Sources Sought Response Form 21DEC2023.pdf
PDF 1 MB Posted
- Solicitation number
- W9127S24Q6001
About this file
This document is a sources sought response form for initial outfitting and transition services of a veterinary treatment replacement project at Camp Pendleton, California. The form requests business identifying information, capabilities and past project experience for a firm interested in bidding on the solicitation. Required capabilities include architects, engineers, technicians and various specialists with experience in healthcare facility planning, construction, mechanical and electrical systems. Firms must indicate if they can provide these capabilities in-house or via subcontracting. The related federal contract opportunity is for initial outfitting and transition-in-occupancy of a new veterinary treatment facility at Camp Pendleton to replace the existing one. The solicitation will be issued by the Department of the Army Corps of Engineers Engineering District Little Rock. Firms completing the sources sought response form express interest in bidding on the solicitation and must meet requirements for small business participation and subcontracting limitations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOURCES SOUGHT - VTF Camp Pendleton Requirement.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project: Initial Outfitting and Transition Services of a Veterinary Treatment Replacement Project at Camp Pendleton, California
Business Name & Address:
DUNS Number: CAGE Code:
Point of Contact (POC) Name:
Phone :
E-Mail Address:
Business Size: Mark ALL That Apply
Capabilities:
Provide examples of the firm's capability to perform a contract of this magnitude and complexity (include contracts performed with a similar scope and comparable work performed within the past 5 years. Provide at least 3 examples below.
Sources Sought U.S. Army Corp of Engineers
Little Rock District
Small Business
SBA Certified 8A Program Participant
SBA Certified Historically Underutilized Business Zones (HUB-Zone)
Service-Disabled Veteran-Owned Small Business (SDVOSB)
Woman-Owned Small Business (WOSB)
PROJECT 1
Include a brief description of the project, customer name, timeliness of performance, customer satisfaction, and dollar value of the project.
PROJECT 2
PROJECT 3
Please check to indicate the firm’s capability to provide (either in-house or sub-contracted) the following required disciplines:
____Architect (ten years + experience in the planning and/or design of healthcare facilities required)
____Building Information Modeling (BIM) Specialist
____CADD Specialist
____Commissioning Agent
____Construction Quality Assurance Representative
____Construction Technician
____Engineer, Anti-Terrorist/Force Protection (AT/FP)
____Engineer, Civil
____Engineer, Construction
____Engineer, Cost (experienced with military breakdown formats for estimates and familiar with preparation of detailed cost estimating procedures and construction schedules)
_____Engineer, Electrical (with expertise in (but not limited to) low voltage systems, telecommunications, data systems, and electrical control systems) _____Engineer, Environmental
____Engineer, Fire Protection
____Engineer, Geotechnical
____Engineer, Mechanical (experience in medical gas systems required)
____Engineer, Structural
____Engineer, Value (Certified)
____Engineering Technician
____Environmental Design Personnel (Registered)
____Environmental Survey Personnel (asbestos, lead based paint, soil, etc.)
____Geologist
____Industrial Hygienist
____Interior Designer
____Life Safety Specialist
____Medical Equipment Planner
____Professional Land Surveyor (Registered) & Survey Crew
____Program Manager
____Project Manager
____Project Scheduler (with experience in Primavera)
____Quality Control Manager
____Technical Writer
____Health Care Planner (three years + experience in the use of the following systems:
Medical Expense and Performance Reporting System (MEPRS), Center for Health Care Strategies
(CHCS), Managed Care Forecasting and Analysis System (MCFAS), and M2 Information Systems)
Small Businesses are Reminded: In accordance with FAR 52.219-14, Limitations on Subcontracting, at least 50% of the cost of contract performance incurred for personnel shall be expended for employees of the concern.
Statement of Interest:
Yes, this firm is interested in bidding on the solicitation when it is issued.
Additional Comments:
Form Completed by Name & Title:
Signature:
| business name and address: |
| project 2: |
| project 3: |
| project 1: |
| additional comments: * |
| CAGE: |
| DUNS: |
| PHONE: |
| EMAIL ADDRESS: |
| BOX PG1: |
| 0: Off |
| 1: Off |
| 2: Off |
| 3: Off |
| 4: Off |
| BOX PG3: Off |
| Check Box11: |
| 0: Off |
| 1: Off |
| 2: Off |
| 3: Off |
| 4: Off |
| 5: Off |
| 6: Off |
| 7: Off |
| 8: Off |
| 9: Off |
| 10: Off |
| 11: Off |
| 12: Off |
| 13: Off |
| 14: Off |
| 15: Off |
| 16: Off |
| 17: Off |
| 18: Off |
| 19: Off |
| 20: Off |
| 21: Off |
| 22: Off |
| 23: Off |
| 24: Off |
| 25: Off |
| 26: Off |
| 27: Off |
| 28: Off |
| 29: Off |
| 30: Off |
| 31: Off |
| poc name: |
| name & title: |
File details come from the government source that posted it. Updated .