SOW 548-23-128.pdf
PDF 434 KB Posted
- Attached to
- C1DA--FY23: NRM Tier 2 (PROJ: 548-23-128) AE Replace Boilers and Associated Infrastructure
- Solicitation number
- 36C24823R0088
About this file
This pre-solicitation notice seeks standard form 330 submissions from architectural and engineering firms for design services related to replacing boilers and associated infrastructure at the West Palm Beach VA Medical Center. Firms must have experience designing boiler systems, mechanical, electrical, and other engineering components. The project has a construction value over $10 million and utilizes full design-bid-build procurement. The selection process will evaluate firms based on qualifications, past performance, experience designing similar projects, and other factors. The notice specifies submission requirements and states that at least three highly qualified firms will be invited for discussions. Only service-disabled veteran-owned small businesses will be considered for this 100% set-aside project. The final selected firm will provide design services with construction period support.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Award Notice 23R0088.pdf | ||
| 36C24823R0088 0001.pdf | ||
| PPQ.pdf | ||
| 36C24823R0088.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A-E Scope of Work
Project Title: Replace Boilers & Associated Infrastructure Project Number: 548-23-128
Table of Contents
1. Overview ……………………………………………………………………………………………..
1.1 Introduction/Project Intent ..…………………………………………………..
2. General Scope..……………………………………………………………………………………..
2.1 Design Disciplines/Services………………………………………………………
2.2 Site Investigation……………………………………………………………………..
2.3 Surveys…………………………………………………………………………………….
2.4 Subsurface Conditions……………………………………………………………..
2.5 Phraseology…………………………………………………………………………….
2.6 Codes, Standards and Executive Orders…………………………………..
2.7 Quality Control……………………………………………………………………….
3. General Submission Services………………………………………………………………..
3.1 Review Aids…………………………………………………………………………….
3.2 Drawings…………………………………………………………………………………
3.3 Estimate Submission Requirements………………………………………..
3.4 Proposed Phasing and Construction Schedule…………………………
3.5 Specifications………………………………………………………………………….
3.6 Design Site Visit, Meetings/Conferences and Discussions……….
3.7 Infection Control Risk Assessment & Interim Life Safety…………
4. Design Schedule…………………………………………………………………………………..
5. Submission Requirements……………………………………………………………………
5.1 First Review……………………………………………………………………………
5.2 Second thru 100% Review……………………………………………………..
5.3 Final Submission…………………………………………………………………….
6. Construction Period Services……………………………………………………………….
6.1 General…………………………………………………………………………………..
6.2 Value Engineer………………………………………………………………………..
6.3 Errors and Omissions…………………………………………………………….
Appendix A – Review Aids……………………………………………………………………..
Appendix B – Basis of Design ……………………………………………………………………… Appendix C – Hazardous Material ………………………………………………………………
1. Overview
1.1 Introduction/Project Intent
Project description: This RFP is intended to facilitate a design, bid, build (DBB) Guaranteed Maximum Price contract that facilitates the replacement of the existing boiler assemblies and the associated infrastructure to include steam/water piping, electrical, ducting, and controller sub-systems.
Phases of A/E Services: A/E shall provide the services indicated. These services will be provided in distinct phases/schematics – Preliminary User Group Meetings & Field Surveys – first review submission – “DD 1” Design Development
30% Submittal –“DD 2” Design Development
60% Submittal – “CD” Construction Documents 90% Submittal – “CD” Construction Documents 100% Submittal – Bid [Final] Documents Construction Period Services Project Close Out Submittal – “As-Built” Construction Documents
2. General Scope
2.1 Design Disciplines/Services: A/E shall engage the services of all consultants in each discipline deemed to be necessary to fulfill the requirements of the project plan. The following are the minimal expected disciplines to be used for this scope of work. A-E may include additional services which should be identified during proposal submission:
The purpose of this statement is to provide a detail scope for the replacement of the VA Health Care Facility West Palm Beach (VAHCS WPB) boiler systems. The A/E shall provide the necessary expertise to develop a response package inclusive of the design of this system which complies with the applicable requirements for all deliverables as described in the VAHCS design guides. They include but may not be limited to the following:
i. VAHCS Steam, Heating Hot Water & Outside Distribution Systems Design Manual (Volumes 1-3)
ii. PG 18-10 Plumbing Design Manual
iii. VAHCS HVAC Design & Construction Procedures Manual PG 18-3
iv. VAHCS Program Guide PG-18-15, Volume E, for A/E Submission Instructions for Design Build
Projects
The design shall include all necessary plans, specifications, and corroborating documentation for the work detailed below. It shall include but may not be limited to the following:
1. Demolition of the existing boiler assemblies and component sub-systems to include:
a. Condenser tanks
b. Deaeration tanks as required to include all associated components
c. All component pump systems
d. All component pipe systems (steam/water/fuel/condensate)
e. Piping infrastructure, supports, insulation, stands, values, traps, & fittings
f. Flue systems, stacks, ducting, & economizers
g. Component control sub-systems
h. Primary & cadet pressure relief valve systems
i. Electrical systems, conduits, wiring, switches, breakers, conductors & panels
j. Decommissioning of existing SCADA system and all component features
2. Installation of (3) new boiler assemblies to include:
a. Component tanks
b. New deaeration tanks as required to include all associated components
c. Install new condensate recovery systems and associated controls, safety devices, flash tanks and transfer pumps
d. Component pump sub-assemblies
e. Component pipe systems (steam/water/fuel/condensate) and all associated components
i. Install pipe systems from source to header
f. Piping infrastructure, supports, insulation, stands, values, traps, fittings
g. Flue systems, stacks, ducting, & economizers
i. Dedicated exhaust per boiler unit
h. Component control sub-systems
i. Primary & cadet pressure relief valve systems
j. Component ventilation and combustive air fans/dampers
k. DDC control & metering sensors
i. To include integration into the facility building automation system (BAS)
l. Testing and Balancing
m. Commissioning of all systems outlined herein
n. Provide new SCADA and control sub-systems for each boiler
i. All new control panels and graphic shall be installed in a location designated by VAHCS Energy Plant personnel
ii. Integrate into existing building automation system
o. Water softener sub-system for boiler supply lines
p. Installation of new exhaust fan sub-systems
3. Replacement of all component parts, conduits, fittings, and wiring of the existing boiler electrical system to include:
a. Breakers
b. Circuits
c. Switches
d. Conductors
4. Installation of requisite mechanical sub-systems and accoutrements needed to support boiler operations
5. The A/E shall evaluate the current load demand of the existing steam generating system to determine replacement and/or upgrade requirements to facilitate improved efficiency and future expansion capability.
