction of the project shall be set. The horizontal control points and benchmarks shall be shown and described on the plans. The datum used shall be that used for the station or area in question and shall be shown on the appropriate site drawings. The surveying firm shall obtain from the COR the benchmark or datum location to be used for the project design. That datum shall be confirmed in writing. Failure to comply with this requirement may be cause for survey/design re work at no additional cost to the Government. Boundary surveys to be used as instruments for real estate purposes shall carry the seal of a licensed land surveyor acceptable to the political subdivision in question.
2.4 SUBSURFACE CONDITIONS:
1. The A/E is required to take soil borings and evaluate subsurface conditions in all cases where the Contracting Officer and A/E determine that soil explorations and laboratory soil test data are necessary, i.e., when adequate data is not available in the VA’s files.
Include soil borings in project drawings. Include a note to bidders listing what subsurface information is available (i.e., test results, interpretations, recommendations, etc.). The A/E shall analyze and interpret all necessary information concerning foundation soil conditions and shall include, in the preparation of specifications and drawings, complete and specific coverage of procedures for foundation construction and for handling unusual subsurface conditions.
2. The A/E shall contact the COR prior to arriving on the station and obtain approval to dig, probe, sample or drill in order to avoid injury or damage from encountering active utilities. All project areas that require subsurface exploration (bore holes or test pits) during the design stage or will require excavation during constructions shall be scanned for the presence of existing underground utilities by the A/E design contractor (or sub
Tampa, FL 33612-4745 08/12/2023 consultant). This information, in conjunction with file drawing research (review of existing as-builts from prior projects) and field survey location of above ground visible utilities, shall be used by the A/E to create a site plan showing all known utilities in the affected area. Depths to utilities shall be estimated whenever possible. All costs associated with the location of existing utilities shall be the responsibility of the A/E.
2.5 PHRASEOLOGY: The following instructions that relate to common errors in phrasing have evolved from the VA’s experience with A/E specifications:
1. Under “Requirements”, do not use the phrase "the work consists of" – instead use the phrase "the work includes". Drawings should show scope if necessary to list certain parts.
2. In lieu of reference to the accompanying drawings or the Contracting Officer, use the words "as shown", "as indicated", "as detailed" or "as approved", "as directed", "as permitted" - do NOT use the words "as shown on drawings" or "as approved by the
Contracting Officer". That clause of the Contract Clauses entitled “Specifications and
Drawings for Construction” defines the meaning of these and similar terms.
3. Do NOT use the expression "to satisfaction of the Contracting Officer" or "satisfactory to the Contracting Officer". The contract states specifically that all work must meet the approval of the Contracting Officer.
4. There are two parties to the contract - (1) the Government, represented by the
Contracting Officer and (2) the Contractor. Therefore, do NOT use such expressions as
"subject to the approval of the architect", "when in the opinion of the architect", "this contractor", "masonry contractor", or "subcontractor". Do not use the term "owner" -use the term "Government".
5. Do NOT use etc.; the term is too imprecise for bidding and inspection purposes.
6. The use of the expression "as indicated on the drawings" is very seldom necessary; the fact that a detail is on the drawings makes it unnecessary to mention it in the specification. If the expression is used and the item is not shown, the contractor is not required to provide it.
7. Do NOT use expressions such as "The work required shall include, unless stated specifically otherwise, the provision of all materials for the installation of all concrete, including reinforcement necessary to the construction and completion of the work per the drawings, the specifications, and the intent thereof". Since the drawings indicate clearly the exact limitations of the several classes of work, defining the limits of work within the specifications is superfluous and may be contradictory by failure to mention something shown clearly and intended to be included.
8. Minimize the use of cross-references and in NO case use paragraph numbers for this purpose. If necessary to refer to a particular paragraph, do so by its title and the section number and title under which it is to be found. Cross -references of the following type
Tampa, FL 33612-4745 08/12/2023 are totally unnecessary - "Painting of the woodwork is covered under "'Painting'" or
"painting is specified hereinafter". i. Do NOT place upon the contractor the responsibility for the possible inaccuracy of, or the lack of, information on the part of the Government; e.g., never use sentences similar to "although the drawings indicate approximately the conditions that are likely to be found, bidders should satisfy themselves as to the actual conditions, for while they are believed to be shown, the
Government does not guarantee the accuracy of the information given and the bidder shall assume all responsibility in the use of such". Remember that the Government is responsible for the accuracy and sufficiency of the information it gives to bidders or contractors and the A/E is in turn responsible to the Government for that same information. It will be necessary to establish in the project specification a def inite basis of bid. For example, on a roof rehabilitation project where the extent of defective construction is unknown, the specification shall set forth, as a basis of bid, a definite amount of work to be performed and provide for adjustment per the Contract Clauses if the extent of work varies from the amount stated under the basis of bid.
