Sources Sought Questionnaire.pdf
PDF 339 KB Posted
- Attached to
- FMC Fort Worth- Replace Medium Voltage Lines and Switchgear- Sources Sought Federal contract opportunity
- Solicitation number
- 15B50924PR000159
About this file
This sources sought questionnaire from the Federal Bureau of Prisons Field Acquisition Office requests information from contractors interested in replacing medium voltage lines and switchgear at the Federal Medical Center Fort Worth. Contractors are asked to provide their NAICS code, business size, subcontracting plans, small business program eligibility, performance and proposal timeframes, and security clearance timelines. Interested vendors must respond to the questionnaire by March 19, 2024 and register in SAM.gov under NAICS 238210 with a small business size standard of $19 million. The subsequent solicitation will be distributed through SAM.gov and award a firm-fixed-price construction contract between $5-10 million to install a new radial loop including conduit, cables, pull boxes, duct banks, excavation and boring at the Federal Correctional Complex Fort Worth by 560 calendar days after award.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sources Sought Questionnaire.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Department of Justice Federal Bureau of Prisons Field Acquisition Office
U.S. Armed Forces Reserve Complex Grand Prairie, Texas 75051
March 7, 2024
Sources Sought Questionnaire Field Acquisition Office Building and Facilities Section (B&F) Federal Medical Center Fort Worth Sources Sought 15B50924PR000159
The Federal Bureau of Prisons is conducting market research in accordance with Federal Acquisition Regulation, Part 10. A single solicitation will be issued for Replace Medium Voltage Lines and Switchgear. The Federal Bureau of Prisons (FBOP), Federal Medical Center Fort Worth (FMC Fort Worth) located at 3150 Horton Road, Fort Worth, TX 76119, intends to make a single award to a responsible entity that will provide all necessary equipment, labor, materials, and incidentals to replace existing medium voltage lines and switchgear. The contractor is responsible to install a new radial loop to include installation of associated conduit, cables, pull boxes, duct banks and excavation and boring. It is the contractor’s responsibility to obtain permitting, should it be required. All manufacturer’s recommendations will be required to be implemented.
This sources sought questionnaire is for information purposes only. The described requirement may or may not be included in the subsequent solicitation.
A summary of the requirements is as follows: The contractor will install a new radial loop to include installation of associated conduit, cables, pull boxes, duct banks and excavation and boring.
Please answer the following questions:
1. Can your firm provide Replace Roofs at the institution specified above?
__________ Yes ___________ No
2. If you answered “No” in Question 1 above, what construction requirements can your firm provide?
3. The North American Industrial Classification System (NAICS) code for Electrical Contractors is 238210, which sets the small business standard at $19.0 million.
Based on this standard, what is your business size, small or large?
__________ Small ___________ Large
4. What level of subcontracting, if any, would your firm utilized to provide the listed requirement?
5. Are you eligible for participation in one of the following small business programs? If so, please indicate the program.
__________ “8(a)” Program __________ Women-Owned Small Business concern __________ Economically Disadvantaged Women-Owned Small Business concern __________ HUBZone Small Business concern __________ Veteran-Owned Small Business concern __________ Service-Disabled Veteran-Owned Small Business concern
6. The Performance Period estimated for this project is 560 calendar days. Does this time frame appear to be suitable for your firm to complete the requirement?
________Yes ________No
If not, what time frame in calendar days would it take your firm to complete?
___________Calendar Days
7. How many calendar days does your firm need to prepare a proposal resulting from this solicitation?
_____________ 45 days _____________ 60 days
8. If awarded a contract, how many calendar days after the award could you begin construction?
Please note that all individuals working on site at the institutions must undergo a security clearance investigation. This investigation may take 30 calendar days or longer to complete.
________ Calendar days after Contract Award
9. Please furnish the following information in reference to your firm:
Name:
Address:
Point of Contact:
Telephone Number:
E-mail Address:
Please e-mail your responses to pford@bop.gov. Responses must be received no later than March 19, 2024.
A few notes regarding all FBOP requirements:
1. The resulting solicitation will be distributed solely through the General Services Administration Federal Business Opportunities website at sam.gov. Hard copies of the solicitation are not available. The website provides download instructions to obtain all documents relating to the solicitation. All future information concerning this acquisition, including the pre-solicitation notices, solicitation, and any subsequent amendments, will be distributed solely through the website. Interested parties are responsible for monitoring the website to ensure they have the most current information about the acquisition.
2. Any contractor interested in obtaining a contract award with the Federal Bureau of Prisons must be registered in the System for Award Management (SAM) at www.sam.gov. In order to qualify for award, your business size metrics information entered in your SAM registration must be less than or equal to the size standard specified above. You must also have the NAICS code stated.
Each bidder's SAM registration will be reviewed by the Government to confirm that your business size meets the small business size standard requirement and the stated NAICS code is listed. All bidders are urged to double check their SAM registration and update as necessary, including the size metrics information and NAICS code.
mailto:pford@bop.gov https://beta.sam.gov/
| Check Box1: Off |
| Check Box2: Off |
| Text3: |
| Text4: |
| Check Box5: Off |
| Check Box6: Off |
| Text7: |
| Check Box8: Off |
| Check Box9: Off |
| Check Box10: Off |
| Check Box11: Off |
| Check Box12: Off |
| Check Box13: Off |
| Check Box14: Off |
| Check Box15: Off |
| Text16: |
| Check Box17: Off |
| Check Box18: Off |
| Text19: |
| Text20: |
| Text21: |
| Text22: |
| Text23: |
| Text24: |
File details come from the government source that posted it. Updated .