Sources Sought - PWS Service Points 20230306.xlsx

XLSX spreadsheet 27 KB Posted

Attached to
The Air Force Technical Applications Center (AFTAC) United States Atomic Energy Detection System (USAEDS) Network Services
Solicitation number
821900829
Issued by

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Service PointAddressLat/LongBandwidthVOIPCritical Service PointPower SourceAvailabilityOwnershipSpecial Requirements
Service Point A

Patrick SFB, FL Primary Center (Terrestrial) Air Force Technical Applications Center Building 10989, Room CN 335 1010 S. Patrick Drive

Patrick SFB, FL 32925-3002281421N 0803628W5 Mb Ethernet and a Backup 5 Mb Ethernet for redundancy and circuit diversity (Ethernet circuits are mandated as serial circuits are being phased out in the DoD and commercial environments)Yes (2)Yes110-120 VAC, 60 Hz99.90%SP-A is 100% Government funded and owned equipment and civil works (subject to Section 6.1.13).
Service Point B - DELETED
Service Point C Cambridge Bay (Satellite)Building: E TRAIN Central Recording Station ITT – Federal Services Corp

P.O. Box 40

Cambridge Bay NT, Canada XOE OCO690652N 1050714W64Kbps/64KbpsYesYes110-120 VAC, 60 Hz99.90%SP-C is 100% Government funded and owned equipment and civil works (subject to Section 6.1.13).
Service Point D Flin Flon (Satellite)Remote Site EL 244
EL 244

Canadian Forces Station Flin Flon Highway #167 (Beaver Lake Road) Flin Flon, Manitoba