9. Do not include warranties in technical sections unless they are for more than one year, and generally not unless they are included in the NAVFAC guide specification. A one-year warranty is covered in the Contract Clauses.
10. Do NOT set up a paragraph in the various sections entitled “Work not Included”. Specify the work that is included under the respective sections.
11. Specifications should clearly delineate equipment, ducts and piping systems that are required to be insulated. The phrase "insulating all ducts except in conditioned spaces" has resulted in differences of opinion and claim situations; also, all duct systems should be appropriately designated as supply, exhaust, fresh air intake, or return to further clarify insulating requirements.
2.6 CODES, STANDARDS AND EXECUTIVE ORDERS:
1. The Public Buildings Amendment Act of 1988, Public Law (Pub. L.) 100-678 requires
Federal agencies to follow national recognized "model" building codes. The VA has adopted the latest edition of the following codes and standards as a minimum for all projects performed in the modernization, alteration, addition, or improvement of its real property and the construction of new structures. The VA design Manuals and
Master Specifications specify other codes and standards that VA follows on its projects:
i. VA Directives, Design Manuals, Master Specifications, VA National CAD
Standard Application Guide, and other Guidance on the Technical
Information Library (TIL) (http://www.cfm.va.gov/til/).
ii. International Building Code (IBC) including International Mechanical and
Plumbing Codes
iii. NFPA 101 Life Safety Code (see notes below)
Tampa, FL 33612-4745 08/12/2023
iv. NFPA National Fire Codes with the exception of NFPA 5000 and NFPA
900.
v. Occupational, Safety and Health Administration (OSHA) Standards
vi. VA Seismic Design Requirements, H-18-8
vii. National Electrical Code (NEC)
viii. National Standard Plumbing Code (NSPC)
ix. Safety Code for Elevators and Escalators, American Society of Mechanical
Engineers (ASME) A 17.1.
x. ASME Boiler and Pressure Vessel Code
xi. ASME Code for Pressure Piping
xii. Architectural Barriers Act (ABA) including VA Supplement, Barrier Free
Design
xiii. Building Code Requirements for Reinforced Concrete, American Concrete
Institute and Commentary (ACI 318)
xiv. Manual of Steel Construction, Load and Resistance Factor Design
Specifications for Structural Steel Buildings, American Institute of Steel
Construction (AISC)
xv. Energy Policy Act of 2005 (EPAct)
xvi. American Society of Heating and Refrigeration Engineers (ASHRAE) 90.1, Energy Standards for Buildings Except Low-Rise Residential Buildings
xvii. Federal Leadership in High Performance and Sustainable Buildings:
Memorandum of Understanding (MOU)
xviii. Executive Order 13423: Strengthening Federal Environmental, Energy, and Transportation Management
xix. Executive Order 13514: Federal Leadership in Environmental, Energy, and
Economic Performance
xx. The Provisions for Construction and Safety Signs. Stated in the General
Requirements, Section 01 00 00, of the VA Construction Specifications
xxi. American Society of Heating and Refrigeration Engineers (ASHRAE), Ventilation for Acceptable Indoor Air Quality – ASHRAE Standard 62.1
xxii. Safety Standard for Refrigeration Systems – ASHRAE Standard 15
2. Additional Notes: NFPA 101 primarily addresses life safety and fire protection features while the IBC addresses a wide range of considerations, including, but not limited to, structural strength, stability, sanitation, adequate light and ventilation, and energy conservation. VA buildings must meet the requirements of NFPA 101, and documents referenced by NFPA 101 in order to comply with the accreditation requirements of the joint Commission. Therefore, designs shall comply with the requirements of the latest edition of NFPA 101, and documents referenced therein. Design features not addressed
Tampa, FL 33612-4745 08/12/2023 by NFPA 101, or documents referenced therein shall comply with the requirements of the latest edition of the IBC or as otherwise addressed above in this Program Guide. For design features that are addressed by both the IBC as well as NFPA 101 or a document referenced by NFPA 101, the requirements of NFPA 101 or the document referenced by
NFPA 101 shall be used exclusively. This applies even if the IBC requirements are different.
3. Conflicts between Nationally Recognized Codes and Standards and VA Requirements:
Should a conflict exist between VA requirements and VA adopted nationally recognized codes and standards, the conflict shall be brought to the attention of the VA. The resolution of the conflict shall be made by the authority having jurisdiction for the VA to ensure a consistency system wide.
4. Design Deviations from VA Standards: When proposing a variation, deliver a written request to the Contracting Officer who will render decision after discussing with COR.
