SOW 25-5C1 Link16 VME TC CPU Hardware Manufacturing Contract 14Jan2025_Redacted.pdf
PDF 198 KB Posted
- Solicitation number
- HQ072725SSW01
- Issued by
-
Defense Microelectronics Activity
About this file
This Statement of Work (SOW) details the manufacturing requirements for VME TC CPU Hardware for the Defense Microelectronics Activity (DMEA). The project involves manufacturing prototype and production-grade hardware for external DoD customers, specifically supporting a mounting system for the Link16 - VME TC CPU to accommodate a Windows 11 operating system upgrade.
The SOW specifies the manufacturing of six specific hardware components, including face plates, support plates, and brackets made from materials like 6061-T6 Aluminum and Stainless Steel. The total initial quantity is 800 units across these components, with an option to supply an additional 1-100 units. The contractor must adhere to DMEA-provided specifications, design files, and manufacturing guidelines, and is required to review and verify design files before manufacturing. The contract includes a requirement for regular technical updates throughout the performance period, covering progress and delivery dates.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sources Sought SOW 25-5C1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOW PWS Template 2021 June.doc
3.3.1 REQUIREMENT: The contractor will manufacture the following part descriptions in accordance with DMEA provided specifications, design and manufacturing files, including material selection, dimensions, and tolerances.
Part Description Material Qty Link 16 Face Plate 6061-T6 Aluminum, 0.100” thick 80 Optical Drive Support Plate 6061-T6 Aluminum, 0.063” sheet 80 PCB Mount Bracket with (2) tapped holes 2.5MM x .45 Stainless Steel 320 Link 16 Bracket With (2) 10-32 Tapped Holes 6061-T6 Aluminum 160 Link 16 Disk Drive Bracket 1 with (2) tapped holes 3.0mmx0.5 Stainless 80 Link 16 Disk Drive Bracket 2 with (2) tapped holes 3.0mmx0.5 Stainless 80
3.3.2. OPTION1: The contractor will supply an additional 1 - 100 units of all part numbers mentioned above in 3.3.1
3.5 Reporting: The contractor will provide regular technical updates throughout the period of performance. These updates should include progress and delivery dates.
4.0 DATA ITEMS: NONE
File details come from the government source that posted it. Updated .