Canada R8A 1N5 Central Recording Building Room: 20/21535800N 1010600W64Kbps/64KbpsNoYes110-120 VAC, 60 Hz99.90%SP-D is 100% Government funded and owned equipment and civil works (subject to Section 6.1.13).
Service Point E, Kandili, Turkey (Terrestrial)Remote Site EL 301 Kandili, Turkey
Building: Central Recording Building, Room: OPS Room
B.U. Kandilli Rasath. Deprem VE
Sismik Arastirma Merkezi
Ankara Univ. Rasathanesi Yani
Incek Yolu 3 KM
Ahlatlibel – Ankara – Turkiye395101N 0324716E64Kbps/64KbpsNoYes220-240 VAC, 50 Hz99.30%SP-E is 100 percent Government funded and owned equipment and civil works (subject to Section 6.1.13).
Service Point F - DELETED
Service Point G, Chiang Mai, Thailand (Satellite)Remote Site Det 415 Chiang Mai, Thailand
Det 415
C/O: RTNSRS
Srivichai Rd
Chang Puak, Amphur Muang
Chiang Mai, Thailand 50300184800N 0985900E256Kbps/256KbpsYesYes220-240 VAC, 50 Hz99.90%SP-G is 100 percent Government funded and owned equipment and civil works (subject to Section 6.1.13).
Service Point H, Alice Springs, Australia (Satellite)Remote Site Det 421 Alice Springs, Australia
Det 421
APO AP 96548-0007234200N 1335200E512Kbps/512KbpsYesYes220-240 VAC, 50 Hz99.90%The contractor is the sole owner of the civil works at this service point. The Government owns all other equipment; indoor and outdoor systems included. (Reference Section 6.1.13).
Service Point I, Wonju, South Korea (Satellite)Remote Site KSRS Wonju, South Korea
KIGAM/KSRS
Unit 15373372500N 1275700E64Kbps/64KbpsYesYes220VAC, 60 Hz99.90%SP-I is 100 percent Government funded and owned equipment and civil works (Reference Section 6.1.13).
Service Point J, Eielson AFB, AK (Alaskan Satellite Hub and MPLS to AFTAC) (Satellite)Det 460
1183 Flight Line Ave Ste 1
Eielson AFB AK 99702-1660645000N 1473800W320Kbps/320KbpsYesYes110-120 VAC, 60 Hz99.90%SP-J is 100 percent Government funded and owned equipment and civil works (Reference Section 6.1.13).Analog to IP conversion required. SP-J receives data from SP-J1 and SP-J2. Data is processed and then sent via a terrestrial circuit to SP-A/B2.
Service Point J1 Indian Mountain, AK (Satellite)Indian Mountain Long Range Radar Site (LRRS), A.K.N/A64Kbps/64KbpsYesYes110-120 VAC, 60 Hz99.90%The contractor is the sole owner of the civil works at this service point. The Government owns all other equipment; indoor and outdoor systems included. (Reference Section 6.1.13).Analog to IP conversion required. SP-J1 sends data to SP-J only.
Service Point J2 Ft Yukon, AK (Satellite)Fort Yukon LRRS, A.K.N/A256Kbps/256KbpsYesYes110-120 VAC, 60 Hz99.90%The contractor is the sole owner of the civil works at this service point. The Government owns all other equipment; indoor and outdoor systems included. (Reference Section 6.1.13).Analog to IP conversion required. SP-J2 sends data to SP-J only.
Service Point J3 Tatalina, AK (Satellite)Tatalina LRRS, A.K.N/A64Kbps/64KbpsYesYes110-120 VAC, 60 Hz99.90%The contractor is the sole owner of the civil works at this service point. The Government owns all other equipment; indoor and outdoor systems included. (Reference Section 6.1.13).Analog to IP conversion required. SP-J3 sends data to SP-J only.
Service Point K, Lajitas, TX (Satellite)Direct to site
Southern Methodist University (SMU)
C/O Bee Mountain Hardware
Highway 170
Terlingua, TX 79852
432-371-3113292000N 1033740W64 Kbps/128 KbpsYesYes110-120 VAC, 60 Hz99.90%SP-K is 100 percent Government funded and owned equipment and civil works (subject to Section 6.1.13).SP-K must send data to SP-K1 and SP-A simultaneously
