This statement of work outlines the requirements for relining a 45-ton reverberatory furnace at the Naval Foundry and Propeller Center. The contractor will be responsible for removing existing brick lining from the furnace walls, roof, bungs, and other interior areas before installing new refractory brick made of alumina. Work must be completed by November 15, 2023 with a one-year contract period. The contractor will furnish all necessary materials and equipment, coordinate crane and facility utility access, and dispose of all debris. Access to the government site is required between 7:30am and 4:00pm Monday through Friday. The contractor's employees must pass security screening and be escorted on site.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW) 45 Ton Reverberatory Furnace Reline Naval Foundry and Propeller Center
1.0 INTRODUCTION
1.0.1 The Naval Surface Warfare Center Philadelphia Division (NSWCPD) is a Department of Defense entity responsible for research and development, test and evaluation, engineering and fleet support organization for the Navy’s ships, submarines, military watercraft and unmanned vehicles. This requirement is for Naval Foundry and Propeller Center (NFPC) who is responsible for the design, manufacture, and repair propellers for the US Navy.
1.0.2 This contract is for non-personal services. It does not create employment rights with the U.S. Government whether actual, inherent, or implied.
1.0.3 Government / Contractor Relationship
(a) The services to be delivered under this contract are non-personal services and the parties recognize and agree that no employer-employee relationship exists or will exist under the contract between the Government and the Contractor's personnel. Therefore, it is in the best interest of the Government to provide both parties a full understanding of their respective obligations.
(b) The Contractor employees shall identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel and displaying distinguishable badges or other visible identification for meetings with Government personnel. In addition, Contractor personnel shall appropriately identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence
(c) Contractor personnel under this contract shall not engage in any of the inherently Governmental functions listed at FAR Subpart 7.5 or DFARS Subpart 207.5.
(d) Employee Relationship:
| 1) | The services to be performed under this contract do not require the Contractor or its personnel to exercise personal judgment and discretion on behalf of the Government. Rather the Contractor's personnel will act and exercise personal judgment and discretion on behalf of the Contractor. |
| 2) | Rules, regulations, directives, and requirements that are issued by the U. S. Navy and NSWCPD under its responsibility for good order, administration, and security are applicable to all personnel who enter a Government installation or who travel on Government transportation. This is not to be construed or interpreted to establish any degree of Government control that is inconsistent with a non-personal services contract. |
(e) Inapplicability of Employee Benefits: This contract does not create an employer-employee relationship. Accordingly, entitlements and benefits applicable to such relationships do not apply.
(f) Notice. It is the Contractor's, as well as the Government's, responsibility to monitor contract activities and notify the Contracting Officer if the Contractor believes that the intent of this Section has been or may be violated.
1) The Contractor should notify the Contracting Officer in writing within three (3) calendar days from the date of any incident that the Contractor considers to constitute a violation of this Section. The notice should include the date, nature, and circumstances of the conduct; the name, function, and activity of each Government employee or Contractor official or employee involved or knowledgeable about such conduct; identify any documents or substance of any oral communication involved in the conduct; and the estimate in time by which the Government must respond to this notice to minimize cost, delay, or disruption of performance.
2) The Contracting Officer will, within five (5) calendar days after receipt of notice, respond to the notice in writing. In responding, the Contracting Officer will either:
| (i) | Confirm the conduct is in violation and when necessary direct the mode of further performance, |
| (ii) | Countermand any communication regarded as a violation, |
| (iii) | Deny that the conduct constitutes a violation and when necessary direct the mode of further performance, or |
| (iv) | In the event the notice is inadequate to make a decision, advise the Contractor what additional information is required, and establish the date by which it should be furnished by the Contractor. |
1.1 BACKGROUND
The Naval Foundry and Propeller Center (NFPC) located in Philadelphia, PA relies on the 45-Ton Reverberatory furnace to smelt metal during the melting and molding manufacturing process. In order to continue using the 45-Ton Reverberatory furnace safely, a reline is required. Relining schedule is a priority and a must in order to produce multiple castings throughout production year.
Prior to being considered for award, the contractor shall provide satisfactory evidence of having installed lining for large furnace. The contractor must be knowledgeable and experienced with the installation and relining of gas fired furnaces of high capacity such as the 45-ton furnace.