6. Provide (3) temporary back-up boiler units to include:
a. Mobilization/Demobilization
b. Integration into the facility hot water system
7. The performance period for this work is (180) days.
1. Demolition: The project demolition work may include structural, architectural, plumbing, mechanical and electrical demolition to clear space for the new systems. The minor demolition of existing landscaping and other items shall be included in this project.
2. Civil/Structural: Work may include architectural modification and structural work. Structural engineering is expected to be completed by a Florida Licensed Structural Engineer for any needed structural reinforcements. All required borings and structural testing shall be completed by the A/E firm.
The A/E firm shall proceed with a structural design that will not impede on pedestrian traffic at the ground level.
3. Architectural: Field verification of elevations and architectural dimensions are crucial to the success of this project, as the existing drawings are best represented. Exterior work must blend into the surrounding buildings and architectural appearances. Patient and Family Centered Care concepts are to be included in the design of this project. These concepts are outlined in the VA technical information library design guide documents. See paragraph I.D.2 for additional information.
4. Plumbing/Piping: The plumbing systems need to be evaluated and updated to meet the latest Plumbing Codes. Design modifications, additions and relocations to the plumbing systems and fire protection system must follow the VISN 8 policy and Life Safety codes and other applicable code requirements for a complete certified functional system.
5. Heating, Ventilation and Air Conditioning (HVAC): The HVAC systems need to be evaluated and updated to meet the latest HVAC Design Criteria. The A/E must evaluate the Chilled Water System and the Hot Water / Steam System serving the design scope area.
6. Electrical: The electrical systems need to be evaluated and updated to meet the latest Design Criteria. The
A/E must evaluate the electrical systems serving the design scope area to determine if there is enough, and provide modifications and extensions to the existing electrical systems, security system, communications system, fire / safety system, etc. All panels shall be metered before any planned connection to insure available capacity. This required metering will be the responsibility of the A/E firm to complete. This design shall evaluate existing As–Built drawings and all ongoing electrical upgrade projects during the design process.
7. Life Safety: In addition to in house staffing, an independent third part life safety expert must review design to ensure it meets current life safety requirements
8. Fire Protection Engineer: The VA requires that all spaces shall be 100% sprinkled throughout the facility. The A/E shall have a fire protection engineer on staff to review and approval stamp the design/build fire protection system in the project as necessary.
9. Special Systems and Equipment: The design will include all special systems and equipment associated with the functions of the space. The A/E shall be required to coordinate the design work directly with the suppliers/ manufacturers of the new equipment and existing to produce a completely designed operational project. All drawings, schematics, and other data available from the equipment suppliers shall be incorporated in the A/E drawings and specifications. The design shall address special systems including but not limited to elevators, fire alarm, telecommunications, security (card access/CCTV), medical gas monitoring, public address, and nurse call systems. Any new building or renovated space must tie into the existing fire alarm system at the facility.
11. Environmental (NEPA The VA is required by the National Environmental Policy Act (NEPA) (32 CFR Part
651) to evaluate and document potential environmental impacts of all federal actions occurring at the VA Hospital or any of its outlying clinics. The VA requires the services of a professional and technical support in meeting these mission requirements to support the implementation of NEPA. The contractor shall provide the level of experience necessary to complete these tasks. Relevant work experience includes knowledge of Federal environmental laws and regulations including NEPA, 32 CFR Part 651, AR 200-1, ESA, NHPA, CAA, CWA, and Sikes Act; computer proficiency in MS Office and ESRI ArcGIS; NEPA technical support and excellent communication skills.
10. Energy & Resource Conservation: Any alterations or new equipment (motors, light fixtures, windows, HVAC equipment, pumps, chillers, water faucets, urinals, toilets, insulation, etc.) shall be energy efficient and resource efficient. This facility’s overall energy usage goal is 142,000 BTU/sq. ft. (142 MBTU/SF).
Energy Star, LEEDS and other related criteria shall be utilized. Light bulbs and other equipment shall have very low mercury content or NOT contain mercury at all.