Service Point K1 SMU, Dallas, TX (Satellite)Southern Methodist University
Department of Geological Sciences
Dallas, TX. 750302
Phone: (214) 768-2748
Mailing Address Southern Methodist University (SMU)
Attn: Arthur Endress
Heroy Bldg Rm 210
3225 Daniel Ave.
Dallas, TX. 75275292000N 1033740W128 Kbps/64 KbpsYesYes110-120 VAC, 60 Hz99.90%SP-K1 is 100 percent Government funded and owned equipment and civil works (subject to Section 6.1.13).SP-K1 receives data from SP-K
Service Point L, Ulaanbaatar, Mongolia (Satellite)Ulaanbaatar (Capitol City), Mongolia47°54'00.0"N
107°00'00.0"E128Kbps/128KbpsYesYes220-240 VAC, 50 Hz99.90%The contractor is the sole owner of the civil works at this service point. The Government owns all other equipment; indoor and outdoor systems included. (Reference Section 6.1.13).SP-L1, L2, and L3 will send data to SP-L.
Service Point L1, Altai-Gobi, Mongolia (Satellite)Altai-Gobi, Mongolia46°35'32.3"N
96°22'58.8"E64Kbps/128KbpsYesYes48 VDC Source, 24 VDC Available/Preferred99.90%The contractor is the sole owner of the civil works at this service point. The Government owns all other equipment; indoor and outdoor systems included. (Reference Section 6.1.13).SP-L1 sends date to SP-L for processing.
Service Point L2, Sayhan-Erdene, Mongolia (Satellite)Sayhan-Erdene Mongolia44°03'42.3"N
110°52'29.3"E64Kbps/128KbpsYesYes48 VDC Source, 24 VDC Available/Preferred99.90%The contractor is the sole owner of the civil works at this service point. The Government owns all other equipment; indoor and outdoor systems included. (Reference Section 6.1.13).SP-L2 sends data to SP-L for processing.
Service Point L3, Choybalsan, Mongolia (Satellite)Choybalsan (DOMAR), Mongolia47°41'38.3"N
113°03'41.3"E64Kbps/128KbpsYesYes48 VDC Source, 24 VDC Available/Preferred99.90%The contractor is the sole owner of the civil works at this service point. The Government owns all other equipment; indoor and outdoor systems included. (Reference Section 6.1.13).Special Requirements: SP-L3 sends data to SP-L for processing.
Service Point N, Silverton, South Africa (Satellite)Remote Site (EL) 811 Silverton, South Africa
280 Pretoria St Silverton
South Africa Council of Geoscience
Private Bag X112
Pretoria 0001, South Africa254407S 281655E64Kbps/64KbpsYesYes220-240 VAC, 50 Hz99.90%SP-N is 100 percent Government funded and owned equipment and civil works (subject to Section 6.1.13).SP-N receives data from SP-N1. SP-N will send data to SP-A/B.
Remote Site N1, Borehole, South Africa (Satellite)Remote Site (EL) 811 Silverton, South Africa
280 Pretoria St Silverton
South Africa Council of Geoscience
Private Bag X112
Pretoria 0001, South Africa254407S 281655E64Kbps/64KbpsYesYes24 VDC Only99.00%SP-N1 is 100 percent Government funded and owned equipment and civil works (subject to Section 6.1.13).Data will be sent to SP-N for processing.
Service Point O, Lamto, Ivory Coast (Satellite)Remote Site EL 812 Lamto, Ivory Coast
Station Geophysique de Lamto
B.P. 31
N’Douci, Cote d’Ivoire061328N 050140W64Kbps/64KbpsYesYes220-240 VAC, 50 Hz99.90%SP-O is 100 percent Government funded and owned equipment and civil works (subject to Section 6.1.13).
Service Point P, Lobatse, Botswana (Satellite)Remote Site EL 813 Lobatse, Botswana
Geological Survey
Private Bag 14
Lobatse, Botswana251230S 254042E64 Kbps/64 KbpsYesYes220-240 VAC, 50 Hz99.90%SP-P is 100 percent Government funded and owned equipment and civil works (subject to Section 6.1.13).
Service Point R, San Lorenzo, Paraguay (Satellite)Main Site EL 821 San Lorenzo, Paraguay
