This Statement of Work outlines requirements for biennial maintenance on a Dual Point Davit system aboard the USCGC WAESCHE at U.S. Coast Guard Base Alameda, with work to be performed between March 24, 2025 and May 2, 2025, including sea trials on July 1, 2025. The scope includes maintenance on an Allied Systems Dual Point Davit (Model DDP11000CTS & SP2200) with a 29,000 lb total gross weight, located on the starboard side weather deck.
The contractor must provide a qualified technical representative from Allied Systems Company to oversee the maintenance work, which includes operational testing, hydraulic system maintenance, wire rope replacement, hook certification, power sheave assembly inspection, control panel servicing, NDE testing of weld joints and structures, weight testing, and preservation work. The work requires specific parts from Allied Systems Co. including element replacement kits, return filters, seal kits, filter breathers, tank cover gaskets, wire ropes, and hubs. Government-furnished property includes a Mark IV and two boat davit release hooks (Model APR-356-CBH). The contractor must perform both dockside testing and sea trials to demonstrate satisfactory operation of all systems, particularly the Constant Tension functions.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.
2. REFERENCES
COAST GUARD DRAWINGS
None.
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements
OTHER REFERENCES
None.
3. REQUIREMENTS
3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements of this WI apply to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Period of Performance. The period of performance for this work is 24MAR2025-02MAY2025, to include sea trials on 01JUL25
3.3 Location. The Contractor must perform the work while the USCGC WAESCHE is alongside the pier at U.S. Coast Guard Base Alameda, Coast Guard Island, Alameda CA 94501.
58300_RTK_1223_418
1. Dual Point Davit, Biennial Maintenance, Perform
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to perform Biennial Maintenance on Dual Point Davit listed in Table 1.
TABLE 1 – DUAL POINT DAVIT NAMEPLATE DATA
| description |
| LOCATION |
| davit total gross weight |
Allied Systems Dual Point Davit with Control Console Models: DDP11000CTS & SP2200
| Weather Deck, STBD Side, Frame 47 |
| 29,000 lbs. |
1.2 Government-furnished property.
| MTI |
| ITEM DESCRIPTION |
| NSN/PN |
| QTY |
| ESTIMATED COST ($/UNIT) |
| Y |
| CB-OTH Mark IV |
(Coast Guard Drawing 26B-CB-IV-801-001)
| N/A |
| 1 ea. |
| N/A |
| Y |
| HOOK, RELEASE, BOAT DAVIT |
| Model APR-356-CBH, NSN 4030-01-467-1005 |
| 2 ea. |
| 5000.00 |
2. REFERENCES
Coast Guard Drawings Coast Guard Drawing 418A-WMSL-100-001, Rev B, General Arrangements Coast Guard Drawing 418A-WMSL-801-001 Rev A, Booklet of General Plan Coast Guard Publications Coast Guard Technical Publication (TP) 9618, SWBS 583, Sept 2023, Boat Davit - Models DDP11000CTS & SP2200 (S/N: 2328-753, 2329-751, 2332-750) Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2022, Auxiliary Machine Systems Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures Other References International Maritime Organization (IMO) International Convention for the Safety of Life At Sea (SOLAS), 2009 as amended in 2010 and 2011 International Maritime Organization (IMO) International Life Saving Appliances Code (LSA), 2010 edition ANSI/EASA Standard AR100-2020, Recommended Practice for the Repair of Rotating Electrical Apparatus
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor must submit a CIR for the inspections listed in the following paragraph(s):
· 3.2 Biannual maintenance inspection and repair task particulars (Task #1 and #2)
· 3.2.1 Hook certification.
3.1.2 Tech Rep. The Contractor must provide the services of a Qualified Technical Representative who is familiar with the Dual Point Davit (i.e. Allied System Co. Model No. DDP11000CTS) to accomplish the following on site:
· Advise on manufacturer's proprietary system information.
· Ensure compliance with manufacturer's procedures and standards during system disassembly, inspection, repair, reassembly, and testing as applicable.