11. Hazardous Material: See Appendix C
2.2 Site Investigation:
1. A physical survey of the site shall be conducted.
2. Any available information relative to existing conditions at the site of the construction will be furnished to the A-E who (unless fee negotiations establish otherwise) will evaluate and verify such information and make field measurements and investigations as necessary to prepare adequate construction drawings and specifications
3. The A-E is required to conduct destructive investigation as necessary to minimize deferring site conditions.
Penetrations for visible access into walls, hard ceiling, chases and other locations are the responsibility of the A-E and shall be coordinated with COR. A-E will be responsible to create openings in hard ceiling, openings in walls and openings in chases and other areas. This should be established as a unit price.
Locations should be coordinated with COR and ICRA/ILSM practices must be coordinated with COR. A- E is required to repair openings back to original fire code requirements within 48 hours.
2.3 SURVEYS:
1. Survey: Complete survey and evaluation of the West Palm Beach Boiler Plant and all associated equipment associated with steam production inside the “Boiler Plant”.
Survey to include but not limited to the following. Survey Template examples are included and may be utilized during the survey. Survey to be completed within 30 days of NTP
Compressed Air System Condensate Storage Tank Water Treatment Feedwater Deaerator Boiler Feed Pumps Fuel Oil Pump Condensate Transfer Pumps Fuel Oil Tanks Boiler Feed Piping Fuel Gas Piping System Boilers Water Softeners/RO/De-Alkalizer Instrumentation and Monitoring Sys Economizers / Stacks / Breeching / Chimney Blowoff Tank and BO Piping Steam Piping / Condensate Piping Burner Management and Interlocks Combustion Control System Burners Feedwater Deaerator Combustion Control System
2.4 PHRASEOLOGY: The following instructions that relate to common errors in phrasing have evolved from the VA’s experience with A&E specifications:
1. Under “Requirements”, do not use the phrase "the work consists of" – instead use the phrase "the work includes". Drawings should show scope if necessary to list certain parts.
2. In lieu of reference to the accompanying drawings or the Contracting Officer, use the words "as shown", "as indicated", "as detailed" or "as approved", "as directed", "as permitted" - do NOT use the words "as shown on drawings" or "as approved by the Contracting Officer". That clause of the Contract Clauses entitled “Specifications and Drawings for Construction” defines the meaning of these and similar terms.
3. Do NOT use the expression "to satisfaction of the Contracting Officer" or "satisfactory to the Contracting Officer". The contract states specifically that all work must meet the approval of the Contracting Officer.
4. There are two parties to the contract - (1) the Government, represented by the Contracting Officer and (2) the Contractor. Therefore, do NOT use such expressions as "subject to the approval of the architect", "when in the opinion of the architect", "this contractor", "masonry contractor", or "subcontractor". Do not use the term "owner" - use the term "Government".
5. Do NOT use etc.; the term is too imprecise for bidding and inspection purposes.
6. The use of the expression "as indicated on the drawings" is very seldom necessary; the fact that a detail is on the drawings makes it unnecessary to mention it in the specification. If the expression is used and the item is not shown, the contractor is not required to provide it.
7. Do NOT use expressions such as "The work required shall include, unless stated specifically otherwise, the provision of all materials for the installation of all concrete, including reinforcement necessary to the construction and completion of the work per the drawings, the specifications, and the intent thereof". Since the drawings indicate clearly the exact limitations of the several classes of work, defining the limits of work within the specifications is superfluous and may be contradictory by failure to mention something shown clearly and intended to be included.
8. Minimize the use of cross-references and in NO case use paragraph numbers for this purpose. If necessary to refer to a particular paragraph, do so by its title and the section number and title under which it is to be found. Cross -references of the following type are totally unnecessary - "Painting of the woodwork is covered under "'Painting'" or "painting is specified hereinafter". i. Do NOT place upon the contractor the responsibility for the possible inaccuracy of, or the lack of, information on the part of the Government; e.g., never use sentences similar to "although the drawings indicate approximately the conditions that are likely to be found, bidders should satisfy themselves as to the actual conditions, for while they are believed to be shown, the Government does not guarantee the accuracy of the information given and the bidder shall assume all responsibility in the use of such". Remember that the Government is responsible for the accuracy and sufficiency of the information it gives to bidders or contractors and the A&E is in turn responsible to the Government for that same information. It will be necessary to establish in the project specification a definite basis of bid. For example, on a roof rehabilitation project where the extent of defective construction is unknown, the specification shall set forth, as a basis of bid, a definite amount of work to be performed and provide for adjustment per the Contract Clauses if the extent of work varies from the amount stated under the basis of bid.
9. Do not include warranties in technical sections unless they are for more than one year, and generally not unless they are included in the NAVFAC guide specification. A one-year warranty is covered in the Contract Clauses.
10. Do NOT set up a paragraph in the various sections entitled “Work not Included”. Specify the work that is included under the respective sections.
11. Specifications should clearly delineate equipment, ducts and piping systems that are required to be insulated. The phrase "insulating all ducts except in conditioned spaces" has resulted in differences of opinion and claim situations; also, all duct systems should be appropriately designated as supply, exhaust, fresh air intake, or return to further clarify insulating requirements.