Facultad de Ciencias Exactas y Naturales
Departmento de Geologia
Ciudad Universitaria – San Lorenzo
CC.C. 1039-1804 Asuncion, Paraguay251940S 573030W64Kbps/64KbpsYesYes220-240 VAC, 50 Hz99.90%SP-R is 100 percent Government funded and owned equipment and civil works (subject to Section 6.1.13).
Service Point R1, Villa de Florida, Paraguay (Satellite)Remote Site EL 821 San Lorenzo, Paraguay
Facultad de Ciencias Exactas y Naturales
Departmento de Geologia
Ciudad Universitaria – San Lorenzo
CC.C. 1039-1804 Asuncion, Paraguay251940S 573030W64Kbps/64KbpsYesYes24 VDC Only99.00%SP-R1 is 100 percent Government funded and owned equipment and civil works (subject to Section 6.1.13).
Service Point S, San Juan, Argentina (Satellite)Main Site EL 822 San Juan, Argentina
Departamento Laboratorio Sismologia
INPRES
Rogert Balet 47 Norte
5400 San Juan, ArgentinaN/A64Kbps/64KbpsYesYes220-240 VAC, 50 Hz99.90%SP-S is 100 percent Government funded and owned equipment and civil works (subject to Section 6.1.13).SP-S receives data from SP-S1 for processing, and then transmits the data to SP-A/B
Service Point S1, Paso Flores, Argentina (Satellite)Remote Site EL 822 Paso Flores, Argentina
Estancia Paso Flores
C.C 462
8400 Bariloche, Argentina313134S 685329W64 Kbps/64 KbpsYesYes24 VDC Only99.00%SP-S1 is 100 percent Government funded and owned equipment and civil works (subject to Section 6.1.13).SP-S1 sends data to SP-S.
Service Point T, Observatorio San Calixto, La Paz Bolivia (Satellite)Main Site EL 823 (Observatory)
Observatorio San Calixto 12656 La Paz Bolivia162926S 680757W64 Kbps/64 KbpsYesYes220-240 VAC, 50 Hz99.30%SP-T is 100 percent Government funded and owned equipment and civil works (subject to Section 6.1.13).
Service Point T1, Borehole, Zonga, Bolivia (Satellite)Remote Site EL 823
La Paz, Bolivia16.287923, -68.13071464 Kbps/64 KbpsYesYes220-240 VAC, 50 Hz99.30%SP-T is 100 percent Government funded and owned equipment and civil works (subject to Section 6.1.13).
Service Point U, Canberra, Australia (Terrestrial)Canberra, Australia
Geoscience Australia
Cnr Jerrabomberra Ave and Hindmarsh Drive
Symonston ACT 2609
Building – Main Building, Room G.271
GPO Box 378, Canberra, ACT, Australia, 2601N/A64 Kbps/64 KbpsNoYes220-240 VAC, 50 Hz99.30%SP-U is 100 percent Government funded and owned equipment and civil works (subject to Section 6.1.13).
Service Point W, Mina, NV (Terrestrial)Remote Site, Mina, Nevada
Building: Mina Municipal Bldg, US 95
Geophysical Research Program
Mina NV 8942238° 23' 25" N 118° 06' 30" W64 Kbps/64 KbpsNoYes110-120 VAC, 60 Hz99.30%SP-W is 100 percent Government funded and owned equipment and civil works (subject to Section 6.1.13).
Service Point X, Almaty, Kazakhstan (Satellite)Main Site Almaty Kazakhstan
490021 Kazakhstan
Semipalatinsk - 21
Institute of Geophysical Research
National Data Center, Republic of KazakhstanN/A192 Kbps/128 KbpsYesYes220-240 VAC, 50 Hz99.90%The contractor is the sole owner of the civil works at this service point. The Government owns all other equipment; indoor and outdoor systems included. (Reference Section 6.1.13).SP-X receives data from SP-X1, X2, X3, and X4. Data is processed and then sent to SP-A/B.
Service Point X1, Makanchi, Kazakhstan (Satellite)Remote Site Makanchi Seismic Station, Kazakhstan
491640 Vostochno-Kazakhstanskaya Oblast
Urdzhar Region, Makanchi Settlement