1.2 SCOPE OF WORK
This specification is for contractor to reline the 45-ton Reverberatory furnace at (NFPC), Building 20 low bay side. The contractor shall replace existing brick lining inside the furnace at the following locations; Charging wall, Burner wall, flue wall, tap wall, and all cast iron Bungs. The contractor shall exercise caution during relining procedure to prevent damage to any other area of the furnace. After completion of the repair, the 45-Ton furnace shall be fully operational and in good working condition. The contractor is expected to provide dumpster and dispose of material. All drivers delivering and removing dumpsters must pass security clearance and vehicle inspection prior to entering NFPC property.
This is a one (1) year contract. The CLIN structure shall be the following:
CLIN 0001-Reline of 45 Ton Reverberatory furnace—Firm Fixed Price (FFP)-award date 11/15/23
2.0 APPLICABLE DOCUMENTS
2.1 Furnace DWG.pdf
2.1.2 Burner alternative DWG.pdf
2.1.3 Misc Furnance DWG.pdf
2.1.4 Pit DWG.pdf
2.1.5 Furnace DWG (2).docx
3.0 REQUIREMENTS
3.1 General requirements
3.1.1 In order to reduce Crane service availability conflicts, The Contractor shall discuss beforehand with NFPC cane service needs and requirements during the 45-Ton Reverberatory relining. (Note: an unexpected need of the crane services may result in a delay, NFPC production takes priority of crane use).
3.1.2 The Contractor shall discuss with NFPC prior to arrival on work site, the use of NFPC’s supplied air, electric, and waterline supply availability for contractors to tap into during relining.
3.1.3 Besides the items mentioned, air, electric, water, and crane service; the contractor shall provide all other material required to complete relining the 45-ton Furnace.
3.1.4 The Contractor is required to provide the Product Safety sheets for all materials to be used for the 45-ton Reverberatory furnace reline to NFPC for our records.
3.1.5 The contractor shall provide documentation from the Brick/Refractory supplier stating that a Bake out/Sinter procedure will be or will not be required prior to the startup operation of the furnace. If the material-supplier recommends a bake out/sinter procedure, then NFPC expects the contractor to provide the full bake out/sinter procedure. Contractor shall adhere to this expectation, the job is considered incomplete without this information.
3.1.6 The contractor shall only use the following brick material types at the specified locations:
Charging wall, Burner wall, Flue wall, and Tap wall – 80% Alumina hot face brick with 40 % super duty back up brick and a ceramic insulating board material. Roof and shelve areas will be 70% Alumina brick
3.1.7 Contractor performance work hours, Monday through Friday, 0730 to 1600 hours. Notification of start date prior to showing up on site to NFPC is required. Notification shall not be less than 14 days. The point of contact is Jean Clotaire, Equipment Engineering, Bldg. #712, phone 215.897.2485.
3.1.8 The Contractor shall provide NFPC with a complete set of “as built” drawings that depict all materials used and where they were installed, including wall anchor details.
3.2 Relining the 45 Ton Furnace Reverberatory, North Wall
3.2.1 The contractor shall remove all brick from the (Tap Side/north wall) to the shell of the furnace. Contractor shall place all debris resulting from brick removal into dumpster provided by contractor. The contractor is responsible for the proper removal of relining material off NFPC’s property.
3.2.2 The contractor shall clean shell of all debris and install a ceramic insulating board. The approximate dimensions of the interior wall are 6’ h x 12’ w. The new brick wall, with a thickness of about 14”, will include 80% alumina hot face brick, a 40% super duty backup brick, high alumina mortar and insulating board material. The wall is to be anchored to the shell with a combination of properly rated metal wall anchors and physical brick ties.
3.3 Relining the 45 Ton Furnace Reverberatory, South Wall
3.3.1 The contractor shall remove all brick from the (South wall/charge side) to the shell of the furnace. Contractor shall place all debris resulting from brick removal into dumpster provided by contractor. The contractor is responsible for the proper removal of relining material off NFPC’s property. The contractor shall clean shell of all debris and install a ceramic insulating board.