2.5 Codes, Standards and Executive Orders:
1. The Public Buildings Amendment Act of 1988, Public Law (Pub. L.) 100-678 requires Federal agencies to follow national recognized "model" building codes. The VA has adopted the latest edition of the following codes and standards as a minimum for all projects performed in the modernization, alteration, addition, or improvement of its real property and the construction of new structures. The VA design Manuals and Master Specifications specify other codes and standards that VA follows on its projects:
i. VA Directives, Design Manuals, Master Specifications, VA National CAD Standard Application Guide, and other Guidance on the Technical Information Library (TIL) (http://www.cfm.va.gov/til/).
ii. International Building Code (IBC) including International Mechanical and Plumbing Codes
iii. NFPA 101 Life Safety Code (see notes below)
iv. NFPA National Fire Codes with the exception of NFPA 5000 and NFPA 900.
v. Occupational, Safety and Health Administration (OSHA) Standards
vi. VA Seismic Design Requirements, H-18-8
vii. National Electrical Code (NEC)
viii. National Standard Plumbing Code (NSPC)
ix. Safety Code for Elevators and Escalators, American Society of Mechanical Engineers
(ASME) A 17.1.
x. ASME Boiler and Pressure Vessel Code
xi. ASME Code for Pressure Piping
xii. Architectural Barriers Act (ABA) including VA Supplement, Barrier Free Design
xiii. Building Code Requirements for Reinforced Concrete, American Concrete Institute and Commentary (ACI 318)
xiv. Manual of Steel Construction, Load and Resistance Factor Design Specifications for Structural Steel Buildings, American Institute of Steel Construction (AISC)
xv. Energy Policy Act of 2005 (EPAct)
xvi. American Society of Heating and Refrigeration Engineers (ASHRAE) 90.1, Energy
Standards for Buildings Except Low-Rise Residential Buildings
xvii. Federal Leadership in High Performance and Sustainable Buildings: Memorandum of
Understanding (MOU)
xviii. Executive Order 13423: Strengthening Federal Environmental, Energy, and
Transportation Management
xix. Executive Order 13514: Federal Leadership in Environmental, Energy, and Economic
Performance
xx. The Provisions for Construction and Safety Signs. Stated in the General Requirements, Section 01 00 00, of the VA Construction Specifications
xxi. American Society of Heating and Refrigeration Engineers (ASHRAE), Ventilation for
Acceptable Indoor Air Quality – ASHRAE Standard 62.1
xxii. Safety Standard for Refrigeration Systems – ASHRAE Standard 15
2. Additional Notes: NFPA 101 primarily addresses life safety and fire protection features while the IBC addresses a wide range of considerations, including, but not limited to, structural strength, stability, sanitation, adequate light and ventilation, and energy conservation. VA buildings must meet the requirements of NFPA 101 and documents referenced by NFPA 101 in order to comply with the accreditation requirements of the joint Commission. Therefore, designs shall comply with the requirements of the latest edition of NFPA 101 and documents referenced therein. Design features not addressed by NFPA 101 or documents referenced therein shall comply with the requirements of the latest edition of the IBC or as otherwise addressed above in this Program Guide. For design features that are addressed by both the IBC as well as NFPA 101 or a document referenced by NFPA 101, the requirements of NFPA 101 or the document referenced by NFPA 101 shall be used exclusively. This applies even if the IBC requirements are different.
3. Conflicts between Nationally Recognized Codes and Standards and VA Requirements: Should a conflict exist between VA requirements and VA adopted nationally recognized codes and standards, the conflict shall be brought to the attention of the VA. The resolution of the conflict shall be made by the authority having jurisdiction for the VA to ensure a consistency system wide.
4. Design Deviations from VA Standards When proposing a variation, deliver a written request to the Contracting Officer who will render decision after discussing with COR. Documentation will include the nature and features of the variation and why the variation is desirable and beneficial to the Government. If lower cost is a benefit, also include a high magnitude cost comparison.
2.7 Quality Control
1. Quality Control Plan: The A/E shall prepare a Quality Control Plan (QCP) which includes the following as a minimum:
Identification and discussion of all organizational and technical interfaces Design team members and their areas of responsibility Team members responsible for checking the design Team members responsible for checking the electronic files Team members responsible for reviewing and submitting the required VA Design Alerts and Quality
Alerts Project Schedule showing key milestones and review periods
2. VA Design Alerts and VA Quality Alerts can be found on the internet at http://www.cfm.va.gov/TIL/ .
3. Quality Assurance: The A/E is responsible for developing and performing quality assurance reviews of all work to confirm that proper criteria, regulations, laws, codes, principles and professional procedures have been used. This includes work performed by subcontractors. The VA shall review all project submissions but this review is general in nature and should not be considered as part of the A/E’s Quality Control Plan and/or Quality Assurance.
4. Quality Certification: The A/E shall certify at each submission in writing that he/she has performed quality assurance reviews of that submission.
3. General Submission Services
3.1 Review Aids: A/E will complete the review aids in Appendix A for each submission to aid the A/E and the COR in ensuring project design level is at appropriate level:
3.2 Drawings:
1. The A/E shall provide electronic copies of drawings at each review step generated in the latest version of AutoCAD or its companion products (digitally signed DWGs) and PDF format in individual sheet files on
CD-ROM. Drawing AutoCAD version must be compatible with current facility version AutoCAD.
Include all associated support files (i.e. plot styles, external referenced files, etc.). The standard drawing size shall be ARCH E1 (30” x 42”). The format to be used in creating the CAD drawings (i.e. layer / level structure, fonts, font sizing, file naming conventions, etc.) is that of the latest edition of the National CAD Standard (www.nationalcadstandard.org).
a. The A/E shall follow these level / layer formats, file – naming conventions, and symbol library.
b. Drawings are to be drawn from the VA’s “As-Built” or construction drawings updated by site verification, not scanned reproductions.
c. The final sets of the new construction drawings, including the film copies, shall be sealed (embossed & ink stamps) and signed by each respective Professional Engineer in their discipline, Industrial Hygienist, Architect and other necessary licensed professional consultants.