Donenbekova Str. Apt. 646° 47’ 58.2” N 81° 59’ 22.5” E64 Kbps/128 KbpsYesYes220-240 VAC, 50 Hz99.90%The contractor is the sole owner of the civil works at this service point. The Government owns all other equipment; indoor and outdoor systems included. (Reference Section 6.1.13).SP-X1 sends data to SP-X only.
Service Point X2, Karatau, Kazakhstan (Satellite)Remote Site Karatau Seismic Station, Kazakhstan
Central Processing FacilityLAT – 43 05' 50" N LON - 70 31' 35" E64 Kbps/128 KbpsYesYes220-240 VAC, 50 Hz99.90%The contractor is the sole owner of the civil works at this service point. The Government owns all other equipment; indoor and outdoor systems included. (Reference Section 6.1.13).SP-X2 sends data to SP-X only.
Service Point X3 Akbulak, Kazakhstan (Satellite)Remote Site Akbulak Seismic Station, Kazakhstan
Central Processing Facility49° 15’ 20.16” N 59° 56’ 35.16” E64 Kbps/128 KbpsYesYes220-240 VAC, 50 Hz99.90%The contractor is the sole owner of the civil works at this service point. The Government owns all other equipment; indoor and outdoor systems included. (Reference Section 6.1.13).SP-X3 sends data to SP-X only.
Service Point X4 Borovoye, Kazakhstan (Satellite)Remote Site Borovoye Seismic Station, Kazakhstan
Central Processing FacilityN/A64 Kbps/128KbpsYesYes220-240 VAC, 50 Hz99.90%The contractor is the sole owner of the civil works at this service point. The Government owns all other equipment; indoor and outdoor systems included. (Reference Section 6.1.13).SP-X4 sends data to SP-X only.
Service Point Z Centennial, CO (Terrestrial)Main Site, Centennial, CO.
Raytheon Polar Services
61 Inverness Drive East, Suite 300
Englewood Colorado, 80112N/A128Kbps/128KbpsNoYes110-120 VAC, 60 Hz99.30%SP-Z is 100 percent Government funded and owned equipment and civil works (subject to Section 6.1.13).
Service Point AB Kjeller, Norway (Terrestrial)Main Site, Norwegian Data Center
Granaveien 33
Foreign Communications Interconnection
Kjeller, NorwayN/A128Kbps/128KbpsNoYes220-240 VAC, 50 Hz99.30%SP-AB is 100 percent Government funded and owned equipment and civil works (subject to Section 6.1.13).
Service Point AD, Bucharest, Romania (Satellite)Main Site, Bucharest, Romania
National Institute for Earth Physics (NIEP)
Calugareni Str. 12
PO BOX MG-2, 077125
Magurele, ILFOV, RomaniaN/A128Kbps/128KbpsYesYes220-240 VAC, 50 Hz99.90%The contractor is the sole owner of the civil works at this service point. The Government owns all other equipment; indoor and outdoor systems included. (Reference Section 6.1.13).SP-AD receives data from SP-AD1. Data is processed and then sent to SP-A/B.
Service Point AD1, Benea, Romania (Satellite)Remote Sire, Benea, Romania
National Institute for Earth Physics (NIEP)
Calugareni Str. 12
PO BOX MG-2, 077125
Magurele, ILFOV, Romania47-46.6N 025-11.5E64Kbps/64KbpsYesYes220-240 VAC, 50 Hz99.90%SP-AD1 is 100 percent Government funded and owned equipment and civil works (subject to Section 6.1.13).SP-AD1 sends data to SP-AD.
Service Point AF, Ascension Island, BC (Satellite)Ascension Island, BCN/A128 Kbps/128 KbpsNoYes110-120 VAC, 60 Hz99.90%SP-AF is 100 percent Government funded and owned equipment and civil works (subject to Section 6.1.13).
Service Point AJ, Wake Island, HI (Satellite)Wake Island, AFTAC Site
General Delivery
Wake Island, HI 96898N/A64Kbps/128KbpsYesYes110-120 VAC, 60 Hz99.90%SP-AJ is 100 percent Government funded and owned equipment and civil works (subject to Section 6.1.13).1. SP-AJ is 100 percent Government funded and owned equipment and civil works (subject to Section 6.1.13). The contractor's responsibility for SP- AJ is stated in the paragraphs below:

2. AFTAC will provide onsite Government representatives for equipment replacement /troubleshooting support. The contractor may be asked to provide onsite support. If such support is required, the contractor may bill the Government.

3. When a failure of the network is identified by the contractor’s NOCC system, or by Government personnel, the contractor shall provide unscheduled and preventive maintenance via remote login for all equipment that has such capability. (i.e. routers, satellite modems, VoIP) The contractor shall also provide maintenance support via e-mail and/or telephone discussions with onsite Government support personnel. The contractor will utilize its NOCC and monitoring software to determine when unscheduled and preventive maintenance is necessary. Onsite Government personnel may also relay information to the contractor about the equipment that will warrant maintenance actions.

4. The Government will provide spares for all critical communications equipment at SP-AJ. The reliability and availability of the GFE equipment at SP-AJ shall be the responsibility of the Government.

5. The contractor hereby releases the Government from any and all liability for further equitable adjustments attributable to or caused by the addition of the Government-owned equipment to their system, network, circuit, and/or associated equipment at the SP-AJ Site, Wake Island.

6. Government owned equipment consists of:

2.4M Channel Master Circular X-Pole Antenna
Cisco 2611XM Router (2)
Linksys Hub EZXS55W
VoIP
iNfinity 3100 Net modem (2)
Mitec 20W BUC WTX 596443-70-ES-25 (2)
Patriot 3220 C Band LNB (2)

Service Point AK, Kabul, Afghanistan (Satellite (Ku-band)) Remote Site, Kabul Afghanistan N/A 64 Kbps/64 Kbps Yes Yes 24 VDC 99.00% SP-AK is 100 percent Government funded and owned equipment and civil works (subject to Section 6.1.13). 1. SP-AK is 100 percent Government funded and owned equipment and civil works (subject to Section 6.1.13). The Contractor's responsibility for SP- AK is stated in the paragraphs below:

2. AFTAC will provide onsite Government representatives for equipment replacement /troubleshooting support. The Contractor may be asked to provide onsite support. If such support is required, the contractor may bill the Government.

3. When a failure of the network is identified by the contractor’s NOCC system, or by Government personnel, the Contractor shall provide unscheduled and preventive maintenance via remote login for all equipment that has such capability. (I.E. routers, satellite modems, VoIP) The Contractor shall also provide maintenance support via e-mail and/or telephone discussions with onsite Government support personnel. The Contractor will utilize its NOCC and monitoring software to determine when unscheduled and preventive maintenance is necessary. Onsite Government personnel may also relay information to the contractor about the equipment that will warrant maintenance actions.

4. The Government will provide spares for all critical communications equipment at SP-AK. The reliability and availability of the GFE equipment at SP-AK shall be the responsibility of the Government.

5. The Contractor hereby releases the Government from any and all liability for further equitable adjustments attributable to or caused by the addition of the Government-owned equipment to their system, network, circuit, and/or associated equipment at the SP-AK Site.

6. Government owned equipment consists of:

SP-AK: 1.2M Patriot Antenna
Linear Co-Pole (1)
iNfinity 3100 net modem (2)
New Japan NJT5017/17F 4W Ku BUC (2)
New Japan NJR2537S Ku LNB (2)
Service Point AL, Classified Site (Satellite Only)Classified SiteN/A256 Kbps/256 KbpsNoYes220-240 VAC, 50 Hz99.90%SP-AL is 100 percent Government funded and owned equipment and civil works (subject to Section 6.1.13).SP-AL is 100 percent Government funded and owned equipment and civil works (subject to Section 6.1.13). The contractor's responsibility for SP-AL is stated in the paragraphs below:

AFTAC will provide onsite Government representatives for equipment replacement /troubleshooting support. The Contractor may be asked to provide onsite support. If such support is required, the contractor may bill the Government.

Level 1 Maintenance: The Host and/or Detachment (Det) will be responsible for the following:

- Providing onsite personnel for equipment replacement and troubleshooting support until resolution. Performing preventive maintenance on equipment located outdoors, to include corrosion control of dish, replacing weather cabling/seals, re-torque mast bolts and aligning the satellite dish for the contractor when fine tuning signal.

- The Government will provide spares for all critical communications equipment at SP-AL. The reliability and availability of the GFE equipment shall be the responsibility of the Host and/or the AFTAC Detachment located closest to the service point.

- If any equipment fails, the Host/Detachment shall package failed equipment and ship back to AFTAC for repair.

Level 2 Maintenance: The Contractor shall be responsible for the following:

- The Contractor shall provide a 24/7 NOCC capable of isolating communication problems.

- The Contractor shall provide a single/alternate number for all network-related trouble calls. This trouble number shall be manned 24/7/365.

- The Contractor shall provide unscheduled and preventive maintenance via remote login for all equipment that has such capability. (I.E. routers and satellite modems)

- The Contractor shall also provide maintenance support via e-mail or telephone discussions with Det personnel.