3.1.2.1 Ensure the Tech Rep has experience with the system/equipment stated above and demonstrated on their résumé.
3.1.2.2 Submit the name and résumé of the Tech Rep with the solicitation proposal.
3.1.2.3 Point of contact:
· Heath Munger or Gary Berglund
· Heath.munger@alliedsystems.com, Gary.Berglund@AlliedSystems.com
· Allied Systems Company
· (503) 825-3366
3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).
3.1.3.1 Protection of fine surfaces. The Contractor must protect all fine surfaces in accordance with SFLC Std. Spec 5000.
3.1.3.2 Hydraulic system contamination protection. The Contractor must maintain existing hydraulic cleanliness in accordance with SFLC Std. Spec 5000.
3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:
· Piping
· Electrical Cables Capstan Inspection Covers
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.1.5 Operational test, initial. Prior to commencement of work, the Contractor must witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR.
3.1.6 Materials. The Contractor must furnish and install parts listed in Table 2.
TABLE 2 – LIST OF PARTS
| QUANTITY |
| PART NUMBER |
| DESCRIPTION |
| SOURCE OF SUPPLY |
| 1 |
| 593533 |
| Kit, Element Replacement |
| Allied System Co. |
214 S.W. Oregon Street, Sherwood OR 97140
| 1 |
| 593532 |
| Kit, Element Replacement |
| 2 |
| 70196 |
| Return Filters |
| 2 |
| 74130 |
| Seal Kits |
| 2 |
| 71975 |
| Filter Breather |
| 1 |
| 71754 |
| Tank Cover Gasket |
| 2 |
| 71042 |
| Wire Rope |
| 2 |
| 73441 |
| Hub |
3.2 Biannual maintenance inspection and repair task particulars. The Contractor with Tech Rep support must perform the tasks designated in Table 3 below and Figure 1 in accordance with SFLC Std Spec 5000 and CG Tech Pub as applicable.
TABLE 3 – Recurring Maintenance task
ADDITION REQUIREMENTS
| # |
| TASK TYPE |
| QTY |
| COMPONENT OR ASSEMBLY |
| APPENDIX AND PARA. FROM SFLC STD 5000 |
| OTHER |
| 1 |
| Operate and Inspect |
| 1 |
| Dual Point Davit System |
| 3.2.1 (Operate and Inspect) Appendix A (General Inspection Requirements) |
| Submit CIR. |
| 2 |
| Hydraulic Lube Oil Analysis |
| 1 |
| Hydraulic System |
| C2.1.3.1 |
| Submit a CIR. |
| 3 |
| Service and Inspect |
| 1 |
| Hydraulic Winch Assembly (Constant Tension and Normal) which are powered by Main Hydraulic Pump/Motor Assembly (ST1) and Back Up powered by Emergency (ST2), Accumulators. |
| 3.2.2 (Service and Inspect) D2.3 (Brakes and clutches. D2.4 (Open gearing and gear reducers) |
| See Paragraph 3.3.1 |
Submit CFR.
| 4 |
| Disassemble and Inspect |
| 2 |
| Power Sheave Assembly |
| 3.2.3 (Disassemble and Inspect) |
| Renew the hubs |
If hubs are not available, clean, inspect, and reinstall hubs.
| 5 |
| Renew |
| 2 |
| Wire Rope Assembly |
(Allied System Part No. 71042)
| D2.2 (Wire rope assemblies) |
| Wire rope particulars: Nominal diameter: 5/8 inch |
Minimum Breaking Strength: 56,040 lbs.
Total length of each wire rope required: 110 ft.
