This document outlines the scope of work for installation of a ductless heat pump system at the US Coast Guard Base in Portsmouth, Virginia under solicitation number 31040Q230000305. The contractor will provide all labor, materials and equipment to install a 30K BTU split ductless heat pump system comprising an outdoor unit, two 15K BTU cassette ceiling mount indoor units, line sets, and a wired thermostat. The system must be installed and ready for use within 30 working days of contract award. The contractor will be responsible for mounting equipment, running line sets, electrical connections, wall penetrations, and providing a 12-month labor and 10-year materials warranty upon completion. The point of contact for inquiries and site visits is Hayden Heyer of the US Coast Guard.

View the file

Other files for this federal contract opportunity

Other files attached to A/C INSTALL, newest first.
File Type Posted
31040Q230000305_Davis-Bacon Act WD_VA20230161.txt TXT text file
Construction Clauses and Provisions FAC 2023-01.pdf PDF
SF-18_31040Q230000305.pdf PDF
CONSTRUCTION DAVIS-BACON SERVICE CONTRACT ACT.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

1. GENERAL REQUIREMENTS: The work consists of providing all labor, materials and equipment as required to install 30K BTU split ductless heat pump system or equivalent for UPH

Micro-Mart. System will comprise of one 30K BTU ductless heat pump with mounting, two matched 15K

BTU cassette ceiling mount air handling units, appropriate lines sets (line hide system), tamper proof wired thermostat. This system will be installed at USCG Base Portsmouth, 4000 Coast Guard

Blvd., Portsmouth, VA 23703.

2. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK: Upon acceptance the contractor shall commence work NLT (5) days after notice to proceed and work diligently to complete the entire work ready for use by 30 working days after contract award

3. SCOPE OF WORK:

(a) That the work be factored for regular hours- 0700-1600.

(b) System will provide year round temperature control and provide effective space conditioning to compensate for seasonal extremes.

(c) Contractor shall mount outdoor unit with sufficient clearance to meet manufactures recommendations for air flow.

(d) The protection of all furnishings, fixtures, floors, walls, and ceiling areas.

(c) Provide and install equipment, mounting hardware and line sets

(d) Provide and install wired thermostat with tamper-proof cover.

(e) Contractor will direct FED where to provide main electrical connections.

(f) Outside unit to be mounted 7’ high on exterior brick wall, contractor to furnish mounting hardware and service disconnect. Contractor will drill and seal all wall penetrations to service disconnects.

(f) Provide a 12 month warranty on all labor provided in writing upon completion of job.

(g) Provide a 10 year commercial warranty on all materials provided in writing upon completion of job shall be provided.

4. SITE VISIT: All bidders are strongly encouraged to visit the site to field verify any/all quantities before submitting bids. Interested parties shall make arrangements for a site visit with

Hayden Heyer, (757) 284-6873, gary.h.heyer@uscg.mil .

All site visits are to be prearranged a minimum of (3) days in advance. To arrange a site visit, the following information is to be provided Full name, date of birth, and last 4 of SSN.

5. DESIGNATED CONTRACTING OFFICER’S QA EVALUATOR (QAE)

REPRESENTATIVE: The designated contracting officer’s QAE representative and Point of

Contact for this project Hayden Heyer, (757) 284-6873, gary.h.heyer@uscg.mil .

6. CONDITIONS AFFECTING THE WORK: The Offeror should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, the general and local conditions which can affect the cost of the work thereof. Failure to do so will not relieve bidders from responsibility for estimating properly the difficulty or cost of successfully performing the work. The government will assume no responsibility for any mailto:gary.h.heyer@uscg.mil understanding or misrepresentations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the request for quotes, the specification or related documents.

All contractors that require Base access will have to be pre-vetted for entry prior to commencement of work. Submit list of personnel requiring access to (QAE) Hayden Heyer , (757)-284-6873 gary.h.heyer@uscg.mil a minimum of (3) working days prior.

Include full name, date of birth, last 4 of SSN, citizenship, driver license number.

7. AFTER AWARD OF THE CONTRACT: The contractor must immediately notify the contracting officer’s QAE representative of his intended start date. The work shall be done in accordance with the specification.

8. ORAL MODIFICATION: No oral statement of any person other than the contracting officer shall in any manner or degree, modify or otherwise affect the terms of this contract.

9. WORKMANSHIP: All work shall be accomplished with the best standard practices, and by workmen thoroughly experienced in the required trades. The work shall be supervised by experienced personnel and shall be satisfactory to the Contracting Officer.

