This document contains a statement of work for a non-personal services contract to provide vessel charter services in Fort Lauderdale, Florida. The National Oceanic and Atmospheric Administration requires a research vessel of at least 80 feet capable of housing up to 12 divers and crew, along with three skiffs, to conduct queen conch population surveys from April 14-17, 2024. The selected contractor must ensure all vessels meet safety standards, provide accommodations and meals for divers and crew, fully provision the research vessel, fuel all vessels, captain the research vessel to survey locations as identified, provide a minimum of 16 scuba tanks daily and refill tanks from an onboard air compressor. The contractor must verify all deliverables in writing by specified due dates.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work National Oceanic and Atmospheric Administration (NOAA) National Marine Fisheries Service (NMFS) Southeast Fisheries Science Center/Population and Ecology Monitoring Division/Habitat Ecology Branch Queen Conch Population Surveys in Fort Lauderdale, FL (PR Number) (BAS AAP / CBOT Number)
Background:
A team from the Southeast Fisheries Science Center’s Habitat Ecology Branch (SEFSC HEB) is coordinating with the U.S. Army Corps of Engineers (USACE) to conduct queen conch population surveys around and offshore from Port Everglades in Fort Lauderdale, FL, to compile abundance and distribution data for a biological assessment required under the Endangered Species Act. In order to successfully complete this task, the entire impact area surrounding the port needs to be surveyed for the presence, spatial location, and abundance of individual conch. We plan to conduct these surveys from April 14-17, 2024. To facilitate efficient completion of surveys NMFS requires a live-aboard research vessel measuring at least 80 feet in length and capable of housing up to 12 divers and crew, which will serve as the primary base of operations during the surveys. The primary research vessel must also be capable of daily launching and retrieving of three small skiffs capable of carrying four SCUBA divers plus SCUBA tanks, fins, masks, BCDs, and survey equipment. The primary research vessel must have an inspected and certified air compressor onboard to refill SCUBA tanks each day.
Tasks:
The primary task that shall be completed is to provide and captain one live-aboard research vessel to specified locations offshore of Fort Lauderdale, FL, from April 14-17, 2024. Specific tasks are as follows:
· Task 1: The Contractor shall ensure that the primary research vessel and small skiffs meet USCG and NOAA small boat safety standards.
· Task 2: The Contractor shall provide living arrangements onboard the primary research vessel, to include meals and suitable sleeping accommodations, for up to 12 divers and crew.
· Task 3: The Contractor shall ensure the primary research vessel is fully provisioned for up to 12 divers and crew prior to the requested dates.
· Task 4: The Contractor shall fuel all vessels sufficiently prior to the requested dates and maintain appropriate fuel levels daily.
· Task 5: The Contractor shall captain the primary research vessel to specified locations around Fort Lauderdale, FL, as identified by the Project Lead.
· Task 6: The contractor shall provide a minimum of 24 SCUBA tanks each day during survey activities.
· Task 7: The Contractor shall refill SCUBA tanks with air daily, or on an as needed basis throughout each day of survey activities, from an inspected and certified compressor station located onboard the primary research vessel.
Deliverables:
Task 1: The Contractor shall ensure that the primary research vessel and small skiffs meet USCG and NOAA small boat safety standards.
Deliverables:
A. Email verification that primary research vessel and skiffs meet small boat safety standards to Project Lead upon completion.
Task 2: The Contractor shall provide living arrangements onboard the primary research vessel, to include meals and suitable sleeping accommodations, for up to 12 divers and crew.
Deliverables:
A. Provide lodging accommodations and meals for divers and crew.
B. Email verification of appropriate accommodations to Project Lead upon completion.
Task 3: The Contractor shall ensure the primary research vessel is fully provisioned for up to 12 divers and crew prior to the requested dates.
Deliverables:
A. Provision the primary research vessel with adequate food and beverages for all divers and crew anticipated to be onboard the vessel from April 14-17, 2024.
