FY26 Sabine-Neches Waterway, Texas Maintenance Dredging
Solicitation number
W912HY26X1AOP
Issued by

About this file

This Sources Sought Synopsis is issued by the U.S. Army Corps of Engineers, Galveston District for FY26 Sabine-Neches Waterway Maintenance Dredging in Texas. The project involves maintenance pipeline dredging of the Sabine River, with options for the Neches River and Sabine Pass, totaling approximately 1.5 million cubic yards for the base schedule and additional options ranging from 215,000 to 1.3 million cubic yards. The estimated construction price range is between $25 million and $100 million, with a completion time of 150 calendar days for the base work and 200 calendar days for options.

The synopsis seeks information from small businesses, including 8(a), HUB-Zone, Service-Disabled Veteran-Owned, Women-Owned, and Economically Disadvantaged businesses. Interested firms must respond by September 22, 2025, at 10:00 AM CDT, providing details such as their Unique Entity Identifier, contact information, and demonstration of experience in comparable dredging projects. The anticipated solicitation will be issued in May 2026, with proposals due in June 2026 and an estimated award in July 2026. Firms must be registered in SAM.gov and can submit their responses via email to specified U.S. Army Corps of Engineers contacts.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOURCES SOUGHT SYNOPSIS

TITLE: FY26 Sabine-Neches Waterway, Texas Maintenance Dredging

Notice Type: SOURCES SOUGHT SYNOPSIS

Source Sought Number: W912HY26X1AOP

Response Date (10 days) September 25, 2025

The U.S. Army Corps of Engineers, Galveston District has a requirement for the above subject. THIS IS A NOTICE FOR SOURCES SOUGHT ONLY. THIS

ANNOUNCEMENT SEEKS INFORMATION FROM INDUSTRY, WHICH WILL BE

USED FOR PRELIMINARY PLANNING PURPOSES. THIS IS NOT A REQUEST FOR

PROPOSAL OR INVITATION FOR BID. THERE IS NO BID PACKAGE,

SOLICITATION, SPECIFICATION OR DRAWINGS AVAILABLE WITH THIS

ANNOUNCEMENT. IT DOES NOT CONSTITUTE A PROCUREMENT COMMITMENT

BY THE US ARMY CORPS OF ENGINEERS, IMPLIED OR OTHERWISE. NO

CONTRACT WILL BE AWARDED FROM THIS SOURCES SOUGHT

ANNOUNCEMENT. REPONSE IS STRICTLY VOLUNTARY; NO REIMBURSEMENT

WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION

IN RESPONSE TO THIS SOURCES SOUGHT ANNOUNCEMENT OR ANY FOLLOW-

UP INFORMATION REQUESTS. RESPONDENTS WILL NOT BE NOTIFIED OF THE

RESULTS OF THE EVALUATION.

The purpose of this synopsis is to gain knowledge of interest, capabilities, and qualifications of various members of industry, to include the Small Business Community:

Small Business, Section 8(a), Historically Underutilized Business Zones (HUB-Zone), Service-Disabled Veteran-Owned Small Business (SDVOSB), Economically Disadvantaged (ED/Woman Owned (WO), Woman Owned (WO) and Woman-Owned Small Business (WOSB). Th e Government must ensure there is adequate competition of responsible firms.

A previous Sources Sought Notice was posted to SAM.gov on May 01, 2025. The Scope of Work for this project has changed, therefore an updated Sources Sought Notice is required.

Project Information: FY26 Sabine-Neches Waterway Maintenance Dredging that will include maintenance pipeline dredging of Sabine-Neches Waterway Sabine River with options in Neches River and Sabine Pass. This contract will not be subject to environmental windows. Placement of material will include beneficial use sites and upland confined placement. Schedule 1 will consist of maintenance dredging of the Sabine River reach, totaling approximately 1.5 million cubic yards. Material placement will take place in the Hickory Cover marsh beneficial use site. Option 1 will consist of maintenance dredging of the Neches River of approximately 1.3 million cubic yards with placement in WMA Nelda Start Unites 1A, 1B, and 1C. Option 2 will consist of maintenance dredging of the Port of Beaumont of approximately 300,000 cubic yards with placement in PA 25 and PA 26. Option 3 will consist of maintenance dredging of the Port of Port Arthur Berths of approximately 215,000 cubic yards with placement in PA 9A and 9B. Option 4 will consist of maintenance dredging of the SNWW Junction and Eyeball within the Sabine Pass reach of approximately 339,000 cubic yards with placement in PA 9A and PA 9B. Additional calendar days will be added to the contract duration for each option if awarded.

