Addendum 1 to South Creek Park Pool House MEP Rebid

This is Addendum 1 to the bid documents for the South Creek Park Pool House Mechanical, Electrical, and Plumbing (MEP) project issued by the Town of Evans, Erie County, New York, dated November 10, 2026. The addendum addresses four key bid-related inquiries and implements corresponding document updates. The project involves the construction of mechanical/HVAC, electrical, and plumbing systems for a new 1,270-square-foot pool house located at 1525 South Creek Road in Derby, New York. Sealed bids are due November 13, 2026. The work is divided into four contract categories: C-01 General Construction Trades, C-02 Mechanical Work (HVAC & Gas), C-03 Electrical Work, and C-04 Plumbing Work. Contractors' qualified design professionals hold delegated design responsibility for mechanical, electrical, plumbing, and structural systems, with all delegated design documents subject to architect and engineer review before fabrication or installation.

The addendum clarifies that the Bid Bond requirement has been removed from the project, though a Performance Bond remains required in an amount of not less than five percent (5%) of the total contract bid from a surety company or domestic carrier licensed in New York. Mechanical and HVAC drawings are not included in the bid documents; contractors must prepare these designs as part of delegated design responsibilities. Contractors must also prepare and submit outline specifications for their respective MEP scopes of work for client review and approval to confirm compliance with project requirements and applicable standards. No set-asides or preference programs have been identified for this procurement, and no identical or substantially similar contracts have been awarded within the past five years.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Town of Evans, Erie County, State of New York

SOUTH CREEK POOL HOUSE PROJECT

MECHANICAL, ELECTRICAL, & PLUMBING REBID

ADDENDUM 1 – 11.10.2026

ADDENDUM #1

A – BID RFI RESPONSES

B – BID DOCUMENT UPDATES

A. BID RFI RESPONSES:

1. Is a Bid Bond required for this project?

Response:

No. The Bid Bond requirement has been removed from the project. However, a Performance Bond will still be required in accordance with the requirements outlined in the Bid Documents.

2. Are there Mechanical / HVAC drawings or is this a design build?

Response:

Mechanical/HVAC drawings are not included in the Bid Documents. The mechanical/HVAC systems shall be designed by the Contractor as delegated design. The Contractor shall be responsible for preparing and submitting the necessary design documents and specifications for review and coordination with the project team, in accordance with the requirements outlined in the Bid Documents.

3. Are there performance specifications?

Response:

Outline specifications shall be prepared and submitted by the Contractor for review and approval by the Client to confirm compliance with the project requirements and applicable standards. As outlined in the Bid Book (Section 013100-D-2):

“Mechanical, Electrical, and Plumbing (MEP) Contractors shall prepare and submit outline specifications for their respective scopes of work for review and coordination with the project team.”

B. DOCUMENT UPDATES:

1. Revision to Notice to Bidders

Remove Bid Bond Requirement and revise paragraph “The selected Prime Contractor shall obtain a performance bond upon award, directly from a surety company or a domestic carrier licensed to do business in the State of New York in the amount of not less than five percent (5%) of the amount of the total contract bid submitted. The Prime Contractor and/or subcontractor(s) must demonstrate the experience level for the various work elements included in the bid documents.”