This is a Statement of Work (SOW) for gas turbine repair services on the USCGC BERTHOLF (WMSL 750) for the U.S. Coast Guard, with work to be performed at Coast Guard Island, Alameda, CA between February 3, 2025 and April 9, 2025. The work includes cleaning and inspecting stator vanes from stages 1-11, renewing stator vane control components for the Gas Generator (S/N - GGA1263), replacing five damaged Stage 3 lever arms, renewing a damaged Stage 3 ring segment, and renewing a lever assembly with associated hardware. The contractor must provide a qualified Technical Representative familiar with the GE LM-2500 to supervise all work.
The evaluation criteria weighs technical factors slightly more than price, with Technical Approach (30%), Experience (30%), Key Personnel (30%), and Past Performance (10%) as the evaluation factors. Contractors must submit a detailed work plan with their proposal outlining methods, equipment, and materials to be used. The Coast Guard will provide various gaskets, bolts, nuts, bearings, and other specific components as Government Furnished Equipment (GFE), though additional contractor-provided materials will be required. Any remanufactured items must be overhauled and inspected by General Electric or a GE-authorized level 3 maintenance facility.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), 2022, Fire Prevention and Response
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements of this WI applies to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Fire Prevention Specification. The Contractor must submit a Fire Prevention Plan in accordance with paragraph 3.1 of SFLC Standard Spec 5550
3.3. Period of Performance. The period of performance for this work starts on 3 February 2025 and ends on 9 April 2025.
3.4. Location. The Contractor must perform the work while the USCGC BERTHOLF (WMSL 750) is alongside the pier at Coast Guard Island, Alameda, CA 94501.
3.5. Security Requirement. Contractor Employee Access (JUL 2023)
(a) Controlled Unclassified Information (CUI) is any information the Government creates or possesses, or an entity creates or possesses for or on behalf of the Government (other than classified information) that a law, regulation, or Governmentwide policy requires or permits an agency to handle using safeguarding or dissemination controls. This definition includes the following CUI categories and subcategories of information:
(1) Chemical-terrorism Vulnerability Information (CVI) as defined in 6 CFR part 27, “Chemical Facility Anti-Terrorism Standards,” and as further described in supplementary guidance issued by an authorized official of the Department of Homeland Security (including the Revised Procedural Manual “Safeguarding Information Designated as Chemical-Terrorism Vulnerability Information” dated September 2008);
(2) Protected Critical Infrastructure Information (PCII) as set out in the Critical Infrastructure Information Act of 2002 (title XXII, subtitle B of the Homeland Security Act of 2002 as amended through Pub. L. 116–283), PCII's implementing regulations (6 CFR part 29), the PCII Program Procedures Manual, and any supplementary guidance officially communicated by an authorized official of the Department of Homeland Security, the PCII Program Manager, or a PCII Program Manager Designee;
(3) Sensitive Security Information (SSI) as defined in 49 CFR part 1520, “Protection of Sensitive Security Information,” as amended, and any supplementary guidance officially communicated by an authorized official of the Department of Homeland Security (including the Assistant Secretary for the Transportation Security Administration or designee), including Department of Homeland Security MD 11056.1, “Sensitive Security Information (SSI)” and, within the Transportation Security Administration, TSA MD 2810.1, “SSI Program”;
(4) Homeland Security Agreement Information means information the Department of Homeland Security receives pursuant to an agreement with State, local, Tribal, territorial, or private sector partners that is required to be protected by that agreement. The Department receives this information in furtherance of the missions of the Department, including, but not limited to, support of the Fusion Center Initiative and activities for cyber information sharing consistent with the Cybersecurity Information Sharing Act of 2015;
(5) Homeland Security Enforcement Information means unclassified information of a sensitive nature lawfully created, possessed, or transmitted by the Department of Homeland Security in furtherance of its immigration, customs, and other civil and criminal enforcement missions, the unauthorized disclosure of which could adversely impact the mission of the Department;
(6) International Agreement Information means information the Department of Homeland Security receives that is required to be protected by an information sharing agreement or arrangement with a foreign government, an international organization of governments or any element thereof, an international or foreign public or judicial body, or an international or foreign private or non-governmental organization;
(7) Information Systems Vulnerability Information (ISVI) means:
(i) Department of Homeland Security information technology (IT) systems data revealing infrastructure used for servers, desktops, and networks; applications name, version, and release; switching, router, and gateway information; interconnections and access methods; and mission or business use/need. Examples of ISVI are systems inventories and enterprise architecture models. Information pertaining to national security systems and eligible for classification under Executive Order 13526 will be classified as appropriate; and/or