2. The A/E shall proved electronic copies of drawings at each review step generated in BIM format and following VA BIM Guidelines: https://www.cfm.va.gov/til/projReq.asp
3.3 Estimate Submission Requirements:
1. The A/E shall submit a construction cost estimate from an independent firm for all trade disciplines at each and every project submission in detail as described in Appendix A. This estimate shall reflect the impact of the planned acquisition strategy provided by the COR. The level of detail for this estimate shall be consistent with the degree of completeness of the drawings being submitted. Therefore, if it is shown, it must be priced. If it is shown in detail, it must be priced in detail. For detailed elements, "lump sum" or "allowance" figures will not be acceptable. Building gross area computations shall be included with each estimate. Estimates shall be broken down by AIA divisions. The first page will be a summary page showing deductive bid items, contractor mark-ups, overhead, profit, special insurance, and bonding to reflect true construction costs. The breakdown shall reflect Bid Items 1, 2, 3….. separately; then in aggregate. All construction cost estimates shall conform to the requirements contained in VA Manual for Preparation of Cost Estimates (latest edition). Manual is available on the internet at http://www.cfm.va.gov/cost/
2. THE A/E IS RESPONSIBLE FOR ESTABLISHING INTERNAL CONTROLS FOR KEEPING THE
PROJECT DESIGN WITHIN PROJECTED CONSTRUCTION FUNDING. THE A/E WILL BE
REQUIRED TO REVISE DESIGN AND RESUBMIT COST ESTIMATES AS NECESSARY (AT NO
COST TO THE VA) SHOULD COST ESTIMATES EXCEED CONSTRUCTION FUNDING. Bid Deducts are not to be considered in maintaining the budget – they are intended to support unexpected variables in bidding, not in up front design. See 52.236-22 DESIGN WITHIN FUNDING LIMITATIONS for additional information.
3. The A/E shall design the project in such a manner that the base bid shall include the sum total of the work.
However, there must be deducting alternate bid items. The deducting alternative bid items shall have a goal of equaling 20% of the proposed construction budget. The resulting project must still be a viable project if all alternatives are deducted from the construction project. No matter which option is selected, the hospital must continue to function during construction.
3.4 Proposed Phasing and Construction Schedule:
1. Proposed Construction Schedule: The A/E shall prepare a proposed schedule for construction that is consistent with the project construction cost estimate. During development of this schedule, due consideration will be given to standard construction practices, durations of tasks, the sequence of construction, procurement of materials, climatic conditions, etc.
2. Phasing –It is planned that areas in and adjacent to the proposed construction area shall be occupied during construction. The A/E shall develop a minimum of 3 phasing plans and base line comparison of no phasing in project at Conceptual submission. The comparison shall include description, bubble drawing presentation, impact on budget, impact on timeline, impact to maintain VA standards during each phase
(for example will HVAC be maintained at VA standards in the occupied areas), impact on life safety and emergency egress and all other known pros and cons for each phase. A/E shall modify based on any follow up questions. VA will select one alternative within 14 days of final presentation.
3. A/E is responsible to discuss phasing at all design submission meetings. Identification of potential construction task that would minimize disruptions if performed off hours and weekends shall be included along with identification of major utility interruptions.
3.5 Specifications:
1. General: The A/E shall utilize the latest edition of VA Master Specifications as revised and provided by the facility supplemented by the VA Office of Construction and Facilities Management Master Specifications as needed. The VA retains no responsibility for the development or preparation of any specification. While it is recognized that certain Divisions and/or Sections will require significant input from the VA, the A/E retains overall responsibility for these Sections.
2. Electronic Files: All files shall be IBM compatible and furnished on high quality CD-R disks. Provide in accordance with Supplement “B” sets of specifications (MS Word). The computerized version, format and media of the computer disks and files shall be specified and verified by the VA Project Engineer at the time each submission is due (ZIP files are not acceptable). Provide durable high quality plastic storage boxes at each submission for long term archiving of the disks.
3. Outline Specifications: The A/E shall develop an outline specification listing the proposed guide specifications and the A/E prepared sections that will be used for the project. The outline specification will list the guide specification number and title for each proposed section. Sections shall be arranged within their respective divisions, in numerical order. New specification sections, developed by the A/E, will be numbered to fall in their respective division at a logical location.
4. Editing Specifications: The A/E must thoroughly edit and adapt the Specifications to satisfy the project requirements and provide a complete set of construction specifications. The A/E shall notify the VA in writing should there be instances where there are no appropriate Master Specifications available for use. At the VA’s direction the required specifications will be prepared by the A/E. These specifications shall list the essential features, functions, and other factors to clearly indicate the type and quantity of items/work required. All specifications will be prepared by listing parameters and requirements that can be met by several manufacturers.
5. Construction Contractor Submittal Register: The specifications require the construction contractor to submit shop drawings, samples, manufacturer’s data, certificates, test reports, and other items to the Government. The A/E shall prepare a complete listing of construction contractor submittal requirements on an Excel Spreadsheet. The spreadsheet shall have a separate line for each required submittal and separate columns for Division, Section, and type of submittal (catalog cut, sample, etc).
