Southwest Area Right of Way Improvements Quantities Bid Sheet.xlsx

XLSX spreadsheet 148 KB Posted

Attached to
Southwest Area Right of Way Improvements
Solicitation number
2025-5
Issued by
Rio Blanco County, Colorado

About this file

The provided file is a detailed Bid Quantities Worksheet for the Southwest Area Right of Way Improvements project by the Town of Telluride, Colorado. The comprehensive bid sheet covers an extensive range of infrastructure improvement items, including 64 distinct line items for activities such as clearing and grubbing, structure and pavement removal, excavation, erosion control, utility resets, landscaping, roadway construction, drainage improvements, electrical work, and signage installation. The project encompasses infrastructure improvements along West Pacific Avenue between South Mahoney Drive and South Davis Street, and on South Davis Street between West Pacific Avenue and West Colorado Avenue, with specific quantities noted for each item, such as removing 27 trees, 1,671 square yards of concrete pavement, installing 29 trees, 12 shrubs, 2,067 square yards of concrete sidewalk, and 12 street lights.

The bid sheet does not explicitly list pricing or total project cost, with unit prices left blank, though an engineer's estimate is referenced. The project appears to be fully funded and prepared for bid, with comprehensive line items suggesting a thorough approach to infrastructure renewal. The scope involves complete street reconstruction, including utility modifications, stormwater management, pedestrian infrastructure improvements, and transit route enhancements. Key quantities include 2,190 cubic yards of excavation, 910 tons of hot mix asphalt pavement, 330 linear feet of reinforced concrete pipe, and extensive erosion control measures. The project includes specialized elements like a Telluride seed mix, root barriers, and specific curb and gutter treatments, indicating a detailed and localized approach to urban infrastructure improvement.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Clean

SOUTHWEST AREA RIGHT OF WAY IMPROVEMENTS
BID QUANTITIES
ITEM NO.CONTRACT ITEMUNITQTYUNIT COSTEXTENSION
201-00002CLEARING AND GRUBBINGLS1$ -
202-00000REMOVAL OF STRUCTURES AND OBSTRUCTIONSLS1$ -
202-00010REMOVAL OF TREEEA27$ -
202-00019REMOVAL OF INLETEA7$ -
202-00021REMOVAL OF MANHOLEEA1$ -
202-00033REMOVAL OF PIPE (CMP ARCH CULVERT)EA2$ -
202-00035REMOVAL OF PIPELF50$ -
202-00210REMOVAL OF CONCRETE PAVEMENT (INLC. SIDEWALKS, C/G, MEDIANS & VALLEY GUTTERS)SY1671$ -
202-00220REMOVAL OF ASPHALT MATSY3843$ -
202-00700REMOVAL OF LIGHT STANDARDEA8$ -
202-00806REMOVAL OF WALKWAY (GRAVEL PEDESTRAIN TRAIL)LF600$ -
202-00810REMOVAL OF GROUND SIGNEA12$ -
202-05026SAWING ASPHALT MATERIAL (6 INCH)LF336$ -
203-00000UNCLASSIFIED EXCAVATION (COMPLETE IN PLACE)CY2190

Jackie English: Jackie English:

2220cy from corridors minus 790cy from removals (concrete 275cy (assumed 6" depth), asphalt 440cy (assumed 4" depth), gravel 75cy (assumed 6" depth))$ -
203-00060EMBANKMENT MATERIAL (COMPLETE IN PLACE)CY200$ -
203-01596POTHOLINGHR20$ -
206-00300STRUCTURE BACKFILL (CLASS 2)CY10$ -
207-00210TOPSOILCY142$ -
208-00000EROSION CONTROLLS1$ -
208-00012EROSION LOG TYPE 1 (9 INCH)LF755$ -
208-00020SILT FENCELF377$ -
208-00035GRAVEL BAGLF60$ -
208-00045CONCRETE WASHOUT STRUCTUREEA1$ -
208-00051STORM DRAIN INLET PROTECTIONLF200$ -
208-00070VEHICLE TRACKING PADEA5$ -
210-00030RESET WATER VALVE TO FINISHED GRADEEA6

Jackie English: Jackie English:

2 W. PACIFIC

6 S. DAVIS$ -
210-00050RESET FIRE HYDRANTEA1

Jackie English: Jackie English:

1 S. DAVIS$ -
210-00810RESET GROUND SIGNEA3$ -
210-04015MODIFY MANHOLEEA6

Jackie English: Jackie English:

4 W. PACIFIC

2 S. DAVIS

Jackie English: Jackie English:

2220cy from corridors minus 790cy from removals (concrete 275cy (assumed 6" depth), asphalt 440cy (assumed 4" depth), gravel 75cy (assumed 6" depth))$ -
210-04050ADJUST VALVE BOX (PRV VAULT)EA1$ -
210-00055RESET UTILITY PAD-MOUNTED TRANSFORMEREA1

Jackie English: Jackie English:

1 W. PACIFIC$ -
212-00005TELLURIDE SEED MIXSF2700$ -
212-00050SODSF8930$ -
213-00000MULCHINGCY10$ -
213-00212TREE PROTECTIONLF670$ -
213-00213ROOT BARRIERLF450$ -
214-00220TREE (2 INCH CALIPER)EA29$ -
214-00301SHRUBEA12$ -
304-06007AGGREGATE BASE COURSE (CLASS 6)CY1033$ -
403-00720HOT MIX ASPHALT PATCHTON10$ -
403-32600HOT MIX ASPHALT PAVEMENT (5 INCH)TON910$ -
504-03500RETAINING WALLFF500$ -
506-00209RIPRAP (9 IN)CY4$ -
603-0218523x14 INCH REINFORCED CONCRETE PIPE ELLIPTICALLF330$ -
603-0511823x14 INCH REINFORCED CONCRETE END SECTION ELLIPTICALEA3$ -
604-00305INLET TYPE-CEA2$ -
604-13005INLET TYPE-13EA1$ -
604-16005INLET TYPE-16EA4$ -
604-30005MANHOLE (48" DIAM)EA2

Jackie English: Jackie English:

1 SDMH

1 SSMH (REMOVE/REPLACE)

Jackie English: Jackie English:

2 W. PACIFIC

6 S. DAVIS$ -
604-39000MANHOLE SPECIAL (48-IN DRYWELL)EA3$ -
605-82200FRENCH DRAINLF707$ -
608-00006CONCRETE SIDEWALK (6 INCH)SY2067$ -
608-00010CONCRETE CURB RAMPSY185$ -
608-00015DETECTABLE WARNINGSSF265$ -
608-01600AGGREGATE WALKWAY (CRUSHER FINES)CY1$ -
609-23000GUTTER TYPE 2 (SPECIAL) (VALLEY GUTTER)LF65$ -
609-21020CURB AND GUTTER TYPE 2 (SECTION II-B)LF1100$ -
609-21023CURB AND GUTTER TYPE 2 (SECTION II-B) (SPECIAL) (REJECT)LF1100$ -
609-21025BARRIER CURBLF31$ -
609-21900CURB AND GUTTER TYPE 2 (SPECIAL) (TOWN OF TELLURIDE)LF370$ -
610-00020MEDIAN COVER MATERIAL (PATTERNED CONCRETE)SF1228$ -
613-002002 INCH ELECTRICAL CONDUIT (DIRECT BURIAL)LF4540$ -
613-07001TYPE ONE PULL BOXEA14$ -
613-10000WIRINGLS1$ -
613-16010STREET LIGHT, FOUNDATION, AND JUNCTION BOX (INSTALLATION)EA12$ -
614-00026SIGN PANEL (CLASS I)EA21$ -
614-00041SIGNPOSTEA21$ -
620-00020FIELD OFFICE (CLASS 1)EA1$ -
622-00010SANITARY FACILITYEA1$ -
623-006022 INCH PLASTIC PIPE (IRRIGATION/SLEEVE)LF358$ -
625-00000CONSTRUCTION SURVEYINGLS1$ -
626-00000MOBILIZATIONLS1$ -
630-00017TRAFFIC CONTROL MANAGEMENT (SPECIAL)LS1$ -
670-00000ELECTRICAL SYSTLS1$ -
TOTAL$ -

ENGINEER'S ESTIMATE OF CONSTRUCTION COST

100% ISSUED FOR BIDESTIMATE OF PROBABLE CONSTRUCTION COST
IFB&G

Page &P of &N &G image1.jpeg

File details come from the government source that posted it. Updated .