(ii) Information regarding developing or current technology, the release of which could hinder the objectives of the Department, compromise a technological advantage or countermeasure, cause a denial of service, or provide an adversary with sufficient information to clone, counterfeit, or circumvent a process or system;
(8) Operations Security Information means Department of Homeland Security information that could be collected, analyzed, and exploited by a foreign adversary to identify intentions, capabilities, operations, and vulnerabilities that threaten operational security for the missions of the Department;
(9) Personnel Security Information means information that could result in physical risk to Department of Homeland Security personnel or other individuals whom the Department is responsible for protecting;
(10) Physical Security Information means reviews or reports illustrating or disclosing facility infrastructure or security vulnerabilities related to the protection of Federal buildings, grounds, or property. For example, threat assessments, system security plans, contingency plans, risk management plans, business impact analysis studies, and certification and accreditation documentation;
(11) Privacy Information includes both Personally Identifiable Information (PII) and Sensitive Personally Identifiable Information (SPII). PII refers to information that can be used to distinguish or trace an individual's identity, either alone, or when combined with other information that is linked or linkable to a specific individual; and SPII is a subset of PII that if lost, compromised, or disclosed without authorization could result in substantial harm, embarrassment, inconvenience, or unfairness to an individual. To determine whether information is PII, DHS will perform an assessment of the specific risk that an individual can be identified using the information with other information that is linked or linkable to the individual. In performing this assessment, it is important to recognize that information that is not PII can become PII whenever additional information becomes available, in any medium or from any source, that would make it possible to identify an individual. Certain data elements are particularly sensitive and may alone present an increased risk of harm to the individual.
(i) Examples of stand-alone PII that are particularly sensitive include: Social Security numbers (SSNs), driver's license or State identification numbers, Alien Registration Numbers (A-numbers), financial account numbers, and biometric identifiers.
(ii) Multiple pieces of information may present an increased risk of harm to the individual when combined, posing an increased risk of harm to the individual. SPII may also consist of any grouping of information that contains an individual's name or other unique identifier plus one or more of the following elements:
(A) Truncated SSN (such as last 4 digits);
(B) Date of birth (month, day, and year);
(C) Citizenship or immigration status;
(D) Ethnic or religious affiliation;
(E) Sexual orientation;
(F) Criminal history;
(G) Medical information; and
(H) System authentication information, such as mother's birth name, account passwords, or personal identification numbers (PINs).
(iii) Other PII that may present an increased risk of harm to the individual depending on its context, such as a list of employees and their performance ratings or an unlisted home address or phone number. The context includes the purpose for which the PII was collected, maintained, and used. This assessment is critical because the same information in different contexts can reveal additional information about the impacted individual.
(b) Information Resources means information and related resources, such as personnel, equipment, funds, and information technology.
(c) Contractor employees working on this contract must complete such forms as may be necessary for security or other reasons, including the conduct of background investigations to determine suitability. Completed forms shall be submitted as directed by the Contracting Officer. Upon the Contracting Officer's request, the Contractor's employees shall be fingerprinted or subject to other investigations as required. All Contractor employees requiring recurring access to government facilities or access to CUI or information resources are required to have a favorably adjudicated background investigation prior to commencing work on this contract unless this requirement is waived under departmental procedures.
(d) The Contracting Officer may require the Contractor to prohibit individuals from working on the contract if the Government deems their initial or continued employment contrary to the public interest for any reason, including, but not limited to, carelessness, insubordination, incompetence, or security concerns.
(e) Work under this contract may involve access to CUI. The Contractor shall access and use CUI only for the purpose of furnishing advice or assistance directly to the Government in support of the Government's activities, and shall not disclose, orally or in writing, CUI for any other purpose to any person unless authorized in writing by the Contracting Officer. For those Contractor employees authorized to access CUI, the Contractor shall ensure that these persons receive initial and refresher training concerning the protection and disclosure of CUI. Initial training shall be completed within 60 days of contract award and refresher training shall be completed every 2 years thereafter.
(f) The Contractor shall include this clause in all subcontracts at any tier where the subcontractor may have access to government facilities, CUI, or information resources.
3. Evaluation Criteria In determining which proposal provides the best value to the Government, non-price (technical) evaluation factors are somewhat more important than evaluated price.