3.3.2 The approximate dimensions of the interior wall are 6’ h x 12’ w. The new brick wall, with a thickness of about 14”, will include 80% alumina hot face brick, a 40% super duty backup brick, high alumina mortar and insulating board material. The wall is to be anchored to the shell with a combination of properly rated metal wall anchors and physical brick ties using the 80% alumina brick. The two arched walls will also need to be rebricked with 80% alumina material. Make both arch openings the same size. The vertical wall is to be anchored to the shell with a combination of properly rated metal wall anchors and physical brick ties.
3.4 Relining the 45 Ton Furnace Reverberatory, East Wall and Arched Roof
3.4.1 The contractor shall remove all brick from the East wall and arched roof (flue side) to the shell of the furnace. Contractor shall place all debris resulting from brick removal into dumpster provided by contractor. The contractor is responsible for the proper removal of relining material off NFPC’s property.
Contractor shall clean shell of all debris and install a ceramic insulating board. The approximate dimensions of the interior walls are 4’ in height with the flue opening being 4’ long and the two angled side walls being 5’ long. The new brick wall, with a thickness of about 14”, will include 80% alumina hot face brick, a 40% super duty backup brick, high alumina mortar and insulating board material. The wall is to be anchored to the shell with a combination of properly rated metal wall anchors and physical brick ties using the 80% alumina brick. Reconstruct the roof with 9” 70% alumina firebrick. Establish a point of reference to ensure new roof installation terminates in the exact location of existing. Reconstruct shelve area to its original dimensions using 70% alumina firebrick. The shelf starts approximately 1.5’ away from the flue. It is about 4’ wide and 1.5’ tall. The vertical wall is to be anchored to the shell with a combination of properly rated metal wall anchors and physical brick ties.
3.5 Relining the 45 Ton Furnace Reverberatory, West Wall, Shelf, and Arched Roof (Burner Side)
3.5.1 The contractor shall remove all brick from the Tap Side wall including the shell and arched roof all the way back to the shell of the furnace taking extra care not to damage the burner blocks.
3.5.2 Clean shell of all debris and install a ceramic insulating board. Contractor shall place all debris resulting from brick removal into dumpster provided by contractor. The contractor is responsible for the proper removal of relining material off NFPC’s property.
3.5.3 The approximate dimensions of the interior wall are 6’ h x 12’ w. The new brick wall, with a thickness of about 14”, will include 80% alumina hot face brick, a 40% super duty backup brick, high alumina mortar and insulating board material. The wall is to be anchored to the shell with a combination of properly rated metal wall anchors and physical brick ties using the 80% alumina brick. Reconstruct the burner side roof with 9” 70% alumina firebrick. Establish a point of reference to ensure new roof installation terminates in the exact location of existing. Reconstruct shelve area to its original dimensions using 70% alumina firebrick. The Shelf starts 2.5’ away from the burners. It is about 1.5’ tall and 6.5’ wide. The wall is to be anchored to the shell with a combination of properly rated metal wall anchors and physical brick ties.
3.6 Relining the 45 Ton Furnace Reverberatory, Roof Bungs
3.6.1 Contractor shall remove all brick from the Roof Bungs to the cast iron shell, clean the shell of all debris and install new brick. Contractor shall place all debris resulting from brick removal into dumpster provided by contractor. The contractor is responsible for the proper removal of relining material off NFPC’s property.
3.6.2 The new brick will be 70% alumina firebrick. Establish a reference point to ensure that the roof instillation terminates in the exact location of existing. All arched bungs have an 11’ radius.
· 5 Cast iron Roof Bungs (approximately 12’ x 3’) reline with 9 x 4-1/2 x 2-1/2” 70% alumina firebrick (wedge and 9” straights)
· 2 Cast iron Roof Bungs (approximately 12’ x 13” and 12’ x 16”) reline with 9 x 4-1/2 x 2-1/2” 70% alumina firebrick (wedge and 9” straights)
3.6.3 Upon completion of installation, contractor will confirm that all roof bungs are properly aligned. (NFPC personnel will provide lifting and handling support during relines. This support is to ensure proper alignment. The bungs have to be placed into position for a test fit. This cannot be done without the help of lifting and handling, as they are the only ones that will utilize the crane to put the bungs into place.) NFPC personnel will provide support with this task.