- The Contractor shall be responsible for providing replacement for equipment that is under warranty and will be reimbursed, on a cost-reimbursable basis, for any maintenance support provided for non-warranty items.

Government owned equipment consists of:

SP-AL: 2.4M Prodelin Antenna
Circular X-Pole
INfinity 3100 net modem (2)
Cisco 1841 router (2)
Mitec WTX-596443-70-ES-25 20W C-band BUC (2)
New Japan NJS8477S C- band LNB (2)
Service Point AM, Vienna IDC (MPLS) (Terrestrial)International Data Center, ViennaN/A1.544Mbps/1.544Mbps (Upgrade to 5 Mb Ethernet is preferable)NoYes220-240 VAC, 50 Hz99.90%SP-AM is 100 percent Government funded and owned equipment and civil works (subject to Section 6.1.13).
Service Point AR (Satellite)Remote Location: RL-43N/A32KBPS/32KBPSNoNo230 VAC99.90%SP-AR is 100 percent Government funded and owned equipment and civil works (subject to Section 6.1.13).1. SP-AR is 100 percent Government funded and owned equipment and civil works (subject to Section 6.1.13). The contractor’s responsibility for SP-AR is stated in the paragraphs below:

2. AFTAC will provide onsite Government representatives for equipment replacement /troubleshooting support. The contractor may be asked to provide onsite support. If such support is required, the contractor may bill the Government.

3. When a failure of the network is identified by the contractor’s NOCC, or by Government personnel, the contractor shall provide unscheduled and preventive maintenance via remote login for all equipment that has such capability (i.e. routers, satellite modems, VoIP, BUCs, ASAs and LNBs). The contractor shall also provide maintenance support via e-mail and/or telephone discussions with onsite Government support personnel. The contractor will utilize its NOCC and network monitoring software to determine when unscheduled and preventive maintenance is necessary. Onsite Government personnel may also relay information to the contractor about the equipment that will warrant maintenance actions.

4. The contractor will provide spares for all critical communications equipment at SP-AR. The reliability and availability of the GFE equipment at SP-AR shall be the responsibility of the Government.

Service Point AS, Herat, Afghanistan (Satellite) Remote Site, Herat, Afghanistan Available Upon Request 32KBPS/32KBPS No Yes Solar, 9-48 VDC 99.00% SP-AS is 100 percent Government funded and owned equipment and civil works (subject to Section 6.1.13). 1. SP-AS is 100 percent Government funded and owned equipment and civil works (subject to Section 6.1.13). The contractor’s responsibility for SP-AS is stated in the paragraphs below:

2. AFTAC will provide onsite Government representatives for equipment replacement /troubleshooting support. The contractor may be asked to provide onsite support. If such support is required, the contractor may bill the Government.

3. When a failure of the network is identified by the contractor’s NOCC, or by Government personnel, the contractor shall provide unscheduled and preventive maintenance via remote login for all equipment that has such capability (i.e. routers, satellite modems, VoIP, BUCs, ASAs and LNBs). The contractor shall also provide maintenance support via e-mail and/or telephone discussions with onsite Government support personnel. The contractor will utilize its NOCC and network monitoring software to determine when unscheduled and preventive maintenance is necessary. Onsite Government personnel may also relay information to the contractor about the equipment that will warrant maintenance actions.

4. The contractor will provide spares for all critical communications equipment at SP-AS. The reliability and availability of the GFE equipment at SP-AS shall be the responsibility of the Government.

Service Point AT, Badakhshan, Afghanistan (Satellite) Remote Site, Badakhshan, Afghanistan Available Upon Request 32KBPS/32KBPS No Yes Solar, 9-48 VDC 99.00% SP-AT is 100 percent Government funded and owned equipment and civil works (subject to Section 6.1.13). 1. SP-AT is 100 percent Government funded and owned equipment and civil works (subject to Section 6.1.13). The contractor’s responsibility for SP-AT is stated in the paragraphs below:

2. AFTAC will provide onsite Government representatives for equipment replacement /troubleshooting support. The contractor may be asked to provide onsite support. If such support is required, the contractor may bill the Government.