3.6 Design Site Visits, Meetings/Conferences, and Discussions
1. Site Visits: The A/E shall perform design site visits as required to accomplish the scope of this project.
The purpose of these visits is to further define project requirements, observe and evaluate existing field conditions, review any existing documentation, conduct required design meetings, and to gather supplemental site data necessary for performing the design. Reports summarizing the conditions observed, personnel contacted, and data gathered during the visits shall be prepared and included in the Design Development Documentation.
2. Design Review Conferences: Design review conferences shall conduct shortly following the issuance of each review Submission. Refer to Supplement B for the proposed schedule but will typically take place two weeks after the submission date. Design review conferences for the Schematics, Design Development and Construction Document Development phase shall include the A/E Project Manager/Senior Designer.
These conferences shall take place at the facilities where the work is being performed.
3. Site Visit and Meeting Minutes: The A/E shall take notes and prepare minutes for all site visits, meetings and conferences attended during design. Minutes will be prepared in typed form, signed by the A/E Project Manager, and furnished to project engineer within seven calendar days after the meeting/conference for concurrence and distribution to attendees. Copies of all meeting/conference minutes will be included in each Submission. Minutes shall include all request for changes by VA. If change is unable to be made, explanation of why shall be provided.
3.7 Infection Control Risk Assessment (ICRA) & Interim Life Safety Measures Evaluations (ILSM) .
1. ICRA - The A/E Firm will be responsible to work with the VA COR / Safety Department / and Infection Prevention to develop the “Construction Safety, Infection Prevention and Control Risk Assessment”, as required by VHA Directive 7715 “SAFETY AND HEALTH DURING CONSTRUCTION” The A/E will be given blank Risk Assessment forms to be completed and will allow for review and discussion at each design phase of the project. If the design has multiple phases, or work performed in multiple areas, a separate Assessment needs to be completed for each phase or area. These forms will be included in the specifications and are a part of the design submission requirements.
2. ILSM - The A/E firm will be responsible to identify areas in their design that will require Interim Life Safety Measures in accordance with the latest - The Joint Commission (TJC) Hospital Standard LS.01.02.01.
The A/E will clearly define areas requiring Interim Life Safety Measures and the necessary precautions needed. Along with the requirement for Interim Life Safety Measures, the A/E will work with the COR and Safety Department to identify the needs, as well as identify the responsibilities of the Interim Life Safety Measures. These will be clearly defined in both the Specifications and on the Drawings.
4. Design Schedule:
Design schedules shall be submitted to the VA as an 11x17 Microsoft Projects file at the beginning of the Notice to Proceed, with each invoice for payment and shall never be more than 4 weeks old. Time frames below are calendar days. Any requested adjustment to timeline shall be submitted to Contracting in writing:
xxiii. Schematics
xxiv. Begin Design Development (Notice to Proceed): NTP
xxv. First Submission of Design Development (DD1–Schematics): NTP + 28 Days
xxvi. First Review Meeting and Return First Submission: NTP + 42 Days
xxvii. Second Submission (Final Design Development) (DD2–30%): NTP + 84 Days xxviii. Second Review Meeting and Return Second Submission: NTP + 98 Days
xxix. End of Design Development “DD”
xxx. Contract Document Stage “CD”
xxxi. Begin Contract Document Stage: NTP + 99 Days
xxxii. Third Submission Contract Documents (CD1-6560%): NTP + 133 Days xxxiii. Third Review Meeting and Return Third Submission: NTP + 147 Days
xxxiv. Fourth Submission Contract Documents (CD2-95%): NTP + 175 Days
xxxv. Fourth Review Meeting and Return Fourth Submission: NTP + 189 Days
xxxvi. Fifth Submission (Deliver Final Contract Documents) (CD3-100%): NTP + 203 Days xxxvii. Fifth Review Meeting and Return Fifth Submission: NTP + 217 Days xxxviii. Final design submission: NTP +224 Days
5. Submission requirements
5.1 First Review: Schematic (DD1) – Roughly 10 - 15% complete.
1. Submittals: Three (3) copies of the complete package in 3 separate binders. Each section other than drawings shall be in binder and each section identified by individual tab allowing for easy separation of package by VA if desired to expedite reviews. Drawings shall consist of 1 full size and 2 half size.
Provide electronic copies of the entire submission on one (1) CD-ROM with each section as separate file.
2. All Disciplines: Follow Appendix A
3. Specifications: In addition to Appendix A, submit a cover letter and a list of VA master specifications intended for use on this project.
4. Drawings: In addition to Appendix A, the A/E shall provide a full list of project drawings showing the scope and plan for each discipline involved.
5. Phasing: Follow Section 3.2.2
6. Acceptance: If the documents do not meet all of the requirements of this submission, then the portions of the documents that are not acceptable by the VA according to the design standards and criteria must be updated by the A/E prior to moving on to the next scheduled submission. Government acceptance does not relieve the Design of Record of their responsibility for the accuracy of the design documents.
5.2 Second thru 100% review:
1. Submittals: Three (3) copies of the complete package in 3 separate binders. Each section other than drawings shall be in binder and each section identified by individual tab allowing for easy separation of package by VA if desired to expedite reviews. Drawings shall consist of 1 full size and 2 half size.
Provide electronic copies of the entire submission on one (1) CD-ROM with each section as separate file.
