Sources Sought Notice (SSN).pdf

PDF 176 KB Posted

Attached to
C4/D5 MOTOR DISPOSAL Federal contract opportunity
Solicitation number
N0003026R2043
Issued by
Department of the Navy Strategic Systems Programs

About this file

This Sources Sought Notice (SSN) is issued by Strategic Systems Programs (SSP) to conduct market research for disposal of Trident I (C4) and Trident II (D5) First, Second, and Third Stage missile motors located at Hill Air Force Base, Utah. The anticipated five-year Indefinite Delivery/Indefinite Quantity (IDIQ) contract will require a contractor with a SECRET facility clearance to perform disassembly, propellant removal, and disposal operations, as well as periodic motor examinations and transportation investigations.

Interested firms must submit a 5-page white paper capability statement by November 4, 2025, demonstrating relevant experience with annual costs of at least $4.5M within the past 5 years. The government is seeking engineering services (NAICS 541330) and is open to set-asides for small businesses, including veteran-owned, service-disabled veteran-owned, HUBZone, disadvantaged, and women-owned small business concerns. Contract line items (CLINs) will be Cost-Plus-Fixed-Fee (CPFF) and Firm-Fixed-Price (FFP), with work to be performed at the contractor's facility and final disposal at the Utah Test and Training Range.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNCLASSIFIED

C4/D5 MOTOR DISPOSAL

HILL AIR FORCE BASE, UTAH

1.0 Product Service Code (PSC)

R425 - Support- Professional: Engineering/Technical

2.0 North American Industry Classification System (NAICS) Code

The applicable North American Industry Classification System (NAICS) code is 541330 –

Engineering Services.

3.0 Contracting Office Address

Strategic Systems Programs (SSP)

1250 10th Street, Suite 4600

Washington DC 20374

4.0 Synopsis

This is a SOURCES SOUGHT NOTICE (SSN) announcement. SSNs are issued to assist the

Agency in performing market research to determine industry interest and capability. No proposals are being requested or accepted with this synopsis. THIS IS NOT A SOLICITATION

FOR PROPOSALS AND NO CONTRACT SHALL BE AWARDED FROM THIS SYNOPSIS.

Therefore, no proposals are being requested or accepted in response to this SSN.

5.0 Purpose

In accordance with (IAW) Federal Acquisition Regulation (FAR) Part 10, SSP is conducting market research to determine if sources are capable of successfully performing the requirements identified in this SSN. Specifically, SSP is seeking capable firms of providing for the disposal of

Trident I (C4) or Trident II (D5) First, Second, and Third Stage motors in support of the Trident

Missile Program. SSP is seeking concise capability statements (restricted to no more than five

8.5 X 11 inch pages, in a font no smaller than 10 point) which identify the vendor’s current capabilities to perform/execute the requirements identified in Section 8.0. Potential sources must have a security clearance, and have demonstrated capability to provide support to the disposal operations at the Utah Test and Training Range located on Hill Air Force Base.

This contract would be an IDIQ contract, estimated to be five years. CLINs would be CPFF and

FFP.

NOTE: Given the highly technical nature of SSP’s mission set as a major weapons systems command and corresponding technical requirements, respondents must provide recent and relevant past performance data (as detailed below) to demonstrate and substantiate the respondents ability to successfully execute requirements detailed in this SSN.

6.0 White Paper Capability Statement Credentials

a. SSP is seeking detailed, complete, and thorough White Paper capability statements from interested firms who can demonstrate and document, with evidentiary support, that they 1) possess the minimum qualifications and experience identified in paragraph 7.0 which are critical to the successful execution of the requirements, and 2) demonstrate recent and relevant experience, as the Prime contractor (or subcontractor) performing the same/similar efforts of the same/similar scope, size, and complexity to the enclosure (1) SSN SOW requirements identified in paragraph 8.0. Interested firms must demonstrate their existing capability, or potential to acquire the capability, to meet the enclosure (1) SSN SOW requirements by the time of contract award, estimated to be June 2026.

6.1 Small Business Concerns

IAW FAR Subpart 19.2 Polices, SSP seeks to provide maximum practicable opportunities in its acquisitions to small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns. Small Business Concerns who possess the minimum qualifications and experience identified in paragraph 7.0 and who can demonstrate its concerns’ capability (or ability to obtain the capability by the contract award date) to execute the complete requirements identified in the enclosure (1) SSN SOW in paragraph 8.0, as well provide the requisite past performance experience detailed in Section 9.0, are encouraged to respond to this SSN.

If a small business concern intends to partner with another entity, the small business concern must identify which specific enclosure (1) SOW efforts/tasks it intends to perform, as well as the specific efforts/tasks the partner will perform, with the substantiating data required in this SSN supporting the identified partnering roles and responsibilities. NOTE: 100% of the enclosure (1)

SOW and SSN requirements must be addressed in any submitted partnering submittal, if obtainable.