4.0 DATA REQUIREMENTS
N/A
5.0 SECURITY REQUIREMENTS
5.1 The contractor shall be escorted onto the site, observed while they perform the work, and escorted off the site.
5.2 Escorted visit. Escorted visits are required for any person who is not assigned to NNSY/NFPC and/or does not have a valid security clearance. Visitors will be escorted at all time by an NFPC employee and no exposure to any classified open storage areas or material. Requests for escorted access must be submitted 5 working days prior to arrival. If it is service or maintenance that needs to be done or an emergency the request needs to be submitted immediately in order to allow for ample time for proper vetting of individual/individuals requesting access.
The requesting NFPC code/shop will coordinate the visit and security code 1123 will verify two forms of Government issued identification. The responsible code shall provide escort during the contractor’s visit.
Acceptable documents include:
· US Birth Certificate (original)
· US Voters registration
· US Passport
· (Home Land security), Transportation Workers Identification Credential (TWIC)
· Naturalization paperwork
· Driver’s License
· Social Security Card
Installation Access for Visitors/Contractors
All visitors/contractors having a valid purpose for access shall submit a completed and signed Form 5512/1 to their identified Government sponsor 14 working days prior to the date of their required visit.
The entire document shall be completed and form dated/signed by the visitor/contractor.
Visitor/Contractor shall retain a copy of the form 5512/1 to present on the first day at the installation.
The visitor/contractor shall communicate all on-site day to day schedules and schedule changes to the NFPC base sponsor to be submitted to code 1123 in a detailed security plan.
Note: It is critical that start/end dates/work hours are identified, accurate, and short term visitors/contractors are not granted extended or after-hours access if not required Reporting to PNY-A for the first time.
Visitor/Contractor Responsibility
Visitor/Contractor shall report to the location designated by their sponsor (Security Office or other designated location, Pass and ID office) or if operating a Commercial Vehicle requiring inspection; to the Vehicle Inspection Station.
Visitor/Contractor shall present their completed and signed 5512/1.
The Sentry or Security Assistant shall verify vetting is cleared and issue the appropriate passes. If visitor/contractor has not completed the 5512/1 their access will be delayed until they correct the form.
Code 1123 will review request and when acceptable notify requesting NFPC code/shop to arrange visit.
5.3 Contractor Vehicle Parking: (OPNAV 5530.14E) All contractor commercial vehicles must be visually inspected at Lot 753 prior to entry into any NFPC buildings and are subject to random inspections anywhere on the compound. Vehicles must clearly display an authorized company sign or logo including a company phone number. Vehicles must only be allowed in the compound for transportation of contractors' tools, parts, and materials to and from the work site with the exception of MILCON scope projects. Vehicles must be registered to the company and not to an individual. Parking of POV's is available at Lot 753, which is approximately one mile from the work site. Contractor shall ensure that their vehicles, including delivery trucks, have valid and current vehicle registration and insurance upon arrival to NFPC. Non-valid and outdated or missing vehicle registration and insurance shall result in denied facility access requiring the Contractor to reschedule delivery immediately at the contractor’s expense. Delivery drivers must present two forms of Government issued identification.
5.4 PEDs (Portable Electronic Devices) are not allowed in areas where work is being performed.
Should the Contractor require a laptop, tablet or other similar device on-site to fulfill the Scope of Work, the Contractor must complete an asset authorization form for each device and submit the devices to code 109 for inspection and approval prior to site access. The laptops cannot have camera capabilities. Procedures regarding laptop access are subject to change.
PEDs (Portable Electronic Devices) are PROHIBITED:
In Restricted Areas (Open Storage Confidential Areas, Secure Rooms, Vaults, etc.) and any location (office, trailer, shop, work area, etc.) where NAVSEA business is conducted.
PEDs are permitted in Personally Owned Vehicles parked outside of the Controlled Access Area. (General parking lots across the street.)
Cell Phones/Smart Watches/Fitness Bands/ Wireless Headsets and Speakers are permitted in outside areas of the CAA and where Naval Sea Systems Command (NAVSEA) business of a sensitive nature is NOT conducted. Cell Phones, Smart Watches, Fitness Bands or Wireless Headsets and Speakers are prohibited in the OSC Areas.
