Sources Sought Notice - W912HP26SA001- CHS Peninsula SATOC.pdf
PDF 209 KB Posted
- Solicitation number
- W912HP26SA001
About this file
This Sources Sought Notice is a market research document for an Architect-Engineer (A-E) Single Award Task Order Contract (SATOC) issued by the U.S. Army Corps of Engineers Charleston District for design services related to a coastal storm risk management project in Charleston Peninsula, South Carolina. The project involves designing an 8.7-mile storm surge structure with a top elevation of 12 feet, including multiple gates, hydraulic pump stations, living shoreline sills, structure floodproofing, and environmental mitigation.
The anticipated contract will be an Indefinite Delivery/Indefinite Quantity (IDIQ) architecture and engineering services contract with a potential ordering period of 5-10 years. Design services will cover comprehensive engineering disciplines including coastal and hydraulic engineering, structural and geotechnical analysis, mechanical and electrical systems, environmental compliance, risk management, and construction support. Interested firms are invited to submit a 10-page capability statement by 2:00 PM Eastern Time on November 7, 2025, demonstrating experience in coastal storm risk management, storm surge infrastructure, and multi-disciplinary engineering capabilities. The government has not yet determined whether the procurement will be set aside for small businesses and is seeking industry feedback to inform the acquisition strategy.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOURCES SOUGHT NOTICE (MARKET RESEARCH)
Architect-Engineer (A-E) Single Award Task Order Contract (SATOC) Design Services for the Charleston Peninsula, South Carolina Project U.S. Army Corps of Engineers, Charleston District (USACE-SAC)
1. DISCLAIMER & PURPOSE
This is a Sources Sought Notice issued solely for market research in accordance with FAR Part 10 and FAR 36.6 (Selection of Architects-Engineers). This notice is not a request for proposals, request for qualifications, or an invitation for bid; no award will be made from this notice. No reimbursement will be made for any costs associated with responding. Responses to this notice will be used to inform the Government’s acquisition strategy (including potential small-business set-aside determination) for a contemplated A-E Single Award Task Order Contract (SATOC).
2. PLANNED CONTRACT OVERVIEW (SUBJECT TO CHANGE)
Type: Architect-Engineer SATOC, IDIQ (FAR 36.6 procedures).
Anticipated Capacity: At this stage, the exact capacity for this project is not yet determined. The Government seeks to understand the capabilities of the industry to provide support in the event of a range of needs, which will be refined during the acquisition process.
Anticipated Ordering Period: Up to five (5) or ten (10) years (details TBD; may include base and option periods).
Place of Performance: Charleston Peninsula, Charleston County, South Carolina, with ancillary work as needed to support the Project.
Primary NAICS: 541330 – Engineering Services (PSC C219, A-E General – Other, anticipated). The applicable SBA size standard will be as designated for NAICS 541330 at the time of synopsis.
Small-Business Considerations: Undetermined at this time. Responses to this notice will assist the Government in determining the appropriate set-aside, if any (e.g., Small Business, 8(a), HUBZone, SDVOSB, WOSB) or whether to proceed unrestricted.
3. PROJECT BACKGROUND & DESCRIPTION
The USACE Charleston District has a coastal storm risk management project within the Charleston Peninsula, South Carolina consisting of a storm surge structure approximately 8.7 miles in length with a top elevation of 12 feet NAVD88, multiple pedestrian, vehicle, railroad, and storm (tidal flow) gates, approximately five temporary and five permanent small to medium hydraulic pump stations, approximately 9,300 feet of oyster reef-based living shoreline sills, floodproofing or elevating approximately 100 structures in residential areas where construction of the storm surge structure would be impracticable, and mitigation for natural, cultural, historic, and aesthetic resources, as generally described in the Charleston Peninsula, South Carolina, Coastal Storm Risk Management Study Final Feasibility Report / Environmental Impact Statement.
This A-E SATOC is to provide Design Services which may include, and are not limited to, performance of all activities related to detailed Pre-Construction Engineering and Design (PED), up through preparation of plans and specifications for the initial construction contract, and request for proposal for Design Build phases for the Project.
A. Preliminary Design and Supporting Studies
Site Assessment and Surveying: Detailed topographic and bathymetric surveys of the proposed project site.