The completion time of the work is 150 calendar days.

Completion time for options is 200 calendar days.

In accordance with DFARS 236.204, the estimated construction price range for this project is: Between $25,000,000 and $100,000,000.

All construction performance must comply with the USACE Safety and Health Requirements Manual, (EM 385-1-1, and must also comply with all Federal, State and local laws, ordinances, codes and/or regulations.

The North American Industry Classification System code for this procurement is 237990 which has a small business size standard of $37 million.

The Product Service Code is Z1KB.

Small Businesses are reminded under FAR 52.219-14, (Deviation 2021-O0008), Limitations on Subcontracting. Firm will not pay more than 85% of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the prime contractor’s 85% subcontract amount that cannot be exceeded.

Prior Government contract work is not required for submitting a response to this announcement.

Contractor may demonstrate any construction experience as a prime contractor working on Dredged Material Placement Areas.

Bonding Requirements: Performance and Payment Bonds are required within 5 calendar days after award, and the contractor shall begin work within 10 calendar days after receipt of the Notice to Proceed.

If the contractor fails to complete the work within the time specified, the contractor shall pay liquidated damages to the Government in the estimated amount of $3,000.00 for each calendar day of delay until the work is completed or accepted.

FIRMS RESPONSE SHALL INCLUDE THE FOLLOWING INFORMATION:

1. Unique Entity Identifier (UEI) & Commercial and Government Entity (CAGE) (This information can be obtained from your System for Award Management (SAM) Registration at www.sam.gov ).

2. Name of firm w/ address, phone, fax, e-mail address, and point of contact.

3. Indicate whether your firm will submit a bid for this project if set-aside for Small Business (SB), 8(a) Small Business Development Program, Historically Underutilized Business Zones (HUB-Zone), Service-Disabled Veteran Owned Small Business (SDVOSB), Economically Disadvantaged (ED/Woman Owned (WO), Woman Owned (WO) Woman-Owned Small Business (WOSB).

4. Firm’s Joint Ventures (existing), including Mentor Protégés and teaming arrangement information is acceptable.

Qualifications: Responses to this source sought announcement shall indicate specialized experience and technical competence in:

a. Demonstrate experience in completing work outlined under the paragraph above for “Project Information.”

1. Firm’s capability to perform the magnitude and complexity outlined in the Scope of Work above or comparable work performed within the past 5 years):

2. Brief description of each project, customer name, and dollar value of the project)– provide at least 3 examples.

3. Firm’s Bonding Capacity (Bid Bond (20% of total bid amount), Performance and Payment Bond (100% of the contract amount) bonding level per contract and aggregate construction bonding level, both expressed in dollars.

http://www.sam.gov/

Firms responding to this announcement, who fail to provide ALL required information requested and outlined above, may be excluded from further consideration in the review and analysis for acquisition strategy determination.

Anticipated solicitation issuance date is on or about May 2026, and the estimated proposal/bid due date will be on or about June 2026. Estimated award on or about date is July 2026.The official synopsis citing the solicitation number will be issued on Procurement Integrated Enterprise Environment (PIEE) https://piee.eb.mil/ inviting firms to register electronically to receive a copy of the solicitation when it is issued.

Interested Firm’s shall respond to this announcement no later than September 22, 2025, at 10:00 AM (CDT). All interested firms must be registered in SAM.gov to be eligible for award of Government contracts. Email your response to Ms. Sarah Eisele at Sarah.M.Eisele@usace.army.mil and Mirian Tudor at Mirian.R.Tudor@usace.army.mil.

https://piee.eb.mil/ mailto:Sarah.M.Eisele@usace.army.mil mailto:Mirian.R.Tudor@usace.army.mil