B. Email verification of completion to Project Lead prior to scheduled boarding date of April 14, 2024.
Task 4: The Contractor shall fuel all vessels sufficiently prior to the requested dates and maintain appropriate fuel levels daily.
Deliverables:
A. Fill all gas tanks for the primary research vessel and small skiffs.
B. Carry sufficient fuel onboard the primary research vessel to maintain fuel levels in small skiffs each day.
C. Email verification of completion to Project Lead prior to scheduled boarding date of April 14, 2024.
Task 5: The Contractor shall captain the primary research vessel to specified locations around Fort Lauderdale, FL, as identified by the Project Lead.
Deliverables:
A. While underway during the research cruise the Captain of the primary research vessel and the Project Lead will meet daily to confirm survey locations and plan movement and anchorage locations to facilitate deployment of small skiffs for dive surveys.
Task 6: The contractor shall provide a minimum of 16 SCUBA tanks each day during survey activities.
Deliverables:
A. Verify that the minimum number of SCUBA tanks are onboard the primary research vessel.
B. Email verification to Project Lead prior to scheduled boarding date of April 14, 2024.
Task 7: The Contractor shall refill SCUBA tanks with air daily, or on an as needed basis throughout each day of survey activities, from an inspected and certified compressor station located onboard the primary research vessel.
Deliverables:
A. Inspect air compressor and filling station.
B. Provide email verification to Project Lead and NOAA Unit Diving Supervisor at least two weeks in advance of scheduled boarding date of April 14, 2024.
1330-52.215-70 SCHEDULE OF DELIVERABLEs (2005)
The following is a schedule of all deliverables, including administrative deliverables, required during the period of performance of this contract:
| Item |
| Description |
| Quantity |
| Due Date |
| Deliver To |
| Reference |
| Task 1A |
| Verify primary research vessel and skiffs meet standard safety requirements |
| 4 |
| 2 weeks prior to start date |
| Project Lead |
| Deliverable 1A |
| Task 2A |
| Provide living arrangements for divers and crew |
| Varies |
| 24 hours prior to start date |
| Project Lead |
| Deliverable 2A |
| Task 2B |
| Verify accommodations are prepared |
| Varies |
| 24 hours prior to start date |
| Project Lead |
| Deliverable 2B |
| Task 3A |
| Fully provision research vessel with appropriate food and beverages for meals and snacks |
| Varies |
| 24 hours prior to start date |
| Project Lead |
| Deliverable 3A |
| Task 3B |
| Verify primary research vessel is fully provisioned |
| Varies |
| 24 hours prior to start date |
| Project Lead |
| Deliverable 3B |
| Task 4A |
| Fill all gas tanks |
| Varies |
| 24 hours prior to start date |
| Project Lead |
| Deliverable 4A |
| Task 4B |
| Properly store sufficient fuel to refill skiffs with fuel as needed |
| Varies |
| 24 hours prior to start date |
| Project Lead |
| Deliverable 4B |
| Task 4C |
| Verify fueling is complete |
| Varies |
| 24 hours prior to start date |
| Project Lead |
| Deliverable 4C |
| Task 5A |
| Discuss and select survey and anchorage locations for daily surveys |
| Varies |
| During period of performance |
| Project Lead |
| Deliverable 5A |
| Task 6A |
| Verify a minimum of 16 SCUBA tanks are onboard the primary research vessel |
| 16 |
| 24 hours prior to start date |
| Project Lead |
| Deliverable 6A |
| Task 6B |
| Refill SCUBA tanks with air as needed |
| Varies |
| During period of performance |
| Project Lead |
| Deliverable 6B |
| Task 7A |
| Inspect air compressor and filling station |
| 1 |
| 2 weeks prior to start date |
| Project Lead |
| Deliverable 7A |
| Task 7B |
| Provide verification of inspection and air quality |
| 1 |
| 2 weeks prior to start date |
| Project Lead & NOAA UDS |
| Deliverable 7B |
Qualifications:
The proposed vessel(s) and personnel must have the following experience and meet these basic requirements prior to and during the period of performance:
· Vessel Captain must have detailed knowledge and experience operating in the coastal waters of Fort Lauderdale, FL