End fitting type: Fiege. Submit a CFR.
| 6 |
| Service and Inspect |
| 1 |
| Control Panel |
| 3.2.2 (Service and Inspect) |
| Verify all mechanical and electrical signals to the control panel. Submit a CFR. |
| 7 |
| NDE |
| 1 |
| Dual Point Davit System |
| 3.2.5 (NDE) |
| Areas to NDE: all weld joints and boom and turret structures. |
Submit a CFR.
| 8 |
| Groom and Lubricate |
| 1 |
| Dual Point Davit System |
| 3.2.6 (Groom and Lubricate) |
| 9 |
| Weight Test |
| 1 |
| Dual Point Davit System |
| B2.7.2 (Dual Point Davits) |
B2.7.2.1 No-load Operational Test B2.7.2.2 Static Load Test B2.7.2.3 Winch/Brake/Modified static load Test B2.7.2.4 Dynamic Load Test B2.7.2.5 Rated Load test
Test weight particulars:
Working Load Limit (11,000 lb.).
"Modified static / brake" test load: 16,500 pounds (150% of WLL)
“Modified Dynamic Test Load: 12,650 pounds (115% of WLL)
| 10 |
| Electric Motors |
| 1 |
| Normal RIHB Boat Davit and Emergency RIHB Davit HPU Motors |
Perform Insulation Resistance Test in accordance with ANSI/EASA AR 100-2020.and Para 6.5.4.3 of TP 9618. Submit a CFR.
| 11 |
| Fabricate and Install |
| 1 |
| Label plate |
| B2.9 (Label Plates) |
| 12 |
| Partially Preserve |
| 1 |
| Dual Point Davit Assembly (including pedestal, foundation, and all previously/normally painted components or surfaces) |
| 3.2.4 (Partial Preservation) |
3.2.1 Hook certification. The Contractor with Tech Rep support must inspect the hooks and verify their certification. Submit a CIR. Hooks (i.e. P/N: Model APR-356-CBH) must be renewed at every 48 months with GFP. Renew hooks if certification is expired.
3.2.1.1 Mandatory Turn-in Item (MTI) removal. If required to be renewed, the Contractor must remove the existing MTI hooks and turn over to the COR.
3.3 Special requirements for various components. If a Change Request has been authorized for additional work on any of the components listed in Table 4 below, the Contractor must perform work in accordance with the corresponding Appendix or paragraph of SFLC Std Spec 5000.
TABLE 4 - SPECIAL REQUIREMENTS
| Component |
| Appendix & Paragraph in sflc std spec 5000 |
| Fluids |
| C2.1 |
| Hose assemblies |
| C2.2 |
| Piping and tubing |
| C2.3 |
| Valves and manifolds |
| C2.4 |
| Gages |
| C2.5 |
| Gas charged accumulators |
| C2.6 |
| Heat exchangers and fluid coolers |
| C2.7 |
| Systems |
| C2.8 |
| Fastener assemblies |
| D2.1 |
| Wire rope assemblies |
| D2.2 |
| Brakes and clutches |
| D2.3 |
| Open gearing and gear reducers |
| D2.4 |
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.3.1 Perform adjustment and calibration IAW Tech Pub 9618 for Main System Relief Pressure, Counterbalance Valves, Anti-2-block Assembly, Constant Tension Winch Pressure Adjustments.
3.4 Operational test, post repairs. After completion of work, the Contractor must thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR.
3.4.1 The Contractor with Tech Rep support must perform a dockside test, consisting of launching the GFP boat to test Constant Tension Function, Wire Rope Tension, CT Select Button, Control function, CT Engage, Brake Release etc. Submit a CFR.
3.5 Touch-up preservation. The Contractor must prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with SFLC Std Spec 6310. Abide by all touch-up requirements outlined in SFLC Std Spec 6310.
NOTE
Government will provide 72 Hours of advance notice to the Contractor for sea trial support by the Tech Rep.
3.6 Sea trial. The Contractor must provide Tech Rep support to test operational capability of the Dual Point Davit with GFP in accordance with TP. Estimated time for sea trial is eight hours. Perform an at sea test launching the GFP boat to test Constant Tension Function, Wire Rope Tension, CT Select Button, Control function, CT Engage, Brake Release etc. Ensure all functions are in satisfactory operating conditions. Submit a CFR.
4. NOTES