Documentation will include the nature and features of the variation and why the variation is desirable and beneficial to the Government. If lower cost is a benefit, also include a high magnitude cost comparison.
2.7 QUALITY CONTROL:
1. Quality Control Plan: The A/E shall prepare a Quality Control Plan (QCP) which includes the following as a minimum:
• Identification and discussion of all organizational and technical interfaces
• Design team members and their areas of responsibility
• Team members responsible for checking the design.
• Team members responsible for checking the electronic files.
• Team members responsible for reviewing and submitting the required VA Design Alerts and Quality Alerts
• Project Schedule showing key milestones and review periods.
2. VA Design Alerts and VA Quality Alerts can be found on the internet at http://www.cfm.va.gov/TIL/ .
3. Quality Assurance: The A/E is responsible for developing and performing quality assurance reviews of all work to confirm that proper criteria, regulations, laws, codes, principles and professional procedures have been used. This includes work performed by subcontractors. The VA shall review all project submissions, but this review is general in nature and should not be considered as part of the A/E’s Quality Control P lan and/or Quality Assurance.
http://www.cfm.va.gov/TIL/
Tampa, FL 33612-4745 08/12/2023
4. Quality Certification: The A/E shall certify at each submission in writing that he/she has performed quality assurance reviews of that submission.
3. GENERAL SUBMISSION SERVICES:
3.1 Review Aids: A/E will complete the review aids in Appendix A for each submission to aid the A/E and the COR in ensuring project design level is at appropriate level:
3.2 Drawings:
1. The A/E shall provide electronic copies of drawings at each review step generated in the latest version of AutoCAD or its companion products (digitally signed DWGs) and PDF format in individual sheet files on CD-ROM. Include all associated support files (i.e., plot styles, external referenced files, etc.). The standard drawing size shall be ARCH E1 (30” x
42”). The format to be used in creating the CAD drawings ( i.e., layer / level structure, fonts, font sizing, file naming conventions, etc.) is that of the latest edition of the
National CAD Standard (www.nationalcadstandard.org).
a. The A/E shall follow these level/layer formats, file – naming conventions, and symbol library.
b. Drawings are to be drawn from the VA’s “As Built” or construction drawings updated by site verification, not scanned reproductions.
c. The final sets of the new construction drawings, including the film copies, shall be sealed (embossed & ink stamps) and signed by each respective Professional Engineer in their discipline, Industrial Hygienist, Architect and other necessary licensed professional consultants.
3.3 ESTIMATE SUBMISSION REQUIREMENTS:
1. The A/E shall submit a construction cost estimate from an independent firm for all trade disciplines at each project submission in detail as described in Appendix A. This estimate shall reflect the impact of the planned acquisition strategy provided by the
COR. The level of detail for this estimate shall be consistent with the degree of completeness of the drawings being submitted. Therefore, if it is shown, it must be priced. If it is shown in detail, it must be priced in detail. For detailed elements , "lump sum" or "allowance" figures will not be acceptable. Building gross area computations shall be included with each estimate. Estimates shall be broken down by AIA divisions.
The first page will be a summary page showing deductive bid items, contractor mark-ups, overhead, profit, special insurance, and bonding to reflect true construction costs.
The breakdown shall reflect Bid Items 1, 2, 3…. separately, then in aggregate. All construction cost estimates shall conform to the requirements containe d in VA Manual http://www.nationalcadstandard.org/
Tampa, FL 33612-4745 08/12/2023 for Preparation of Cost Estimates (latest edition). Manual is available on the internet at http://www.cfm.va.gov/cost/
2. THE A/E IS RESPONSIBLE FOR ESTABLISHING INTERNAL CONTROLS FOR KEEPING THE
PROJECT DESIGN WITHIN PROJECTED CONSTRUCTION FUNDING. THE A/E WILL BE
REQUIRED TO REVISE DESIGN AND RESUBMIT COST ESTIMATES AS NECESSARY (AT NO
COST TO THE VA) SHOULD COST ESTIMATES EXCEED CONSTRUCTION FUNDING. Bid
Deducts are not to be considered in maintaining the budget – they are intended to support unexpected variables in bidding, not in upfront design. See 52.236-22 DESIGN
WITHIN FUNDING LIMITATIONS for additional information.
3. The A/E shall design the project in such a manner that the base bid shall include the sum total of the work. However, there must be deducting alternate bid items. The deducting alternative bid items shall have a goal of equaling 10% of the proposed construction budget. The resulting project must still be a viable project if all alternatives are deducted from the construction project. No matter which option is selected, the hospital must continue to function during construction.