· Vessel Captain must have appropriate USCG licenses
· Housing accommodations for up to 12 scientific divers and project crew
· Chef onboard the primary vessel
· Three small skiffs for carrying divers to multiple survey locations
· Air compressor and fill station for SCUBA tanks onboard
· A minimum of 16 SCUBA tanks
Performance Requirements Summary:
This contract includes a Performance Requirements Summary (PRS) and Quality Assurance Surveillance Plan (QASP). The PRS plays an integral role in the administration of the contract. In addition to any applicable inspection clauses or other related terms and conditions contained in the contract, the PRS shall serve as a primary tool for inspection and acceptance of services as facilitated by the Contracting Officer’s Representative (COR). Evaluation of the Contractor’s overall performance shall be in accordance with the performance standards set forth in the PRS, and will be conducted by the COR. The PRS constitutes a material aspect of the contract and will not be changed or otherwise modified without prior written approval of the Contracting Officer.
| Required Service and Designation |
| Desired Outcome |
| Performance Standard |
| Acceptable Quality Level |
| Monitoring Method |
| Incentive/ Disincentive |
| Task 1 |
| Deliverable 1A |
| Safety standards are met and any deficiencies are corrected |
| Performance standard is a requirement for vessel charters and must be met |
| COR will solicit feedback from requesters |
| Material-contract will not be awarded |
| Task 2 |
| Deliverables 2A and 2B |
| Suitable accommodations are provided and verified by the date requested |
| Performance standard must be met |
| COR will solicit feedback from requesters |
| Material-poor performance evaluation |
| Task 3 |
| Deliverables 3A and 3B |
| Provisions for divers and crew are provided and verified by the date requested |
| Performance standard must be met at a 95% level |
| COR will solicit feedback from requesters |
| Material-poor performance evaluation |
| Task 4 |
| Deliverables 4A, 4B, and 4C |
| Fuel requirements are met and verification provided by date requested |
| Performance standard must be met at a 95% level |
| COR will solicit feedback from requesters |
| Material-poor performance evaluation |
| Task 5 |
| Deliverable 5A |
| Meetings are held as needed |
| Performance standard must be met at a 95% level |
| COR will solicit feedback from requesters |
| Material-poor performance evaluation |
| Task 6 |
| Deliverables 6A and 6B |
| Provide minimum number of SCUBA tanks requested and verify by the date requested |
| Performance standard must be met at a 95% level |
| COR will solicit feedback from requesters |
| Material-poor performance evaluation |
| Task 7 |
| Deliverables 7A and 7B |
| Air compressor is inspected and verified by the date requested |
| Performance standard is a requirement for NOAA dive operations and must be met |
| COR will solicit feedback from requesters |
| Material-contract will not be awarded |
Confidentiality and Data Privacy:
This contract may require that services contractors have access to Privacy Information. Services contractors are responsible for maintaining confidentiality of all subjects and materials and may be required to sign and adhere to a Non-disclosure Agreement (NDA).
Government Furnished Resources:
The Government will not furnish any resources to the Contractor in support of this contract.
Place of Performance:
Work will be conducted at other than the government facility (i.e. off-site).
Overtime, Travel, and Training:
Overtime, travel, and training are not authorized under this contract.
Additional information:
What is the assigned risk level and IT Security designation?
There is no assigned risk level and no IT Security designation required for this project.
Is there intellectual property or data rights involved?
No
Period of Performance? Options?
Period of performance: April 1 – April 17, 2024
Do you need a post-conference meeting/kickoff?
No
Are there mandatory Core/’available’ hours?
No