NOTE: In the event this contract is set aside for small business concerns, the small business concern agrees that it will be in strict compliance and conformance with the percentage payment limitations for services, supplies, or construction (as applicable) to subcontractors that are not similarly situated entities in accordance with FAR 52.219-14 Limitations on Subcontracting and state such in their response.

7.0 Minimum Qualifications / Experience Requirements

Interested firms shall document and submit specific and evidenced / demonstrated possession of the minimum qualifications and experience requirements in the technical areas identified in bullets a through c below which are critical to the successful execution of the enclosure (1) SSN

SOW requirements in paragraph 8.0. This experience shall be documented as specified in paragraph 9.0. SSP requires contractor support to perform the following operations on each

C4/D5 First Stage, Second Stage, and Third Stage motor:

a. Disassembly operation

b. Propellant Removal operation

c. Disposal operation

The contractor will also need to do the following:

a. Periodically examine C4 propellant fins and C4 or D5 motors, provided by the government, for propellant degradation and softening over a two year period in order to better understand propellant aging and motor safety concerns.

b. Conduct investigations, as directed by the Government, to determine the acceptability of various storage, handling, and transportation approaches for

C4/D5 motors.

c. Inspect, maintain, repair, modify and document effort associated with

Government owned or controlled Special Support Equipment and Tooling needed to transport First, Second, and Third stage fleet ballistic missile rocket motors.

8.0 Description of Requirements

See enclosure (1) SSN SOW Requirements.

8.1 Place of Performance

The disassembly and propellant removal shall occur at the contractor’s facility. The contractor will then transport the components to the Utah Test and Training Range located on Hill Air Force

Base for disposal operations.

9.0 Evidentiary Qualifications/Experience Documentation Requirements

Interested firms must possess the requisite minimum qualifications and experience identified in paragraph 7.0 and demonstrated relevant and recent experience as it relates to the enclosure (1)

SOW requirements in paragraph 8.0. White Paper Capability statements must include all of the content and details identified below:

9.1 Minimum Qualifications / Experience Requirements Validation

White Paper Capability statement submissions shall include a discrete section with the heading

“Minimum Qualifications / Experience Requirements” and document, with specific information, each of the minimum qualifications identified in paragraph 7.0. This section may cite contract reference efforts detailed in Table A of paragraph 9.2 below provided that respondents provide context and rationale as to how that contract reference effort(s) demonstrate possession of the applicable Minimum Qualifications / Experience requirements of bullets a through c identified in paragraph 7.0 – or have capability of obtaining by contract award.

9.2 Relevant & Recent Experience / Supporting Narratives

In addition to demonstrating possession of the requisite Minimum Qualifications / Experience requirements identified in paragraph 7.0 above (or have capability of obtaining by contract award), interested firms shall demonstrate relevant and recent experience performing the same or similar efforts and or completion tasks (as applicable) to the enclosure (1) SSN SOW requirements in paragraph 8.0. Relevant experience is defined as performing efforts/tasks similar in scope, size, and complexity as the enclosure (1) SSN SOW requirements with an annual incurred cost/expense of at least $4.5M. Recent experience is defined as work performed within

5 years of the SSN posting date. To substantiate the performance of relevant and recent efforts/tasks to the enclosure (1) SSN SOW requirements, White Paper Capability statements shall provide a list of current or previous contract references and the efforts/tasks performed thereunder detailing and evidencing a direct correlation of the contract reference efforts/tasks to the enclosure (1) SSN SOW using the specific outline provided in Table A below. Submitter’s responses to the Table A SSN CLIN SOW outline shall include the following information per individual contract reference:

(i) Summary of relevant work performed and how that specific work demonstrates capability to perform the specific requirements identified in the enclosure (1)

SSN SOW requirements;

(ii) Current / Prior Contract Number(s) and Customer/Agency Supported;

(iii) Identification of your role as the Prime or Subcontractor;

(iv) Contract Type;

(v) Period of performance of the specific contract reference effort performed;

(vi) Quantity of FTE personnel utilized on the specific contract reference effort, per annum, with distinction and FTE quantities identified between the respondents

FTE employees and any subcontractor FTE employees;

(vii) Net Dollar value (base and options) for each contract reference and the Annual

Incurred costs for each contract reference provided which demonstrates the magnitude of those contract references in comparison to the annual estimated value cited in paragraph 9.2 above. NOTE: solely citing an IDIQ ceiling amount or base and all options aggregate value without the annual incurred costs for the submitted contract reference(s) is NOT acceptable – amounts must be specific to the actual incurred costs for a Contract CLIN(s) or Individual Task Order(s), for the contract reference(s) cited in Table A below; and

(viii) Customer point of contact with valid phone number and email.