3.4 PROPOSED PHASING AND CONSTRUCTION SCHEDULE:
1. Proposed Construction Schedule: The A/E shall prepare a proposed schedule for construction that is consistent with the project construction cost estimate. During development of this schedule, due consideration will be given to standard construction practices, durations of tasks, the sequence of construction, procurement of materials, climatic conditions, etc.
2. Phasing – It is planned that areas in and adjacent to the proposed construction area shall be occupied during construction. The A/E shall develop a minimum of 3 phasing plans and base line comparison of no phasing in project at Conceptual submission. The comparison shall include description, bubble drawing presentation, impact on budget, impact on timeline, impact to maintain VA standards during each phase (for example will HVAC be maintained at VA standards in the occupied areas), impact on life safety and emergency egress and all other known pros and cons for each phase. A/E shall modify based on any follow up questions. VA will select one alternative within 14 calendar days of final presentation.
3. A/E is responsible to discuss phasing at all design submission meetings. Identification of potential construction task that would minimize disruptions if performed off hours and weekends shall be included along with identification of major utility interruptions.
http://www.cfm.va.gov/cost/
Tampa, FL 33612-4745 08/12/2023
3.5 SPECIFICATIONS:
1. General: The A/E shall utilize the latest edition of VA Master Specifications as revised and provided by the facility supplemented by the VA Office of Construction and Facilities Management Master Specifications as needed. The VA retains no responsibility for the development or preparation of any specification. While it is recognized that certain Divisions and/or Sections will require significant input from the VA, the A/E retains overall responsibility for these Sections.
2. Electronic Files: All files shall be IBM compatible and furnished on high quality CD-R disks. Provide in accordance with Supplement “B” sets of specifications (MS Word). The computerized version, format and media of the computer disks and files shall be specified and verified by the VA Project Engineer at the time each submission is due (ZIP files are not acceptable). Provide durable high quality plastic storage boxes at each submission for long term archiving of the disks and each file for the Final Specs and
Drawings must be 20MB or less.
3. Outline Specifications: The A/E shall develop an outline specification listing the proposed guide specifications and the A/E prepared sections that will be used for the project. The outline specification will list the guide specification number and title for each proposed section. Sections shall be arranged within their respective divisions, in numerical order. New specification sections, developed by the A/E, will be numbered to fall in their respective division at a logical location.
4. Editing Specifications: The A/E must thoroughly edit and adapt the Specifications to satisfy the project requirements and provide a complete set of construction specifications. The A/E shall notify the VA in writing should there be instances where there are no appropriate Master Specifications available for use. At the VA’s direction the required specifications will be prepared by the A/E. These specifications shall list the essential features, functions, and other factors to clearly indicate the type and quantity of items/work required. All specifications will be prepared by listing parameters and requirements that can be met by several manufacturers.
5. Construction Contractor Submittal Register: The specifications require the construction contractor to submit shop drawings, samples, manufacturer’s data, certificates, test reports, and other items to the Government. The A/E shall prepare a complete listing of construction contractor submittal requirements on an Excel Spreadsheet. The spreadsheet shall have a separate line for each required submittal and separate columns for Division, Section, and type of submittal (catalog cut, sample, etc).
3.6 DESIGN SITE VISITS, MEETINGS/CONFERENCES, AND DISCUSSIONS:
Tampa, FL 33612-4745 08/12/2023
1. Site Visits: The A/E shall perform design site visits as required to accomplish the scope of this project. The purpose of these visits is to further define project requirements, observe and evaluate existing field conditions, review any existing documentation, conduct required design meetings, and to gather supplemental site data necessary for performing the design. Reports summarizing the conditions observed, personnel contacted, and data gathered during the visits shall be prepared and included in the
Design Development Documentation.
2. Design Review Conferences: Design review conferences shall conduct shortly following the issuance of each review Submission. Refer to Supplement B for the proposed schedule but will typically take place two weeks after the submission date. Design review conferences for the Schematics, Design Development and Construction
Document Development phase shall include the A/E Project Manager/Senior Designer.
These conferences shall take place at the facilities where the work is being performed.
3. Site Visit and Meeting Minutes: The A/E shall take notes and prepare minutes for all site visits, meetings and conferences attended during design. Minutes will be prepared in typed form, signed by the A/E Project Manager, and furnished to project engineer within seven calendar days after the meeting/conference for concurrence and distribution to attendees. Copies of all meeting/conference minutes will be included in each Submission. Minutes shall include all request for changes by VA. If change is unable to be made, explanation of why shall be provided.