2. Follow requirements of Appendix A in addition to the following:
i. Previous meeting minutes: Include all minutes from previous meetings.
ii. Site Drawing (if applicable): Ensure drawings show parking and material staging areas of this project. Area shall be balance of reasonable expectation of needed space to perform work and facility situation of limited parking
iii. Phasing: Ensure agreed upon phasing plan is presented at all meetings. Present any additional details developed throughout the process. Include narrative in submission.
iv. 100% Submission only: Certified Independent Third-Party Safety Professional Review must be completed and a letter with comments submitted with this submission.
v. Acceptance: If the documents do not meet all of the requirements of this submission, then the portions of the documents that are not acceptable by the VA according to the design standards and criteria must be updated by the A/E prior to moving on to the next scheduled submission.
Government acceptance does not relieve the Design of Record of their responsibility for the accuracy of the design documents.
5.3 Final Submission: After material of the Fourth Review has been reviewed, the A/E shall make necessary changes to incorporate all review comments (VA, CITP Safety Review, etc.) and furnish the following:
1. Specifications: Six (6) copies of the edited specifications double-sided in loose-leaf form ready for photocopying. One copy in a 3-ring binder, labeled. Format to be as stated earlier under “Specifications.”
2. Drawings: The drawings shall be 100% complete in every respect. Provide six (6) complete sets of drawings, three (3) full-size prints and three (3) half-size prints. Also provide two (2) electronic copies of the drawings in accordance with section I.D.6.
i. Provide one sealed set of original film drawings. Each discipline shall be separately sealed.
ii. Provide all calculations for the project including, but not limited to, architectural, structural, plumbing, mechanical, and electrical.
iii. Provide two (2) CD-ROMs with all project materials, including drawings, specifications, and calculations.
6. Construction Period Services (CPS):
6.1 – General CPA Services shall include, but are not limited to, generation of baseline submittal schedule, review and approval of construction submittals covering products that have been listed within the contract documents and contractor substitutions, manufacturer’s data/performance sheets, samples, shop drawings, schedules, phasing plans.
Compatibility analyses of different materials and recommendations associated with acceptance or rejection of alternate materials and products. Responses to Request for Information (RFI); change order review and recommendations; preparation of cost estimates to Request for Proposal (RFP); cost/time/impact estimates and recommendations relevant to design omissions and construction plan deviations. The VA reserves the right for final approval/disapproval on all RFIs, submittals, change orders and contractor estimate.
1. RFIs: Maintain Log including VA final approval. Review and respond to all design related RFI’s within (7) calendar days.
2. Submittals: Maintain log including VA final approval. Review all submittals for the project within (14) calendar days
3. Change Orders: The A/E shall review, evaluate, and respond to all contractor change order requests and value engineering proposals
4. Site visits: documentation of all necessary site visits to the VA Project Engineer within one (1) week after the visit
i. The A/E must also attend the pre bid conference prior to construction
ii. A/E to attend weekly Construction meeting with VA and Construction Contractor’
iii. The A/E must conduct one site visit per month during construction.
iv. The A/E must attend the close out punch list after construction of each phase is complete.
5. At project completion, the A/E must verify as built conditions from contractor supplied marked up prints and furnish two (2) updated sets of prints / record drawings (one set to be film), and two (2) electronic copies in accordance with section I.D.6.
6. ASBESTOS – See Appendix C
7. The A/E to perform/witness commissioning of the building systems.
6.2 Hazardous Materials – See Appendix C
6.3. EVALUATION OF CONSTRUCTION CONTRACTOR VALUE ENGINEERING CHANGE
PROPOSALS (VECPs):
1. The purpose of a VECP is to achieve savings in cost by adjusting the design so as to permit more economical methods and materials of construction and still maintain the operational, functional and aesthetic quality of the facility. Note that a construction contractor VECP differs from a construction contractor proposed variation or exception to the contract documents in that a VECP must maintain at least the same level of quality as in the original design while a proposed variation or exception could lower the quality of construction. Under the VECP program, the contractor and Government share in the savings resulting from acceptable proposals while a full credit (deduct) in the construction contract price is taken for approved variations or exceptions which are of lesser quality than the original design.
2. In addition to the general requirements, consultation reports on A&E evaluation of VECPs shall include the advantages and disadvantages of the VECP, and economic analysis & justification for recommending approval or rejection of the VECP.
3. In order to avoid tacit delays to construction, Government processing time for VECPs is held to 21 calendar days from the date the Contracting Officer receives the VECP package from the contractor. Accordingly, the A&E shall complete and forward consultation reports on VECPs to the Contracting Officer and COR within five (5) working days from the time of receipt. When the VECP is of the nature that the response requires additional time, the A&E shall notify the Contracting Officer as to the expected date of responses.
6.4 Errors and Omissions:
1. Architect-engineer contractors shall be responsible for the professional quality, technical accuracy, and coordination of all services required under their contracts. A firm may be liable for Government costs resulting from errors or deficiencies in designs furnished under its contract. Therefore, when a modification to a construction contract is required because of an error or deficiency in the services provided under an architect-engineer contract, the contracting officer (with the advice of technical personnel and legal counsel) shall consider the extent to which the architect-engineer contractor may be reasonably liable. The contracting officer shall enforce the liability and issue a demand for payment of the amount due, if the recoverable cost will exceed the administrative cost involved or is otherwise in the Government’s interest.
The contracting officer shall include in the contract file a written statement of the reasons for the decision to recover or not to recover the costs from the firm.