Technical Approach – 30% Experience – 30% Key Personnel – 30% Past Performance – 10% Based upon the results of the integrated assessment of the technical and cost/price proposals, the Government may make an award to other than the lowest-priced offeror or the offeror with the highest technical score if the source selection official determines that to do so would result in the best value to the Government.
3.1 Technical Evaluation Factors
3.1.1 Factor 1 – TECHNICAL APPROACH. The proposal will be evaluated on how the offeror intends to organize, staff and manage the contract and the means that will be used to accomplish the contract requirements. The degree to which the proposal demonstrates an understanding of the requirements will be evaluated, as well as the offeror’s planned management of consultants and subcontractors.
3.1.2 Factor 2 – EXPERIENCE. The offeror’s background, experience and qualifications will be assessed to determine the likelihood that the offeror can successfully perform the contract requirements and the degree of the risk of non-performance.
3.1.3 Factor 3 – KEY PERSONNEL. The education, experience and accomplishments of key personnel will be evaluated to determine the degree to which they possess the qualifications to perform the proposed duties under the contract.
3.1.4 Factor 4 – PAST PERFORMANCE. The offeror’s past performance on related contracts will be evaluated to determine, as appropriate, successful performance of contract requirements, quality and timeliness of delivery of goods and services, effective management of subcontractors, cost management, level of communication between the contracting parties, proactive management and customer satisfaction.
3.1.4.1 The Government reserves the right to assess the past performance of proposed subcontractors.
3.1.4.2 The Government will use its discretion to determine the sources of past performance information used in the evaluation and the information may be obtained from references provided by the offeror, the agency’s knowledge of contractor performance, other government agencies or commercial entities, or past performance databases.
3.1.4.3 If an offeror does not have a history of relevant contract experience, or if past performance information is not available, the offeror will receive a neutral past performance rating; however, an offeror without a history of relevant experience may receive a lowered rating for the experience evaluation factor.
3.2. Cost/Price Evaluation
3.2.1. The proposed prices/costs will be evaluated but not scored. The cost evaluation will determine whether the proposed costs are realistic, complete and reasonable in relation to the solicitation requirements. Proposed costs must be entirely compatible with the technical proposal.
3.2.2 The government may use the results of cost/price realism analysis to adjust the offeror’s proposal to a most probable cost to the Government. The analysis may include information from a government auditing agency, Government technical personnel, and other sources.
Discrep_25900_BJA_1124_750
1. Gas Turbine, Repair
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect all stator vanes from stage 1 through stage 11, renew some stator vane control components for the Gas Generator (S/N – GGA1263) on board the BERTHOLF.
NOTE
All piece numbers and figure numbers identified in this work item are from TP S9234-AD-MMO-070.
1.2 Government-furnished property.
| MTI |
| ITEM DESCRIPTION |
| NSN/PN |
| QTY |
| PRICE ($/UNIT) |
| N |
| Gasket, A Sump AOS, PN J219P06A, Pc 15, Fig 8-41 |
| NSN: 5330-01-041-5389 |
| 4 |
| N |
| Gasket, B Sump AOS, PN 1554M38P01, Pc 17, Fig 8-42 |
