SOW_108 Purnell Roof.doc
DOC document 60 KB Posted
- Attached to
- Replace Roof Federal contract opportunity
- Solicitation number
- 37510PRQ240000011
About this file
This document is a Statement of Work (SOW) for a federal contract opportunity to replace the roofing system on USCG Owned Housing located at 108 Purnell St., Berlin, MD 21811. The work consists of removing and hauling away the existing roofing system down to plywood, furnishing and installing all necessary materials for a standard 25-year architectural home roofing system. All bidders are strongly encouraged to visit the site to verify quantities before submitting bids. The contract requires the work to commence within 5 days of the notice to proceed and be completed within 10 working days of contract award. The designated Contracting Officer's QAE Representative is Cody Wood, CWO2, who must be contacted for any inquiries or to arrange for site visits and inspection/acceptance of the completed work. Contractors must comply with all federal, state, and local safety and environmental regulations, and provide required documentation to the SFO Safety Officer and Environmental Protection Specialist prior to starting work.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF-18 RFQ.pdf | ||
| WDOL.pdf | ||
| CONSTRUCTION DAVIS-BACON SERVICE CONTRACT ACT.pdf | ||
| Construction Clauses and Provisions FAC 2023 01.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
8/13/2014
SCOPE OF WORK
1. GENERAL REQUIREMENTS: The work consists of providing all labor, materials and equipment as required to replace the roofing system on USCG Owned Housing located at 108 Purnell St., Berlin, MD 21811.
2. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK: Upon acceptance the contractor shall commence work NLT five (5) days after notice to proceed and work diligently to complete the entire work ready for use by 10 working days after contract award.
3. SCOPE OF WORK:
3.1. Remove and haul away existing roofing system down to plywood.
3.2. Furnish all materials for standard home roofing system.
3.3. Install all necessary items for a standard home roofing system using 25-year architectural shingles.
4. SITE VISIT: All bidders are strongly encouraged to visit the site to field verify any/all quantities before submitting bids. Interested parties shall make arrangements for a site visit with Cody Wood, CWO2 @ 757-894-8570.
5. DESIGNATED CONTRACTING OFFICER’S QA EVALUATOR (QAE) REPRESENTATIVE: The designated contracting officer’s QAE representative and Point of Contact for this project is Cody Wood, CWO2 @ 757-894-8570. Inquiries concerning any phase of the specification before or after award shall be made to Cody Wood, CWO2 @ 757-894-8570.
6. CONDITIONS AFFECTING THE WORK: The Offeror should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, the general and local conditions which can affect the cost of the work thereof. Failure to do so will not relieve bidders from responsibility for estimating properly the difficulty or cost of successfully performing the work. The government will assume no responsibility for any understanding or misrepresentations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the request for quotes, the specification or related documents.
7. AFTER AWARD OF THE CONTRACT: The contractor must immediately notify the contracting officer’s QAE representative of his intended start date. The work shall be done in accordance with the specification.
8. ORAL MODIFICATION: No oral statement of any person other than the contracting officer shall in any manner or degree, modify or otherwise affect the terms of this contract.
9. WORKMANSHIP: All work shall be accomplished with the best standard practices, and by workmen thoroughly experienced in the required trades. The work shall be supervised by experienced personnel and shall be satisfactory to the Contracting Officer.
10. PERMITS: The contractor shall without additional expense to the government, obtain all appointments, licenses, and permits required for the prosecution of the work. The contractor shall comply with all applicable federal, state and local laws.
11. CLEAN UP: All trash and debris shall be removed from the site daily. The job site shall be left in a clean and neat manner.
12. WORK OUTSIDE REGULAR HOURS: If the contractor desires to carry on work on Saturday, Sunday, holidays or outside the station’s regular hours, he may submit his request in writing to the Contracting Officer’s QAE Representative for approval consideration. The contractor shall allow ample time to enable satisfactory arrangements to be made by the government for inspecting the work in progress.
13. UPON COMPLETION OF WORK: Contact the Contracting Officer QAE Representative to arrange for inspection/acceptance of work.
14. SAFETY REQUIREMENTS:
14.1. RESPONSIBILITIES:
14.1.1. All contractors working on CG SFO Eastern Shore shall abide by all federal safety regulations as published by the Occupational Health and Safety Administration, 29 CFR 1910 (series) and 29 CFR 1926 (series). Contractor written safety programs shall be reviewed by the SFO Safety Officer prior to starting work.
14.1.2. Written notification must be provided to the SFO Safety Officer, Cody Wood, CWO2 @ 757-894-8570 in their capacity as SFO Fire Marshal of any activity that could potentially cause fire or explosion or that changes or reduces the capability of fighting a fire or explosion. Some examples of qualifying activities are: a fire hydrant or fire suppression system that must be taken out of service for any reason, electrical work that affects fire alarm systems, introduction of hazardous or flammable material onto the Base, and blocking of any egress routes or emergency vehicle routes. Inclusion of this information in the contract constitutes written notification as long as the outsource review sheet is signed by SFO Safety Officer.
14.1.3. Copies of the following must be provided to the SFO Safety Officer prior to starting work in affected areas: Confined Space Entry Permits, Hot Work Chits, and Dig Chits. Confined space clearance must be conducted by a certified marine chemist and permit required spaces will have a copy of the permit posted on site during work. Hot work will only be conducted with permission and a fire watch must be posted during work. A facility dig chit is required in addition to a Miss Utility dig chit. The systems on SFO Eastern Shore are not limited to what the City of Chincoteague has on file. In order to ensure electrical safety and integrity of systems, a facility chit is required.
14.1.4. Lock Out/Tag Out requires notification and coordination with facilities and will not be conducted by a contractor on SFO Eastern Shore. A Facilities Division representative is required for all contractor Lock Out/Tag Out needs.
14.2. RIGHTS:
14.2.1. Every employee working on Base Portsmouth has the right to a safe and healthy work place. The contractor has the responsibility and right to stop unsafe work. QAE’s and the Safety Officer may also institute a work stoppage relating to unsafe practices or immediate danger to life and health situations.
15. ENVIRONMENTAL PROTECTION REQUIREMENTS:
15.1. All contractors working on CG SFO Eastern Shore or CG Property shall abide by all federal environmental regulations as published by the Environmental Protection Agency, 40 CFR (series). Contractor written environmental management and pollution prevention programs shall be reviewed by the Environmental Protection Specialist, Chris Ollice (757.483.8593 or C 757.373.2558) prior to starting work and must be in accordance with ICSPORTSVA INSTM5090.2, the Unit Environmental Guide.
15.2. Written notification must be provided to the Environmental Protection Specialist of any activity that could potentially cause a permit violation on Base Portsmouth. Some examples of qualifying activities are: any activity that could result in a spill or discharge into a waterway or introducing a hazardous material into the environment.
15.3. Copies of the following must be provided to the Environmental Protection Specialist prior to starting work in affected areas: Material Safety Data Sheets, permits, and notices of intent.
15.4. Hazardous materials used by a contractor are required to be disposed of by that contractor. Disposal must be in accordance with federal, state, and local guidelines.
File details come from the government source that posted it. Updated .