4. DESIGN SCHEDULE:
Design schedules shall be submitted to the VA as an 11x17 Microsoft Projects file at the beginning of the Notice of Award, with each invoice for payment and shall never be more than
4 weeks old. Time frames below are calendar days. Any requested adjustment to timeline shall be submitted to Contracting in writing:
i. Schematics Design (Notice of Award): NOA+ 7 DAYS
ii. Begin Design Development (Notice of Award): Design + 14 DAYS.
iii. First Submission of Design Development (DD1–Schematics 10%): NOA +
28 Days
iv. First Review Meeting and Return First Submission: NOA + 42 Days.
v. Second Submission (Final Design Development) (DD2–30%): NOA+ 84
Days
vi. Second Review Meeting and Return Second Submission: NOA + 98 Days.
vii. Third Submission Contract Documents (CD1-65%): NOA + 133 Days
viii. Third Review Meeting and Return Third Submission: NOA + 147 Days.
ix. Fourth Submission Contract Documents (CD2-95%): NOA + 175 Days
Tampa, FL 33612-4745 08/12/2023
x. Fourth Review Meeting and Return Fourth Submission: NOA + 200 Days.
xi. Fifth Submission (Deliver Final Contract Documents) (CD3-100%): NOA +
214 Days.
xii. Fifth Review Meeting and Return Fifth Submission: NOA + 250 Days.
xiii. Final design submission: NOA +284 Days
A. Solicitation Support Services (Option Line Item) shall be performed for the length of time between the time the option is exercised and award of the construction project.
B. Construction Period Services (Option Line Items) and Commissioning (Option Line Item) shall be performed for the length of time between the time the option(s) are exercised and acceptance of Construction Completion.
C. The VA has 365 calendar days from final acceptance of the design to exercise the option(s) for Solicitation Support Services, Commissioning and Construction Period Services.
5. SUBMISSION REQUIREMENTS:
5.1 FIRST REVIEW: Schematic (DD1) – Roughly 10 - 15% complete.
1. Submittals: Three (3) copies of the complete package in 3 separate binders. Each section other than drawings shall be in binder and each section identified by individual tab allowing for easy separation of package by VA if desired to expedite reviews.
Drawings shall consist of 1 full size and 2 half size. Provide electronic copies of the entire submission on one (1) CD-ROM with each section as separate file.
2. All Disciplines: Follow Appendix A
3. Specifications: In addition to Appendix A, submit a cover letter and a list of VA master specifications intended for use on this project.
4. Drawings: In addition to Appendix A, the A/E shall provide a full list of project drawings showing the scope and plan for each discipline involved.
5. Phasing: Follow Section 3.2.2
6. Acceptance: If the documents do not meet all of the requirements of this submission, then the portions of the documents that are not acceptable by the VA according to the design standards and criteria must be updated by the A/E prior to moving on to the next scheduled submission. Government acceptance does not relieve the Design of Record of their responsibility for the accuracy of the design documents.
5.2 SECOND THRU 100% REVIEW:
1. Submittals: Three (3) copies of the complete package in 3 separate binders. Each section other than drawings shall be in binder and each section identified by individual tab allowing for easy separation of package by VA if desired to expedite reviews. Drawings shall consist of 1
Tampa, FL 33612-4745 08/12/2023 full size and 2 half size. Provide electronic copies of the entire submission on one (1)
CD-ROM with each section as separate file.
2. Follow requirements of Appendix A in addition to the following:
i. Previous meeting minutes: Include all minutes from previous meetings.
ii. Site Drawing (if applicable): Ensure drawings show parking and material staging areas of this project. Area shall be balance of reasonable expectation of needed space to perform work and facility situation of limited parking.
iii. Phasing: Ensure agreed upon phasing plan is presented at all meetings. Present any additional details developed throughout the process. Include narrative in submission.
iv. 100% Submission only: Certified Independent Third-Party Safety Professional
Review must be completed and a letter with comments submitted with this submission.
v. Acceptance: If the documents do not meet all of the requirements of this submission, then the portions of the documents that are not acceptable by the
VA according to the design standards and criteria must be updated by the A/E prior to moving on to the next scheduled submission. Government acceptance does not relieve the Design of Record of their responsibility for the accuracy of the design documents.
5.3 FINAL SUBMISSION: After material of the Fourth Review has been reviewed, the A/E shall make necessary changes to incorporate all review comments (VA, CITP Safety Review, etc.) and furnish the following:
1. Specifications: Six (6) copies of the edited specifications double-sided in loose-leaf form ready for photocopying. One copy in a 3-ring binder, labeled. Format to be as stated earlier under “Specifications.”
2. Drawings: The drawings shall be 100% complete in every respect. Provide six (6) complete sets of drawings, three (3) full-size prints and three (3) half-size prints. Also provide two (2) electronic copies of the drawings in accordance with section I.D.6.
i. Provide one sealed set of original film drawings. Each discipline shall be separately sealed.
ii. Provide all calculations for the project including, but not limited to, architectural, structural, plumbing, mechanical, and electrical.
iii. Provide two (2) CD-ROMs with all project materials, including drawings, specifications, and calculations.