2. Reimbursement of costs incurred by the Government as a result of A&E's error and/or negligent performance are actively pursued by the VA. Upon determination that there may be A&E financial responsibility involved, the A&E shall be contacted by the Contracting Officer. The A&E shall be advised of the design deficiency and requested to provide a technical solution to the problem, including cost estimate. The A&E shall be further informed that it is the Contracting Officer’s that the A&E may be held financially responsible. A&E financial responsibility can include contractor extended overhead costs.
Therefore, upon notification of potential liability, the A&E should coordinate with the directing official to determine required technical support and timing to minimize delay costs. Pending final decision by the Contracting Officer, the A&E will be invited to attend all price negotiations for corrective work. The A&E shall participate as a non-voting technical advisor to the Government negotiating board. Inability to obtain agreement from the A&E as to financial responsibility or A&E unwillingness to participate in negotiations shall not be cause for delay or remedial construction contract action by the Contracting Officer. As an alternate to the above, the A&E (where design error is clearly at fault) may discharge the firm's financial responsibility through negotiation with, and direct payment to, the contractor.
Appendix A Submission Review Tools
The A/E is required to complete and submit the following tables to enhance evaluation of each submission. This should be used by the AE as a self-assessment tool to ensure full understanding of submission requirements.
Providing documentation will aid the VA in review by understanding the AE intentions for each submission.
A/E Milestone Schedule Track
Milestone Submission
Planned Duration
Planned Date Revised Duration
Revised Date Actual Duration
Actual Date
Conceptual 30% 60% 90% 100%
Duration shall be provided as days after NTP. Date shall be calendar date that matches duration.
Applicable Submission Requirements
Program Applicable Not Applicable Site Development Architectural Fire Protection Interior Design Structural Plumbing Sanitary
HVAC
Electrical Equipment Steam Generation Steam Distribution (Outside) Solid Waste Disposal System Automatic Transport Asbestos Abatement Space Planning Critical Path Method Estimating Specifications
Complete below checklist for all applicable requirements. Enter “Y” for every submission provided. If A/E believes a specific item on checklist that is generically required is not applicable for this specific project, enter NA with brief explanation below the table.
AE Submission Checklist
ARCHITECTURAL: Submit or show the following:
Architectural: 30%* AE Self Confirmation
DD** AE Self Confirmation
CD*** AE Self
Location of:
Rooms1 Doors2 Corridor(s)3 Basic column grid/sizes Expansion and seismic joints Electrical closets Equipment rooms Signal and telephone closets Mechanical shafts and space Stair(s) Ramp(s) Elevator(s) Automatic Conveyances Floor Plans/Drawings:
All floors (new and renovated) Penthouse Roof plan Pipe basement Pipe tunnel Reflected ceiling4 Equipment floor plans 1:50 (1/4 inch) scale5
Demolition plans6 Room names and numbers7
Architectural: 30%* AE Self
DD** AE Self Confirmation
Program net/designed net Exterior dimensions/total building gross area
Size and shape of all departmental functions and services9
Exterior building elevations10 Finish floor elevations11 Door locations, sizes, and swings Wall thickness and chase walls Handrail location/dimensions Fixed equipment Equipment elevations and details Plumbing fixtures Wheelchair accessible facilities Wall sections12 Building sections13 Finish grades at corners, entrances, exits, platforms and ramps
Fire and smoke rated partitions14 Lead-lined and radio-frequency-shielded partitions14
Fire extinguisher cabinets14 Spray-on fire proofing (see fire protection)
Construction details15 Drafting symbols, abbreviations, and general notes
Door, window, and louver schedules Interior details, elevations, sections Finish schedule16 Graphics and signage17 Color rendering Specifications Lead abatement18 Lead abatement specification19
* Submit, as a minimum, a single line layout for at a scale not less than 1:100 (1/8 inch). A scale of 1:200 (1/16 inch) is acceptable for architectural floor layout if an entire floor cannot be shown on one sheet. Submit a complete double line layout of areas of critical importance, at a scale of 1:50 (1/4 inch) including equipment.
** Submit minimum 1:100 (1/8 inch) scale floor plans, new and renovated, incorporating all of the revisions required by comments from schematics.
*** Submit fully dimensioned, complete, and coordinated 1:100 (1/8 inch) scale floor plans, incorporating all revisions required by comments from the design development phase.
Architectural NOTES:
1. Use lines between spaces to indicate the centerline of the partition (for schematics only).
2. Indicate doors with a slash mark.
3. Along the corridor, the line shall represent the corridor side of the partition.
4. Indicate ceiling mounted equipment, lighting fixtures, air diffusers, registers, tracks, and other significant elements.
5. Identify all equipment for each room. Indicate and coordinate all equipment with the Equipment Guide List (Program Guide 7610) and Activated Equipment List. Use VA standard symbols and notation to distinguish between contractor-furnished and installed (CC), VA-furnished contractor-installed (VC), VA-furnished and installed (VV), VA-furnished with construction funds [VC(CF) and VV(CF)], and relocated (R) equipment. Equipment floor plans are not required for the offices, consultation rooms, classrooms, conference rooms, and waiting rooms within the above departments. Draw equipment details which are necessary for major decisions, though complete detailing is not required for this submittal.
6. Indicate existing finish schedule and notes on plan.
7. Label as required for schematic drawings. Coordinate new room numbering with medical center.
8. Use the same names on drawings as those used in the space program.