Geotechnical Investigation: Subsurface investigation and analysis to understand soil conditions and inform structural design.
Hydrodynamic and Hydraulic Modeling: Simulation of storm surge, tidal influences, and wave heights to design for maximum surge and wave impact.
Environmental Impact Assessment (EIA): To comply with NEPA (National Environmental Policy Act) or other local environmental regulations, assessing the impacts on ecosystems, water quality, etc.
B. Detailed Design Engineering Flood Protection System Design: Design of the storm surge barrier, considering factors such as height, thickness, materials, and reinforcement to withstand extreme conditions. Integration with the surrounding landscape, including access roads, drainage systems, and utilities.
Flood Protection Components: Detailed design of flood gates, barriers, pumping stations, and tide gates that could work in conjunction with the surge wall.
Natural Features: Detailed analysis and design of natural features for storm surge protection and mitigation features.
Flood Proofing: Nonstructural flood proofing design of residential and commercial structures.
C. Environmental and Regulatory Design Compliance Permitting and Approvals: Work to obtain all required permits (e.g. Army Corps of
Engineers, local agencies, etc.).
Environmental Mitigation: Design to minimize environmental damage, with plans for habitat restoration or other mitigative actions.
D. Risk Management Risk Analysis: Conduct a thorough risk assessment, particularly with regard to potential failure modes of the surge wall during extreme weather.
E. Operations and Maintenance Plan
Maintenance Guidelines: Provide clear guidelines for the maintenance and inspection of the wall, including recommendations for preventive measures.
Operations Plan: Provide an O&M plan for gate structures and pump stations
F. Construction Phase Support RFI and Shop Drawing Reviews
4. ANTICIPATED A-E SCOPE OF SERVICES (NON-EXHAUSTIVE)
The contemplated design scope may include, but is not limited to:
Project Management Services: coordination of design team with other stakeholders (i.e., Environmental agencies; federal, state, and local agencies)
Coastal & Hydraulic Engineering: storm surge structure design; gate structures (tidal flow, pedestrian, vehicle, railroad); coastal modeling (water levels, waves, overtopping); hydrology & hydraulics; interior drainage; pump station sizing and design; surge, scour, and erosion analysis; living shoreline sill design.
Structural & Geotechnical: floodwall/seawall/levee appurtenances; deep/shallow foundations; retaining structures; subsurface exploration and lab testing; seismic considerations; ground improvement; settlement and stability analyses; temporary works; barge and vessel impact analysis.
Mechanical, Electrical, and Controls (MEICA): pump and prime-mover selection;
valves and gates; electrical power distribution; standby power; instrumentation and control systems; SCADA; cybersecurity for facility control systems.
Civil & Site: roadway/traƯic interfaces; drainage; utilities (relocation/adjustments);
site layout; stormwater management; grading; access; construction phasing and sequencing.
Architecture / Building Systems: pump station buildings and enclosures; HVAC;
architectural disciplines as required; coordination with the Local Board of Architectural Review (BAR); landscape architecture or aesthetics.
Environmental, Cultural, Historic, and Mitigation: NEPA compliance support;
Section 401/404 permitting; Section 106 consultation; living shoreline and ecological mitigation design; water quality considerations; threatened and endangered species; wetlands; monitoring plans; environmental and aesthetics considerations.
Nonstructural Measures: design for structure elevation and dry/wet floodproofing of residential and commercial structures; parcel/structure-level assessments;
benefit-cost and feasibility support; constructability and community coordination.
Surveying, Mapping, and Data: topographic/hydrographic survey; LiDAR;
bathymetry; SUE (QL-A through QL-D); GIS and geospatial deliverables.
Design Deliverables & Standards: plans and specifications suitable for advertisement; design analysis; BIM deliverables (USACE BIM/for-Infrastructure standards); CADD (e.g., MicroStation/AutoCAD) and GIS standards; model coordination and clash detection.
Engineering Services During Construction (ESDC): submittal review; RFIs; shop drawing review; field/onsite design support as requested; City Council Meeting representation.
Cost, Schedule, and Risk: parametric and detailed cost engineering; MCACES/MII estimates; P6 schedule development; design quality/risk management; value engineering; constructability reviews; DrChecks coordination; RMS familiarity.