6. SOLICITATION SUPPORT SERVICES (OPTION ITEM):
i. Provide bidding assistance in the form of answering technical questions in writing during the bidding period. Addressing any issues with the
Tampa, FL 33612-4745 08/12/2023 specifications clarifications and issuing plan or drawings interpretation by means of sketches, etc. Written responses shall be prepared and forwarded to the VA CO and COR and not to the bidder/offeror. The A/E must also attend the pre bid conference prior to construction.
7. CONSTRUCTION PERIOD SERVICES (CPS)(OPTION ITEMS):
7.1 – GENERAL: CPS Services shall include, generation of baseline submittal schedule, review and approval of construction submittals covering products that have been listed within the contract documents and contractor substitutions, manufacturer’s data/performance sheets, samples, shop drawings, schedules, phasing plans. Compatibility analyses of dif ferent materials and recommendations associated with acceptance or rejection of alternate materials and products. Responses to Request for Information (RFI); change order review and recommendations; preparation of cost estimates to Request for Proposal (RFP);
cost/time/impact estimates and recommendations relevant to design omissions and construction plan deviations. The VA reserves the right for final approval/disapproval on all
RFIs, submittals, change orders and contractor estimate.
1. RFIs: Maintain Log including VA final approval. Review and respond to all design related RFI’s within (7) calendar days.
2. Submittals: Maintain log including VA final approval. Review all submittals for the project within (14) calendar days.
3. Modification/Change Order Requests: Modification requests shall be submitted within seven calendar days of submittal to the A/E. This includes the review of the contractor’s change order/modification proposal for construction change orders, as well as the formulation of SOW and IGCE for the modification, as requested. The A/E's reply regarding his/her review of cost proposals and his/her recommendations shall include an independent breakdown of costs in detail, quantities, and unit prices and shall cover both additions and deductions of labor, materials, and equipment. The A/E shall also supply cost estimates as requested by the COR for Requests for Proposals for anticipated changes. All documents in any of the electronic formats listed above. Note: If major modification, VA will provide additional time and document format guidance.
4. Site visits: documentation of all necessary site visits to the VA Project Engineer within one (1) week after the visit
ii. A/E to attend weekly Construction meeting with VA and Construction
Contractor.
iii. The A/E must conduct one site visit per month during construction.
iv. The A/E must attend the close out punch list after construction of each phase is complete.
Tampa, FL 33612-4745 08/12/2023
5. At project completion, the A/E must verify as built conditions from contractor supplied marked up prints and furnish two (2) updated sets of prints / record drawings (one set to be film), and two (2) electronic copies in accordance with section I.D.6.
6. The A/E to perform/witness commissioning of the building systems. The A/E is to provide this through a certified third-party.
7.2 HAZARDOUS MATERIALS (Option Items as part of CPS pages 58 and 61) – SEE APPENDIX C
7.3. EVALUATION OF CONSTRUCTION CONTRACTOR VALUE ENGINEERING CHANGE
PROPOSALS (VECPS):
1. The purpose of a VECP is to achieve savings in cost by adjusting the design so as to permit more economical methods and materials of construction and still maintain the operational, functional and aesthetic quality of the facility. Note that a construction contractor VECP differs from a construction contractor proposed variation or exception to the contract documents in that a VECP must maintain at least the same level of quality as in the original design while a proposed variation or exception could lower the quality of construction. Under the VECP program, the contractor and Government share in the savings resulting from acceptable proposals while a full credit (deduct) in the construction contract price is taken for approved variations or exceptions which are of lesser quality than the original design.
2. In addition to the general requirements, consultation reports on A/E evaluation of
VECPs shall include the advantages and disadvantages of the VECP, and economic analysis & justification for recommending approval or rejection of the VECP.
3. In order to avoid tacit delays to construction, Government processing time for VECPs is held to 21 calendar days from the date the Contracting Officer receives the VECP package from the contractor. Accordingly, the A/E shall complete and forward consultation reports on VECPs to the Contracting Officer and COR within five (5) working days from the time of receipt. When the VECP is of the nature that the response requires additional time, the A/E shall notify the Contracting Officer as to the expected date of responses.