PEDs are PROHIBITED in Secure Rooms (regardless of where any of these areas are located), and in any meeting, discussion or forum where NAVSEA business of a sensitive nature is carried on.
Cellphone lockers/boxes will be placed at the entrance to facilities, or as close to the entrance as possible in order to facilitate this policy.
********CAA-Controlled Access Area is anywhere within the fence line********
5.5. The contractor shall adhere to the facility/base access guidance per the following website:
https://www.cnic.navy.mil/regions/cnrma/om/contractor_verification_system/faqs.html
5.6. The contractor shall ensure that only contractor employees who meet the security requirements stated below perform under this contract at the Government site (e.g. delivery drivers and passengers, etc.). The contractor shall propose and maintain a list of employees whom meet these requirements and be willing to submit this list to the Government, along with the necessary documentation to prove they meet them (e.g. the results of a contractor conducted background check, etc.), for the Government’s security vetting, to include any Government background check, and approval. Once vetted and approved, a list of approved contractor employees must be maintained for the entire period of performance of the contract (i.e. propose new employees, replace existing employees or provide updates to existing employees’ records, as necessary). A minimum of two employees, primary and backup, should be cleared by the Government to perform the necessary functions under this contract (e.g. proposed drivers of a delivery vehicle) throughout the entire period of performance of the contract. Contractors must have the ability to be granted access by ensuring current documentation is available at the submission of their proposal to allow background checks for any proposed driver and passenger under the following criteria:
· Felony conviction of any type within 10 years, or felony arrest that has not been adjudicated yet (includes "deferred findings").
· Misdemeanor conviction or on-base arrest within 5 years, for any of the following types of crimes (includes "deferred findings"): Crimes of violence, sexual assault, larceny, drugs, or a habitual offender.
· On the Sex Offender Registry.
· Is barred from any Navy installation.
If a contractor’s employee is denied entry at delivery due to inaccurate or outdated personal and/or vehicle documentation, the Government is absolved of any costs accrued as a result of the denial and the contractor is still pledged to fulfill the contract requirements. Failure to fulfill the contract requirement may result in a termination for default pursuant to FAR 49.4.
5.7 OPERATIONS SECURITY (OPSEC)
The Contractor shall protect critical information associated with this contract to prevent unauthorized disclosure. NFPC’s Critical Information List, (CIL) will be provided on site, if warranted. Performance under this contract requires the contractor to adhere to OPSEC requirements. The Contractor may not impose OPSEC requirements on its subcontractors unless NFPC approves the OPSEC requirements. During the period of this contract, the Contractor may be exposed to, use, or produce, NFPC Critical Information (CI) and/or observables and indicators which may lead to discovery of CI. NFPC CI will not be distributed to unauthorized third parties, including foreign governments, or companies under Foreign Ownership, Control, or Influence (FOCI) ) unless such FOCI has been appropriately mitigated through measures approved by the Defense Counterintelligence and Security Agency.
CUI correspondence transmitted internally on the contractor's unclassified networks or information systems, and externally, shall be protected per NIST SP-800-171, Protecting Controlled Unclassified Information (CUI) in Non-federal Systems and Organizations.
Assembled large components/systems being transported to and from testing areas, other production or government facilities (whether or not on public roadways) shall be in an enclosed van trailer or covered flatbed trailer. Component/System outside storage, staging, and test areas shall be shielded/obscured from public view wherever physically possible.
NFPC’s CI shall not be publicized in corporate wide newsletters, trade magazines, displays, intranet pages or public facing websites. Media requests related to this project shall be directed to the PCO, and the COR who will forward the required to the NFPC Public Release Authority for review.
Any attempt by unauthorized third parties to solicit, obtain, photograph, or record, or; incidents of loss/compromise of government Classified or CI, Business Sensitive, Company Proprietary information related to this or other program must be immediately reported to the contractor's Facility Security Officer and Cognizant Security Office and/or the Naval Criminal Investigative Service, and the NFPC Security Division (Code 1123). Questions concerning these requirements shall be directed to the PCO, and the COR who will forward the request to the NFPC Security Division (Code 1123).