Quality & Safety: Design Quality Control (DQC); Independent Technical Reviews (ITR) coordination; QC plans; USACE Three-Phase Control System familiarity;
safety and environmental compliance in design.
5. SUBMISSION INSTRUCTIONS – CAPABILITY STATEMENT
Interested firms are invited to submit a concise capability statement addressing the items below. Do not submit SF330s at this time; the Government may request them later. Limit total response to 10 pages (8½"×11", 11-pt minimum, one-inch margins). One attachment (firm brochure) up to 2 additional pages.
A. Firm Information Company name, UEI, CAGE, address, website, and year established.
Point(s) of contact (name, title, email, phone).
Business size & socio-economic status(es) under NAICS 541330 (e.g., Small
Business, 8(a), HUBZone, SDVOSB, WOSB, EDWOSB), including size determination method and current SBA certification(s), if applicable.
Primary oƯice(s) supporting this work and proximity to Charleston, SC.
Joint Venture/MP/CTA structure if applicable (identify managing member;
provide copy of JV agreement if readily available) and Small Business Participation/Utilization approach for large businesses.
B. Relevant Experience (Recent: Past 10 Years) Provide up to five (5) projects demonstrating similar scope, magnitude, and complexity, especially: coastal storm risk management; storm surge walls/levees;
large gate structures; hydraulic pump stations; living shoreline design and construction; nonstructural floodproofing/elevation programs; multi-disciplinary mitigation and compliance. Include: client/owner; contract number; contract type; role (prime/sub); completion year; construction value; your fee; brief scope; key outcomes;
and customer CPARS or references if available.
C. Technical Capabilities & Key Disciplines Describe in-house and team capabilities covering Section 4 disciplines. Identify Key Personnel (by discipline), licensure (SC PE/RA where applicable), certifications, and level of eƯort availability. Highlight modeling tools (e.g., ADCIRC/SWAN, HEC-RAS 2D, CFD), BIM/CADD platforms, SCADA/ICS expertise, and cybersecurity controls.
D. Program/Project Management & QA/QC
Outline A-E program management approach for a high-capacity SATOC; task order staƯing; Design Quality Control processes; ITR coordination; schedule management (P6); cost engineering (MII); risk management; Value Engineering; constructability reviews; and configuration/data management. Describe experience with USACE deliverables, including DrChecks, RMS, SDSFIE/GIS, and BIM standards.
E. Additional Considerations
Small Business Strategy: For large businesses, describe approach to meaningful small business participation and potential subcontracting plan elements.
Capacity & Surge: Demonstrate ability to support multiple, concurrent task orders and meet accelerated design schedules.
Compliance & Permitting: Experience coordinating with Federal, State, and local entities (e.g., SHPO, USFWS, NOAA, SCDHEC, City of Charleston).
Sustainability & Resilience: Approach to life-cycle cost, durability, climate resilience, and nature-based features.
F. Page Count & File Format
Limit: 10 pages (PDF preferred; searchable; <25 MB).
File name convention: FirmName_AE-SATOC_CharlestonPeninsula_SS.pdf.
6. SUBMISSION & DUE DATE
Email responses to: allison.m.blount@usace.army.mil and evelyn.i.halliburton@usace.army.mil Subject line: Sources Sought – A-E SATOC – Charleston Peninsula Due: 2:00 PM Eastern Time, November 7, 2025.
Proprietary Information: Mark and segregate any proprietary or competition-sensitive information. The Government will handle marked information in accordance with applicable regulations and will not return submissions.
7. INDUSTRY FEEDBACK REQUESTED
To inform acquisition planning, respondents are encouraged (but not required) to comment on:
Anticipated subcontracting opportunities and meaningful small business participation percentages.
Key risks to design execution and schedule, and mitigation recommendations.
Any barriers to competition or unique qualifications critical to success.
8. NOTICE
The Government anticipates that any resultant procurement will follow FAR 36.6 procedures using SF 330 Architect-Engineer Qualifications for selection criteria if/when a solicitation is issued. Monitor SAM.gov for future announcements. No debriefs or individual feedback will be provided from this Sources Sought.
END OF SOURCES SOUGHT NOTICE