This is a Sources Sought notice from the U.S. Army Corps of Engineers, Galveston District seeking information about contractor capabilities for FY25 Channel to Port Mansfield maintenance dredging. The project involves maintenance dredging of approximately 1.92M CY total, with Schedule 1 comprising 1.35M CY and construction of 2,000 LF of rip-rap breakwater in 1-4 ft depths. Dredged material will be placed across Padre Island National Seashore beach and various nearby placement areas. The work must be completed within 240 calendar days and comply with environmental windows for sea grass, turtle nesting, and piping plover protection.
The project is valued over $10M with NAICS code 237990 and a small business size standard of $37M. Responses are due by February 21, 2025 at 10:00 AM CDT. The anticipated solicitation release is July 2025, with proposals due August 2025 and award in September 2025. Performance and payment bonds are required within 5 days of award, with liquidated damages of $4,200 per day for delays. Respondents must provide their UEI/CAGE codes, company information, socioeconomic status, joint venture details, and past performance on similar projects within the last 5 years. The government is assessing interest from small businesses including 8(a), HUBZone, SDVOSB, EDWOSB, WOSB, and WO firms.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOURCES SOUGHT SYNOPSIS
TITLE: FY25 Channel to Port Mansfield Maintenance Dredging Entrance Channel to Turning Basin with Beneficial Use Placement
Notice Type: SOURCES SOUGHT SYNOPSIS
Source Sought Number: W912HY25X14EW
Response Date (10 days) February 21, 2025
The U.S. Army Corps of Engineers, Galveston District has a requirement for the above subject. THIS IS A NOTICE FOR SOURCES SOUGHT ONLY. THIS ANNOUNCEMENT SEEKS
INFORMATION FROM INDUSTRY, WHICH WILL BE USED FOR PRELIMINARY PLANNING
PURPOSES. THIS IS NOT A REQUEST FOR PROPOSAL OR INVITATION FOR BID. THERE IS
NO BID PACKAGE, SOLICITATION, SPECIFICATION OR DRAWINGS AVAILABLE WITH THIS
ANNOUNCEMENT. IT DOES NOT CONSTITUTE A PROCUREMENT COMMITMENT BY THE US
ARMY CORPS OF ENGINEERS, IMPLIED OR OTHERWISE. NO CONTRACT WILL BE AWARDED
FROM THIS SOURCES SOUGHT ANNOUNCEMENT. REPONSE IS STRICTLY VOLUNTARY; NO
REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING
INFORMATION IN RESPONSE TO THIS SOURCES SOUGHT ANNOUNCEMENT OR ANY
FOLLOW-UP INFORMATION REQUESTS. RESPONDENTS WILL NOT BE NOTIFIED OF THE
RESULTS OF THE EVALUATION.
The purpose of this synopsis is to gain knowledge of interest, capabilities, and qualifications of various members of industry, to include the Small Business Community:
Small Business, Section 8(a), Historically Underutilized Business Zones (HUB-Zone), Service-Disabled Veteran-Owned Small Business (SDVOSB), Economically Disadvantaged (ED/Woman Owned (WO), Woman Owned (WO) and Woman-Owned Small Business (WOSB). Th e Government must ensure there is adequate competition of responsible firms.
Project Information: Maintenance dredging and advanced maintenance dredging of Channel to Port Mansfield (approximately 1.92 M CY) with BU placement. Schedule 1 will include maintenance dredging of approximately 1.35 million cubic yards (CY) of the Channel to Port Mansfield and will include varying advanced maintenance depths and construction of approximately 2,000 LF of rip-rap breakwater in varying depths from approximately 1-4 ft. Material will be placed beneficial use material across the Padre Island National Seashore beach along with various placement areas in the vicinity.
The completion time of the work is 240 calendar days.
Option line items will be included.
This contract will be subject to several environmental windows, including sea grass, turtle nesting, and pipeline plover. All work must be completed accordance with these windows to avoid impacts to bird nesting and turtle nesting, and monitors may be required to avoid impacts to piping plover. Placement of material will include both beach placement and upland confined placement.
In accordance with FAR 36/DFARs 236, the estimated construction price range for this project is: Over $10,000,000.00
All construction performance must comply with the USACE Safety and Health Requirements Manual, (EM 385-1-1, and must also comply with all Federal, State and local laws, ordinances, codes and/or regulations.
The North American Industry Classification System code for this procurement is 237990 which has a small business size standard of $37 million for Dredging and Surface Cleanup Activities.
The Product Service Code is Z1KF.
Small Businesses are reminded under FAR 52.219-14, (Deviation 2019-O0003), Limitations on Subcontracting. Firm will not pay more than 85% of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the 85% subcontract amount that cannot be exceeded.
Prior Government contract work is not required for submitting a response to this announcement.
Contractor may demonstrate any construction experience as a prime contractor working on Dredged Material Placement Areas.
Bonding Requirements: Performance and Payment Bonds are required within 5 calendar days after award and the contractor shall begin work within 10 calendar days after receipt of the Notice to Proceed.
If the contractor fails to complete the work within the time specified, the contractor shall pay liquidated damages to the Government in the estimated amount of $4,200.00 for each calendar day of delay until the work is completed or accepted.
FIRMS RESPONSE SHALL INCLUDE THE FOLLOWING INFORMATION:
1. Unique Entity Identifier (UEI) & Commercial and Government Entity (CAGE) (This information can be obtained from your System for Award Management (SAM) Registration at www.sam.gov ).
2. Name of firm w/ address, phone, fax, e-mail address, and point of contact.
3. Indicate whether your firm will submit a bid for this project if set-aside for Small Business (SB), 8(a) Small Business Development Program, Historically Underutilized http://www.sam.gov/
Business Zones (HUB-Zone), Service-Disabled Veteran Owned Small Business (SDVOSB), Economically Disadvantaged (ED/Woman Owned (WO), Woman Owned (WO) Woman- Owned Small Business (WOSB).
4. Firm’s Joint Ventures (existing), including Mentor Protégés and teaming arrangement information is acceptable.
Qualifications: Responses to this source sought announcement shall indicate specialized experience and technical competence in:
a. Demonstrate experience in completing work outlined under the paragraph above for “Project Information.”
1. Firm’s capability to perform the magnitude and complexity outlined in the Scope of Work above or comparable work performed within the past 5 years):
2. Brief description of each project, customer name, and dollar value of the project)– provide at least 3 examples.
3. Firm’s Bonding Capacity (Bid Bond (20% of total bid amount), Performance and Payment Bond (100% of the contract amount) bonding level per contract and aggregate construction bonding level, both expressed in dollars.
Firms responding to this announcement, who fail to provide ALL required information requested and outlined above, may be excluded from further consideration in the review and analysis for acquisition strategy determination.
Anticipated solicitation issuance date is on or about July 2025, and the estimated proposal/bid due date will be on or about August 2025. Estimated award on or about date is September 2025.The official synopsis citing the solicitation number will be issued on Procurement Integrated Enterprise Environment (PIEE) https://piee.eb.mil/ inviting firms to register electronically to receive a copy of the solicitation when it is issued.
Interested firms shall respond to this announcement no later than February 21, 2025, at 10:00 AM (CDT). All interested firms must be registered in SAM.gov to be eligible for award of Government contracts. Email your response to Ms. Sarah Eisele at Sarah.M.Eisele@usace.army.mil and Traci Robicheaux. At traci.d.robicheaux@usace.army.mil.
https://piee.eb.mil/ mailto:Sarah.M.Eisele@usace.army.mil mailto:traci.d.robicheaux@usace.army.mil
File details come from the government source that posted it. Updated .