The document is a Sources Sought Survey and Request for Information (RFI) related to a federal contract opportunity for the Sebewaing River South Levee Repairs project in Sebewaing, Michigan. The U.S. Army Corps of Engineers Detroit District is seeking firms capable of mobilizing equipment and machinery to clear vegetation, install steel sheet piles, install earth anchors, and backfill/grade the project site. The North American Industry Classification System (NAICS) code is 237990, with a small business size standard of $45 million. The estimated contract value is between $10,000,000 and $25,000,000, and the contract is anticipated to be solicited in Summer/Fall 2024. The RFI includes questions regarding methods for 40-foot-long sheet pile installation, the preferred installation method, minimum equipment size, and maximum crane reach required for the project. Interested firms are directed to submit the completed Sources Sought Information Survey and respond to the RFI questions by May 31, 2024.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOURCES SOUGHT SURVEY INFORMATION

OM Sebewaing River South Levee Repairs, MI

1. Company Information

Company Name:

Company Address:

Unique Entity Identifier:

CAGE Code:

POC Name, Phone Number, and Email:

2. NAICS Code: 237990 - Business Size Standard of $45M

Do you concur with the identified NAICS Code for this requirement? If not, what suggested NAICS code would you recommend?

3. Socio‐economic status for NAICS Code 237990 (Check all that apply):

☐ Large Business ☐ Small Business ☐ Small Disadvantaged Business (SDB) ☐ 8(a) Small Business ☐ Veteran‐Owned Small Business (VOSB) ☐ Service‐Disabled Veteran‐Owned Small Business (SDVOSB) ☐ HUBZone Small Business (HUBZone) ☐ Woman‐Owned Small Business (WOSB)

4. Do you have any insurance limitations?

☐ Yes ☐ No

5. Bonding Capability

Individual Contract Bonding Capacity: $__________________________ Aggregate Contract Bonding Capacity: $_________________________

6. Past Project Examples

Provide descriptions of three (3) projects completed within five (5) years of the date of this notice that demonstrates experience, as a prime or subcontractor, similar to the requirements of this project. Include the following in the description:

Project 1:

Project Name:

Contract Number (if applicable):

Year Completed:

Prime Contractor or Sub-Contractor:

Type and percentage of work self-performed (based on contract value):

Dollar Amount: $ General Description of project:

Project 2:

Project Name:

Contract Number (if applicable):

Year Completed:

Prime Contractor or Sub-Contractor:

Type and percentage of work self-performed (based on contract value):

Dollar Amount: $ General Description of project:

Project 3:

Project Name:

Contract Number (if applicable):

Year Completed:

Prime Contractor or Sub-Contractor:

Type and percentage of work self-performed (based on contract value):

Dollar Amount: $ General Description of project:

7. Company Capability:

Provide a descriptive statement of the company’s capability to perform this work at this location.

8. If this requirement is advertised, do you anticipate submitting an offer?

9. Please provide any additional information you feel is necessary:

Request for Information (RFI)

1.) What methods for 40-foot-long sheet pile installation exist for an alignment with limited land access, low clearance under adjacent waterway bridges, and shallow water depths (2’ to 6’)?

2.) What is the preferred method of installation for 40-foot-long sheet piles, where the clear ground surface area between shoreline and structures is approximately 30 feet and the water depth in the waterway ranges from approximately 2 to 6 feet?

3.) What is the minimum equipment size to install 40-foot-long sheet piles into a very stiff to hard clay strata?

4.) What is the maximum reach of the crane required to install 40-foot-long sheet piles into a hard clay stratum?