| NSN: 5330-01-412-1246 |
| 4 |
| N |
| Gasket, AOS Pump, PN MS27196-48, Pc 20, Fig 8-4 |
| NSN: 5330-00-928-2472 |
| 4 |
| N |
| Gasket, RT Vent, PN J219P09B, Pc 23, Fig 8-42 |
| NSN: 5330-01-294-6764 |
| 4 |
| N |
| Gasket, 8th Stg Vent, PN 9608M08G44, Pc 46, Fig -8-42 |
| NSN: 2835-00-598-3271 |
| 4 |
| N |
| Gasket, 8th Stg Vent, PN 9608M08G45, Pc 20, Fig 8-3 |
| NSN: 5330-01-454-8580 |
| 4 |
| N |
| Bolt, Clevis, PN J714P051A, Pc 32, Fig 8-8 |
| NSN: 5306-01-039-7504 |
| 14 |
| N |
| Nut, Clevis, PN LH8521-048, Pc 31, Fig 8-8 |
| NSN: 5310-00-109-9007 |
| 84 |
| N |
| PushRod, PN 9137M30P01, Pc 25, Fig 8-8 |
| NSN: 2840-01-036-2929 |
| 14 |
| N |
| Jam Nut, Pushrod, PN MS9201-04, Pc 27, Fig 8-8 |
| NSN: 5310-00-852-4246 |
| 14 |
| N |
| Jam Nut, Rodend, PN MS9201-02, Pc 28, Fig 8-8 |
| NSN: 5310-00-877-8374 |
| 14 |
| N |
| Bearing, Rodend, PN 1336M28P03, Pc 58, Fig 8-8 |
| NSN: 3120-01-447-1505 |
| 14 |
| N |
| Nut, Self Locking Pivot Point, PN 9629M48P10, Pc 16, Fig 8-8 |
| NSN: 5310-00-107-2229 |
| 2 |
| N |
| Arm, Lever Assembly, PN 9673M66G16, Pc 51, Fig 8-8 |
| NSN: 2840-01-464-8337 |
| 2 |
| N |
| Bolt, Shear Bridge to Rod End, PN J414P034A, Pc 29, Fig 8-8 |
| NSN: 5306-00-616-3541 |
| 14 |
| N |
| Washer, Flat Bridge to Rod End, PN 705B734P13, Pc 30, Fig 8-8 |
| NSN: 5310-01-200-6068 |
| 28 |
| N |
| Ring Segment, STG 3, PN 9662M41G27, Pc 85, Fig 8-59 |
| NSN: 2840-01-039-2083 |
| 1 |
| N |
| Nut, Self Locking Stage 3, PN 9644M72P01, Pc 3, Fig 8-59 |
| NSN: 5310-00-464-8573 |
| 100 |
| N |
| Sleeve Aligning, PN 9115M71P01, Pc 35, Fig 8-59 |
| NSN: 2835-01-014-6074 |
| 5 |
| N |
| Arm, Vane Actuation, Stage 3 Splitline, PN 9633M15G23, Pc 36, Fig 8-59 |
| NSN: 2840-00-110-5994 |
| 2 |
| N |
| Arm, Vane Actuation, Stage 3, PN 9633M14G23, Pc 37, Fig 8-59 |
| NSN: 2840-00-110-6017 |
| 3 |
| N |
| Sleeve, Actuation Arm, Stage 3 Splitline, PN 9606M45P01, Pc 38, Fig 8-59 |
| NSN: 3120-00-110-8877 |
| 2 |
| N |
| Sleeve, Actuation Arm, Stage 3, PN 9606M45P02, Pc 39, Fig 8-59 |
| NSN: 3120-00-110-8878 |
| 3 |
| N |
| Spacer, Vane Stage 3, PN 9146M80P02, Pc 38, Fig 8-59 |
| NSN: 3120-01-037-5391 |
| 5 |
| N |
| Washer, Vane, PN 9673M10P02, Pc 42, Fig 8-59 |
| NSN: 5310-00-108-1181 |
| 5 |
| N |
| Bushing, Flanged, PN 9673M11P02, Pc 43, Fig 8-59 |
| NSN: 3120-01-119-8807 |
| 46 |
| N |
| Bushing, Glass Backed, PN 9206M79P02, Pc 44, Fig 8-59 |
| NSN: 5310-01-119-3284 |
| 46 |
NOTE
All Coast Guard Drawings are restricted by the Arms Export-Control Act. See the Warning section in each drawing and technical publication for details.
2. REFERENCES
Coast Guard Drawings Coast Guard Drawing 418A-WMSL-100-001, Rev B, General Arrangements Coast Guard Drawing 418A-WMSL-801-001, Rev A, Booklet of General Plans Coast Guard Drawing 750-WMSL-259-032, Rev -, Prpln Gas Turbine Air Intake/Exhaust Diagram WMSL 750 Only.
Coast Guard Publications Coast Guard Technical Publication (TP) 7018, 2022, Main Gas Turbine Model 7LM2500-SM-MLG10 Installation Instructions.
Coast Guard Technical Publication (TP) S9234-AD-MMO-070, 2022, Propulsion Gas Turbine Module LM2500 Volume 3 Part 1 Illustrated Parts Breakdown Gas Turbine Assembly.
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures
Other References None
3. REQUIREMENTS
3.1 General.
3.1.1 CIR
None
3.1.2 Tech Rep. The Contractor must provide the services of a Qualified Technical Representative who is familiar with the GE LM-2500 to accomplish the following on site:
· Advise on manufacturer's system information.
· Supervise all work on this project
· Ensure compliance with manufacturer's procedures and standards during system disassembly, inspection, and reassembly as applicable.