5.8 RECEIPT, STORAGE, AND GENERATION OF CONTROLLED UNCLASSIFIED INFORMATION (CUI)
All Controlled Unclassified Information (CUI) associated with this contract must follow the minimum marking requirements of DoDI 5200.48, Section 3, paragraph 3.4.a, and include the acronym "CUI" in the banner and footer of the document. In accordance with DoDI 5200.48, CUI must be safeguarded to prevent Unauthorized Disclosure (UD). CUI export controlled technical information or other scientific, technical, and engineering information must be marked with an export control warning as directed in DoDI 5230.24, DoDD 5230.25, and Part 250 of Title 32, CFR. Nonfederal information systems storing and processing CUI shall be protected per NIST SP-800-171, or subsequent revisions. All transmissions to personal email accounts (AOL, Yahoo, Hotmail, Comcast, etc.) and posting on social media websites (Facebook, Instagram, Twitter, LinkedIn, etc.) are prohibited. Destroy CUI associated with this contract by any of the following approved methods: A cross-cut shredder; a certified commercial destruction vendor; a central destruction facility; incineration; chemical decomposition; pulverizing, disintegration; or methods approved for classified destruction.
6.0 PLACE OF PERFORMANCE
6.1.1 The service will occur at the following government site:
Naval Foundry & Propeller Center 1701 Kitty Hawk Ave Building 20 Philadelphia Navy Yard Philadelphia, PA 19112
6.1.2. The Contractor shall provide a list of employees who require access to these areas, including standard security clearance information for each person, to the Information Security POC, Cody Taylor (cody.r.taylor1@navy.mil) no later than three business days after the date of award. The work space provided to the Contractor personnel shall be identified by the Awardee, with appropriate signage listing the company name and individual Contractor employee name.
6.1.3. Access to Government buildings at NFPC is from 0730 to 1800 Monday through Friday, except Federal holidays. Normal work hours are from 0730 to 1800, Monday through Friday. Contractor employees shall be under Government oversight at all times. Government oversight requires that a Government employee be present in the same building/facility whenever Contractor employee(s) are performing work under this contract. Contractor personnel are not allowed to access any Government buildings at NFPC outside the hours of 0730 to 1800 without the express approval of the Procuring Contracting Officer (PCO).
6.1.4. Early Dismissal and Closure of Government Facilities
When a Government facility is closed and/or early dismissal of Federal employees is directed due to severe weather, security threat, or a facility related problem that prevents personnel from working, onsite Contractor personnel regularly assigned to work at that facility should follow the same reporting and/or departure directions given to Government personnel. The Contractor shall not direct charge to the contract for time off, but shall follow its own company policies regarding leave. Non-essential Contractor personnel, who are not required to remain at or report to the facility, shall follow their parent company policy regarding whether they should go/stay home or report to another company facility. Subsequent to an early dismissal and during periods of inclement weather, onsite Contractors should monitor radio and television announcements before departing for work to determine if the facility is closed or operating on a delayed arrival basis.
When Federal employees are excused from work due to a holiday or a special event (that is unrelated to severe weather, a security threat, or a facility related problem), on site Contractors will continue working established work hours or take leave in accordance with parent company policy. Those Contractors who take leave shall not direct charge the non-working hours to the contract. Contractors are responsible for predetermining and disclosing their charging practices for early dismissal, delayed openings, and closings in accordance with the FAR, applicable cost accounting standards, and company policy. Contractors shall follow their disclosed charging practices during the contract period of performance, and shall not follow any verbal directions to the contrary. The PCO will make the determination of cost allowability for time lost due to facility closure in accordance with FAR, applicable Cost Accounting Standards, and the Contractor's established accounting policy.
7.0 TRAVEL
N/A
8.0 GOVERNMENT FURNISHED PROPERTY
N/A
9.0 GOVERNMENT FURNISHED INFORMATION
N/A
10.0 PURCHASES
N/A
11.0 COUNTERFEIT MATERIAL PREVENTION
N/A
12.0 PERSONNEL
N/A
13.0 NSWCPD ELECTRONIC COST REPORTING AND FINANCIAL TRACKING (ECRAFT) SYSTEM
N/A
14.0 SPECIAL REQUIREMENTS
N/A