10. PERMITS: The contractor shall without additional expense to the government, obtain all appointments, licenses, and permits required for the prosecution of the work. The contractor shall comply with all applicable federal, state and local laws.

11. CLEAN UP: All trash and debris shall be removed from the site daily. The job site shall be left in a clean and neat manner.

12. WORK OUTSIDE REGULAR HOURS: If the contractor desires to carry on work on

Saturday, Sunday, holidays or outside the station’s regular hours, he may submit his request in writing to the Contracting Officer’s QAE Representative for approval consideration. The contractor shall allow ample time to enable satisfactory arrangements to be made by the government for inspecting the work in progress.

13. UPON COMPLETION OF WORK: Contact the Contracting Officer QAE Representative to arrange for inspection/acceptance of work.

14. IDENTIFICATION OF CONTRACTOR PERSONNEL AND VEHICLES: The contractor shall provide a detailed list of all employees to the QAE Representative five (5) days prior to commencing work. The employee list shall contain the employee’s full name, date and place of birth, current address and last four (4) of SSN. The Base Portsmouth Security Officer will be given a copy of the employee list and a pass will be issued for entry. Each contractor provided vehicle or towed trailer shall show the contractor’s name so that it is clearly visible on the vehicle. A valid state license plate and safety inspection sticker is required. All vehicles operated on government property shall be maintained in a good state of repair.

15. SAFETY REQUIREMENTS:

1. Responsibilities:

a. All contractors working on CG Base Portsmouth shall abide by all federal safety regulations as published by the Occupational Health and Safety Administration, 29

CFR 1910 (series) and 29 CFR 1926 (series). Contractor written safety programs shall be reviewed by the Base Safety Officer prior to starting work.

b. Written notification must be provided to the Base Safety Officer; Noah Reinhart

(757-638-2793) noah.w.reinhart@uscg.mil in their capacity as Base Fire Marshal of any activity that could potentially cause fire or explosion or that changes or reduces the capability of fighting a fire or explosion. Some examples of qualifying activities are: a fire hydrant or fire suppression system that must be taken out of service for any reason, electrical work that affects fire alarm systems, introduction of hazardous or flammable material onto the Base, and blocking of any egress routes or emergency vehicle routes. Inclusion of this information in the contract constitutes written notification as long as the outsource review sheet is signed by Base Safety Officer.

c. Copies of the following must be provided to the Base Safety Officer prior to starting work in affected areas: Confined Space Entry Permits, Hot Work Chits, and Dig

Chits. Confined space clearance must be conducted by a certified marine chemist and permit required spaces will have a copy of the permit posted on site during work. Hot work will only be conducted with permission and a fire watch must be posted during work. A facility dig chit is required in addition to a Miss Utility dig chit. The systems on Base Portsmouth are not limited to what the City of Portsmouth has on file. In order to ensure electrical safety and integrity of systems, a facility chit is required.

d. Lock Out/Tag Out requires notification and coordination with facilities and will not be conducted by a contractor on Base Portsmouth. A Facilities Division representative is required for all contractor Lock Out/Tag Out needs.

2. Rights:

a. Every employee working on Base Portsmouth has the right to a safe and healthy work place. The contractor has the responsibility and right to stop unsafe work. QAE’s and the

Safety Officer may also institute a work stoppage relating to unsafe practices or immediate danger to life and health situations.

16. ENVIRONMENTAL PROTECTION REQUIREMENTS:

a. All contractors working on CG Base Portsmouth shall abide by all federal environmental regulations as published by the Environmental Protection Agency, 40

CFR (series). Contractor written environmental management and pollution prevention programs shall be reviewed by the Environmental Protection Specialist;

Jonathon Cooper (757.483.8593) jonathan.a.cooper2@uscg.mil prior to starting work and must be in accordance with ICSPORTSVA INSTM5090.2, the Unit

Environmental Guide.

b. Written notification must be provided to the Environmental Protection Specialist of mailto:noah.w.reinhart@uscg.mil mailto:jonathan.a.cooper2@uscg.mil any activity that could potentially cause a permit violation on Base Portsmouth.

Some examples of qualifying activities are: any activity that could result in a spill or discharge into a waterway or introducing a hazardous material into the environment.

c. Copies of the following must be provided to the Environmental Protection Specialist prior to starting work in affected areas: Material Safety Data Sheets, permits, and notices of intent.

d. Hazardous materials used by a contractor are required to be disposed of by that contractor. Disposal must be in accordance with federal, state, and local guidelines.