7.4 ERRORS AND OMISSIONS:
1. Architect-engineer contractors shall be responsible for the professional quality, technical accuracy, and coordination of all services required under their contracts. A firm may be liable for Government costs resulting from errors or deficiencies in designs furnished under its contract. Therefore, when a modification to a construction contract is required because of an error or deficiency in the services provided under an architect-engineer contract, the contracting officer (with the advice of technical personnel and
Tampa, FL 33612-4745 08/12/2023 legal counsel) shall consider the extent to which the architect-engineer contractor may be reasonably liable. The contracting officer shall enforce the liability and issue a demand for payment of the amount due, if the recoverable cost will exceed the administrative cost involved or is otherwise in the Government’s interest. The contracting officer shall include in the contract file a written statement of the reasons for the decision to recover or not to recover the costs from the firm.
2. Reimbursement of costs incurred by the Government as a result of A/E's error and/or negligent performance are actively pursued by the VA. Upon determination that there may be A/E financial responsibility involved, the A/E shall be contacted by the
Contracting Officer. The A/E shall be advised of the design deficiency and requested to provide a technical solution to the problem, including cost estimate. The A/E shall be further informed that it is the Contracting Officer’s that the A/E may be held financially responsible. A/E financial responsibility can include contractor extended overhead costs. Therefore, upon notification of potential liability, the A/E should coordinate with the directing official to determine required technical support and timing to minimize delay costs. Pending final decision by the Contracting Officer, the A/E will be invited to attend all price negotiations for corrective work. The A/E shall participate as a non-voting technical advisor to the Government negotiating board. Inability to obtain agreement from the A/E as to financial responsibility or A/E unwillingness to participate in negotiations shall not be cause for delay or remedial construction contract action by the Contracting Officer. As an alternate to the above, the A/E (where design error is clearly at fault) may discharge the firm's financial responsibility through negotiation with, and direct payment to, the contractor.
Tampa, FL 33612-4745 08/12/2023
Appendix A
Submission Review Tools
The A/E is required to complete and submit the following tables to enhance evaluation of each submission. This should be used by the AE as a self-assessment tool to ensure full understanding of submission requirements. Providing documentation will aid the VA in review by understanding the AE intentions for each submission .
A/E Milestone Schedule Track
Milestone Submission
Planned Duration
Planned Date
Revised Duration
Revised Date
Actual Duration
Actual Date
Conceptual
30% 60% 90%
100% Duration shall be provided as days after NTP. Date shall be calendar date that matches duration.
Applicable Submission Requirements
Program Applicable Not Applicable
Site Development Architectural Fire Protection
Interior Design Structural
Plumbing Sanitary
HVAC
Electrical Equipment
Steam Generation Steam Distribution (Outside)
Solid Waste Disposal System Automatic Transport Asbestos Abatement
Space Planning Critical Path Method
Estimating Specifications
Tampa, FL 33612-4745 08/12/2023
Complete below checklist for all applicable requirements. Enter “Y” for every submission provided. If A/E believes a specific item on checklist that is generically required is not applicable for this specific project, enter NA with brief explanation below the table.
Tampa, FL 33612-4745 08/12/2023
AE Submission Checklist
SITE DEVELOPMENT: Submit the following:
Site Development: 30%* AE Self Conf irmation
60%** AE Self Conf irmation
90%*** AE Self
Narrative ✓
Analysis of site ✓
Circulation study ✓
Phasing analysis ✓
Parking analysis ✓
Development concept showing proposed buildings and structures
Landscape drawings with plant groupings
Topographic, utility, and landscape survey
Demolition plan ✓ ✓ ✓
Layout plan showing location of:
• Building and structures ✓ ✓ ✓
• Roads ✓ ✓ ✓
• Fire Access ✓ ✓
• Parking ✓ ✓ ✓
• Accessible spaces ✓ ✓
• Van spaces ✓ ✓
Tampa, FL 33612-4745 08/12/2023
Site Development: 30%* AE Self Conf irmation
60%** AE Self Conf irmation
• Mechanical and electrical equipment on grade
• Future expansion ✓
• Off-site roads ✓ ✓ ✓
• Off-site utilities ✓ ✓ ✓
• Service area(s) ✓ ✓
• Entrances and exits ✓ ✓
• Walks ✓ ✓
• Inlets ✓ ✓
• Contractor's staging area ✓ ✓
• Vertical and horizontal road alignment
• Paving joint patterns ✓ ✓
Grading plan showing:
• Existing contours ✓ ✓
• Proposed contours ✓ ✓
• Spot elevations at structure corners, entrances, equipment pads, etc.
• First floor elevations ✓ ✓
• Rim and invert elevations on storm drainage fixtures
• Erosion and sediment control ✓ ✓
Rock excavation (quantity) ✓ ✓
Planting plan showing:
• List of plant material ✓ ✓ ✓
• Limits of irrigation ✓ ✓ ✓
Tampa, FL 33612-4745 08/12/2023
Site Development: 30%* AE Self Conf irmation
60%** AE Self Conf irmation
Site details ✓ ✓
Landscape details ✓ ✓
Signage plan and schedule ✓ ✓
Specifications ✓ ✓
* Submit site and landscape plans at an appropriate scale to show all work involved.