3. When a failure of the network is identified by the contractor’s NOCC, or by Government personnel, the contractor shall provide unscheduled and preventive maintenance via remote login for all equipment that has such capability (i.e. routers, satellite modems, VoIP, BUCs, ASAs and LNBs). The contractor shall also provide maintenance support via e-mail and/or telephone discussions with onsite Government support personnel. The contractor will utilize its NOCC and network monitoring software to determine when unscheduled and preventive maintenance is necessary. Onsite Government personnel may also relay information to the contractor about the equipment that will warrant maintenance actions.

4. The contractor will provide spares for all critical communications equipment at SP-AT. The reliability and availability of the GFE equipment at SP-AT shall be the responsibility of the Government.

Service Point AV, Rabat, Morocco (Satellite) Main Site N/A 317KBPS/282KBPS No Yes 230 VAC 99.90% SP-AV is 100 percent Government funded and owned equipment and civil works (subject to Section 6.1.13). 1. SP-AV is 100 percent Government funded and owned equipment and civil works (subject to Section 6.1.13). The contractor’s responsibility for SP-AV is stated in the paragraphs below:

2. AFTAC will provide onsite Government representatives for equipment replacement /troubleshooting support. The contractor may be asked to provide onsite support. If such support is required, the contractor may bill the Government.

3. When a failure of the network is identified by the contractor’s NOCC system, or by Government personnel, the contractor shall provide unscheduled and preventive maintenance via remote login for all equipment that has such capability (i.e. routers, satellite modems, VoIP, BUCs, ASAs and LNBs). The contractor shall also provide maintenance support via e-mail and/or telephone discussions with onsite Government support personnel. The contractor will utilize its NOCC and monitoring software to determine when unscheduled and preventive maintenance is necessary. Onsite Government personnel may also relay information to the contractor about the equipment that will warrant maintenance actions.

4. The contractor will provide spares for all critical communications equipment at SP-AV. The reliability and availability of the GFE equipment at SP-AV shall be the responsibility of the Government.

Service Point AV1, Midelt, Morocco (Satellite) Remote Site N/A 282KBPS/317KBPS No Yes 24 VDC 99.00% SP-AV1 is 100 percent Government funded and owned equipment and civil works (subject to Section 6.1.13). 1. SP-AV1 is 100 percent Government funded and owned equipment and civil works (subject to Section 6.1.13). The contractor’s responsibility for SP-AV1 is stated in the paragraphs below:

2. AFTAC will provide onsite Government representatives for equipment replacement /troubleshooting support. The contractor may be asked to provide onsite support. If such support is required, the contractor may bill the Government.

3. When a failure of the network is identified by the contractor’s NOCC system, or by Government personnel, the contractor shall provide unscheduled and preventive maintenance via remote login for all equipment that has such capability (i.e. routers, satellite modems, VoIP, BUCs, ASAs and LNBs) The contractor shall also provide maintenance support via e-mail and/or telephone discussions with onsite Government support personnel. The contractor will utilize its NOCC and monitoring software to determine when unscheduled and preventive maintenance is necessary. Onsite Government personnel may also relay information to the contractor about the equipment that will warrant maintenance actions.

4. The contractor will provide spares for all critical communications equipment at SP-AV1. The reliability and availability of the GFE equipment at SP-AV1 shall be the responsibility of the Government.

Service Point B2, ALTNDC OL-MT (Terrestrial)5724 Commitment Loop
Bldg 776, Rm 101
NCTAMS Millington, TN. 38054N/A6 Mbps Primary and 6 Mbps Secondary CircuitsYesYes220-240 VAC, 60 Hz99.90%SP-B2 is 100 percent Government funded and owned equipment and civil works (subject to Section 6.1.13).

File details come from the government source that posted it. Updated .