3.1.2.1 Ensure the Tech Rep has experience with the system/equipment stated above and demonstrated on their résumé.
3.1.2.2 Submit the name and résumé of the Tech Rep to the COR at the Arrival Conference.
3.1.3 Protective measures - general. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).
3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:
Gas turbine components Gas turbine enclosure contents
3.1.5. References. The included references are the only ones that the USCG can provide to the Contractor, but they do not cover all of the necessary procedures to repair this issue. The Contractor may reference other work procedures that they have access to, but these procedures must be documented in the Work Plan.
3.1.6 Work Plan. The Contractors must submit a work plan with their SOLICITATION. Reference GE procedures as much as possible. This work plan will be in ADDITION to any documentation required to comply with the evaluation criteria in the GENERAL REQUIREMENTS section. Topics for the work plan must include, but are not limited to:
Methods, equipment and materials used to clean the stator vanes Methods, equipment and non-GFE materials used to renew the five bent arms Methods, equipment and non-GFE materials used to renew the bent actuation ring segment Methods, equipment and non-GFE material used to renew the actuation lever Methods, equipment and non-GFE material used to calibrate the system upon completion of work Methods, equipment and non-GFE material used to access the aforementioned areas.
3.1.7 Materials. The materials provided as GFE in Section 1.2 are not the only materials necessary to accomplish this work. Some of the material provided might not be necessary, and/or excess quantities might be provided. Any materials required to complete the work of this specification that are not provided as GFE, must be provided by the Contractor. If re-manufactured items are procured, then they must have been overhauled and inspected by General Electric or GE-authorized level 3 maintenance facility, and evidence of this provenance must be provided prior to installation of the equipment.
3.1.8. The gas turbine aboard the BERTHOLF uses Digital Fuel Control (DFC). Ensure that all procedures cited and materials used are appropriate for a DFC-equipped gas turbine. Some of the references included in this specification have mixed information that are applicable to a variety of engine control types.
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.2 Initial Operational Test. The Contractor must witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. The Gas Turbine itself cannot be operated, but any other equipment that is disturbed should be tested. Submit a CFR.
3.3. Clean and Inspect Stator Vanes. The contractor must clean and inspect all inlet vanes from the IGV through Stage 11 in accordance with the Contractor’s submitted plan. Report any discrepancies via CFR.
3.3.1. The vanes have a light coating of oil and diesel exhaust debris.
3.3.2. Cleaning must be conducted by hand.
3.3.3. The Contractor is responsible for any disassembly and associated reassembly required to accomplish this task. Renew all disturbed seals.
NOTE
The Stage 3 Ring Segment is a long lead-time item and is NOT provided as GFE
3.4. Renew Stage 3 Ring Segment, Stage 3. The Contractor must renew the damaged ring segment on stage 3 (Pc 85, Fig 8-59) and inspect the other ring segments up to stage 6 in accordance with the Contractor’s submitted plan. Report any discrepancies via CFR.
3.5. Renew Stage 3 Lever Arms. The Contractor must renew five of the damaged Stage 3 lever arms (Pc 36/37, Fig 5-59) and the associated hardware and packing (Pc 34, 35, 38, 39, 41, 44, 45, Fig 8-59). Inspect all lever arms from IGV to stage 6 (Pc 5, 46/50, 62/63, Fig 8-59) in accordance with the Contractor’s submitted plan. Report any discrepancies via CFR.
3.5.1 Two of the lever arms are the split line type, and three are not.
3.5.2 Thoroughly clean the hole resulting in the removed lever arm before renewing the lever arm assembly.
3.6. Renew Lever Assembly. The Contractor must renew the lever assembly (Pc 51, Fig 8-8) and associated hardware and pieces (Pc 16, 25, 27, 28, 29, 30, 31, 32, 58, Fig 8-8) in accordance with the Contractor’s submitted plan.
3.6.1. The Contractor must complete a variable stator vane schedule check.
3.6.2. The Contractor must provide evidence of proper calibration for all tools used in the schedule check.
3.7 Final Operational Test and Data Collection. The Contractor must witness Coast Guard personnel perform a final operational test of all items or shipboard devices that were disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR.
3.7.1. Final testing must include, but not be limited to the testing shown in section 6-4 and 6-5 of TP 7018.
3.8 Touch-up preservation. The Contractor must prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with SFLC Std Spec 6310, Appendix A (Cutter and Boat Exterior Painting Systems) and Appendix B (Cutter and Boat Interior Painting Systems), respectively, and as applicable. Abide by all touch-up requirements outlined in SFLC Std Spec 0000, Appendix A (Requirements for Preservation of Ship Structures).
4. NOTES
This section is not applicable to this work item.