** Submit site and landscape plans at same scale as topographic/utility survey incorporating all of the revisions required by comments from schematics.
*** Submit fully dimensioned, complete, and coordinated site and landscape plans incorporating all revisions required by comments from the design development phase.
ARCHITECTURAL: Submit or show the following:
Architectural: 30%* AE Self
DD** AE Self Conf irmation
CD*** AE Self
Location of:
• Rooms1 ✓ ✓ ✓
• Doors2 ✓ ✓ ✓
• Corridor(s)3 ✓ ✓ ✓
• Basic column grid/sizes ✓ ✓ ✓
• Expansion and seismic joints ✓ ✓ ✓
• Electrical closets ✓ ✓ ✓
• Equipment rooms ✓ ✓ ✓
Tampa, FL 33612-4745 08/12/2023
Architectural: 30%* AE Self Conf irmation
DD** AE Self Conf irmation
• Signal and telephone closets ✓ ✓ ✓
• Mechanical shafts and space ✓ ✓ ✓
• Stair(s) ✓ ✓
• Ramp(s) ✓ ✓
• Elevator(s) ✓ ✓ ✓
• Automatic Conveyances ✓ ✓ ✓
Floor Plans/Drawings:
• All floors (new and renovated) ✓ ✓ ✓
• Penthouse ✓ ✓ ✓
• Roof plan ✓ ✓ ✓
• Pipe basement ✓ ✓ ✓
• Pipe tunnel ✓ ✓
• Reflected ceiling4 ✓ ✓
• Equipment floor plans 1:50 (1/4 inch) scale5
• Demolition plans6 ✓ ✓
Room names and numbers7 ✓ ✓
Program net/designed net ✓ ✓ ✓
Exterior dimensions/total building gross area
Size and shape of all departmental functions and services9
Exterior building elevations10 ✓ ✓ ✓
Finish floor elevations11 ✓ ✓ ✓
Door locations, sizes, and swings ✓ ✓
Wall thickness and chase walls ✓ ✓
Tampa, FL 33612-4745 08/12/2023
Architectural: 30%* AE Self Conf irmation
DD** AE Self Conf irmation
Handrail location/dimensions ✓ ✓
Fixed equipment ✓ ✓
Equipment elevations and details ✓
Plumbing fixtures ✓ ✓
Wheelchair accessible facilities ✓ ✓
Wall sections12 ✓ ✓
Building sections13 ✓ ✓
Finish grades at corners, entrances, exits, platforms and ramps
Fire and smoke rated partitions14 ✓ ✓ ✓
Lead-lined and radio-frequency-shielded partitions14
Fire extinguisher cabinets14 ✓ ✓
Spray-on fire proofing (see fire protection)
Construction details15 ✓ ✓
Drafting symbols, abbreviations, and general notes
Door, window, and louver schedules ✓
Interior details, elevations, sections ✓
Finish schedule16 ✓ ✓
Graphics and signage17 ✓
Color rendering ✓
Specifications ✓ ✓
Lead abatement18 ✓
Lead abatement specification19 ✓
Tampa, FL 33612-4745 08/12/2023
* Submit, as a minimum, a single line layout for at a scale not less than 1:100 (1/8 inch). A scale of 1:200 (1/16 inch) is acceptable for architectural floor layout if an entire floor cannot be shown on one sheet. Submit a complete double line layout of areas of critical importance, at a scale of 1:50 (1/4 inch) including equipment.
** Submit minimum 1:100 (1/8 inch) scale floor plans, new and renovated, incorporating all of the revisions required by comments from schematics.
*** Submit fully dimensioned, complete, and coordinated 1:100 (1/8 inch) scale floor plans, incorporating all revisions
Architectural NOTES:
1. Use lines between spaces to indicate the centerline of the partition (for schematics only).
2. Indicate doors with a slash mark.
3. Along the corridor, the line shall represent the corridor side of the partition.
4. Indicate ceiling mounted equipment, lighting fixtures, air diffusers, registers, tracks, and other significant elements.
5. Identify all equipment for each room. Indicate and coordinate all equipment with the Equipment Guide List (Program Guide
7610) and Activated Equipment List. Use VA standard symbols and notation to distinguish between contractor-furnished and installed (CC), VA-furnished contractor-installed (VC), VA-furnished and installed (VV), VA-furnished with construction funds [VC(CF) and VV(CF)] and relocated (R)…