TABLE A – SUMMARY OF RELEVANT & RECENT WORK EXPERIENCE

SSN SOW

CLIN

Requirement

Contract Reference(s) Summary – Document the specific correlation of the contract reference efforts/tasks to the enclosure (1) SSN SOW

CLIN efforts/tasks

0001 Program Management

Support

0002 FS, SS, and TS

Disassemble and

Inspection, D5 SS and TS

Motor Transport, and SS and TS Motor Storage, and Disposal

0003 D5 Tool, Hardware &

Special Studies

0004 D5 Fleet Returned Motor

Aging Studies

0005 D5 FS, SS & TS Motor

Receipt and Processing

FS Motor Transport, Storage, and Disposal

0006 Contract Data

Requirements

List(CDRLs)

0007 Contractor Acquired

Property (CAP)

10.0 Company Information and Deadline for Submittal

White Paper Capability statements shall be submitted in Microsoft Word for Office 2000 compatible format or PDF format and are due no later than 04 November 2025, 4:00pm EST.

The White Papers shall not exceed 5 pages in total, using 12-point Times New Roman and 1” margin and shall be submitted via e-mail to Amanda.Beall@ssp.navy.mil. NOTE: The page count, font size, and margin requirements apply to the entire SSN response, to include any Cover

Page, Attachments, Headers, Footers, etc. “excluding” the Company Administrative Information below.

The Government is seeking detailed content and responses to the SSN requirements over any promotional details, pictures, etc.

ALL White Paper Capability submittals shall include the following Company Administrative

Data which is“NOT” included in the aforementioned maximum 5-page limit:

1. Company Administrative Information

a. Company Name:

b. Company Point of Contact (email and phone) and Title:

c. Company Address:

d. Unique Entity Identifier (UEI) No:

e. Cage Code:

2. Size of business, including; total annual revenue, by year, for the past five years and number of employees;

3. Ownership, including whether: small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns;

4. Number of years in business;

5. Identification of the current security clearance held at your facility that will provide support to the enclosure (1) SOW requirements. NOTE: Work to be performed under this contract shall require the contractor to have a facility clearance of SECRET and a computing facility that is cleared to process

SECRET data.

Respondents to this SSN shall indicate which portions of their response are proprietary/business sensitive and should mark them accordingly. It is the responsibility of the SSN respondent to monitor the sam.gov website for additional information pertaining to any potential acquisition.

11.0 Government Assessment

The White Paper Capability statement responses to this SSN must meet the requirements stated in the SSN and will be reviewed to determine whether each respondent is capable of performing the requirements. This review will be based solely on the specific data and supporting content provided by the respondents in their White Paper Capability statement submissions and responses mailto:Amanda.Beall@ssp.navy.mil to any follow on clarification inquires submitted by the Government. Incomplete or generalized

White Paper Capability statements, without specificity as it relates to the SSN content requirements, omitted content, or content which fails to address all of the requirements of this

SSN, will have a direct affect upon the Government’s assessment of the White Paper submittal.

The Government’s assessment will include, but is not limited to, the following:

(1) The respondent’s specific and evidenced / demonstrated possession of the Minimum

Qualifications / Experience requirements identified in paragraph 7.0;

(2) The respondent’s demonstrated ability to manage, as a Prime or Subcontractor, the types and magnitude of requirements identified in the enclosure (1) SSN SOW requirements based on their relevant and recent performance of same/similar efforts/tasks in terms of scope, size, and complexity;

(3) The respondent’s demonstrated technical ability, as a Prime or Subcontractor, to execute the enclosure (1) SSN SOW requirements based on their relevant and recent performance of same/similar efforts/tasks in terms of scope, size, and complexity; and

(4) The respondent’s demonstrated capacity to execute the enclosure (1) SSN SOW requirements based on their relevant and recent performance of same/similar efforts in terms of scope, size, and complexity, the quantity of personnel required, and the contract award date.

12.0 SSN Disclaimer

This SSN is issued solely for Market Research purposes. It does not constitute a Request for

Proposal (RFP) nor a promise to issue an RFP in the future. This SSN does not commit the

Government to solicit or award a contract. The information provided in the SSN is subject to change and is not binding on the Government. Respondents are advised that ALL costs associated with responding to this SSN, including any requests for follow-up information, will be solely at the interested parties’ expense and the Government will not pay for any information or costs incurred or associated with submitting a SSN White Paper Capability statement or follow-on responses.

The Government reserves the right to consider a set-aside for small businesses or one of the small business preference groups. (e.g., small business, service-disabled veteran-owned small business, 8(a), HUBZone small business, and women-owned small business programs).

File details come from the government source that posted it. Updated .