South Ellerbe Restoration Phase 3B Stream and Wetland Restoration.pdf
PDF 50 MB Posted
- Solicitation number
- 17-1114
- Issued by
- Durham County, North Carolina
About this file
This is a construction project scope of work document for Durham County, North Carolina, detailing Phase 3B of the South Ellerbe Stream and Wetland Restoration project located at 808 W Trinity Avenue, Durham. The project requires the contractor to furnish all materials, labor, equipment, and tools necessary for comprehensive stream and wetland restoration, including stormwater outfall modifications, construction of an earthen embankment with water control structure, retaining walls, greenway trail, maintenance path, pedestrian plazas, and hardscaped areas as specified in the Construction Drawings. The contractor is fully responsible for delivery and completion of all project elements on site. Proposals are due November 17, 2026.
The solicitation does not specify an estimated contract value, set-aside or preference program, incumbent contractor information, detailed evaluation criteria, or a comprehensive procurement timeline beyond the proposal submission deadline. No information regarding pricing terms, funding sources, site visit schedules, or bidder's conferences is detailed in the available documentation. The scope emphasizes that all work must be performed in accordance with the Construction Drawings and project specifications provided by Durham County.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .