Sources_Sought_Alaska_Peninsula_NWR_1.pdf
PDF 123 KB Posted
- Attached to
- GAOA - Alaska Peninsula NWR Float Plane Dock Replacement Federal contract opportunity
- Solicitation number
- 140FGA25R0012
About this file
This Sources Sought Notice is for the Floatplane Dock Replacement Project at the Alaska Peninsula National Wildlife Refuge in King Salmon, AK. The U.S. Fish & Wildlife Service (USFWS) is preparing to solicit a firm fixed-price construction contract to demolish and replace an existing float plane dock and potentially a boat ramp. The project scope includes constructing a new dock with components such as bulkhead, gangway, floating dock, grading, electrical systems, and a fuel tank, based on designs to be provided at solicitation.
Responses are due by 04/10/2025 at 2:00 PM EST and must be emailed to Samantha LaGue. All business categories are invited to respond, with submissions required to include: Unique Entity Identifier (UEI) number, business type, documented capability through 2-5 similar project examples, and a statement of capacity to complete the work. The primary NAICS code is 237990 (Other Heavy and Civil Engineering Construction) with a $45 million size standard. The project is located at the King Salmon Fish and Wildlife Campus, where a previous dock system failed during a storm in 2018, necessitating this replacement effort.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sources Sought
Floatplane Dock Replacement Project Alaska Peninsula National Wildlife Refuge – King Salmon, AK
This is a Sources Sought Notice for the purposes of conducting market research and obtaining industry information ONLY. This is NOT a request for proposal, quotation, or bid, nor a synopsis of a proposed action under FAR Subpart 5.2. No reimbursement will be made for any costs associated for providing information in response to this synopsis or on any follow up information. No solicitation is currently available. The U.S. Fish & Wildlife Service (USFWS) will use information obtained through this synopsis as well as other market research to develop an acquisition strategy.
Summary:
The USFWS is anticipating the solicitation and award of one firm fixed price alt repair construction contract. The work under this contract is expected to include, but is not limited to the following:
Demolish and dispose of the existing float plane dock and boat ramp then construct all components of the new float plane dock to include bulkhead, gangway, floating dock, grading, electrical, fuel tank, with an option to replace the boat ramp. This project is to be constructed per completed designs and specifications that will be provided at the time of solicitation.
The primary purposes of the Alaska Peninsula National Wildlife Refuge is to conserve fish and wildlife populations and habitats in their natural diversity including brown bears, the Alaska Peninsula caribou herd, moose, sea otters, and other marine mammals, shorebirds and other migratory birds, raptors including bald eagles and peregrine falcons, and salmonids and other fish.
The King Salmon Fish and Wildlife Campus uses a seasonal floating dock for water vessels and floatplanes. This floating dock is fixed to the shore on a permanent pier. The pier uses a driven steel pile foundation. The dock is fixed to the pier with the use of a rail system that allows horizontal restraint while allowing vertical movement along with the tidal flow. The dock end is also restrained with the use of underwater cable anchors in both the upstream and downstream directions. During the summer of 2018, the dock system failed during a storm event. The upper cable anchor failed, causing many of the dock segments to float downstream before being caught by the lower cable anchor. It is also apparent that the existing pier has some structural damage at the beam on the end of the pier.
The primary NAICS code for this acquisition will be 237990 - Other Heavy and Civil Engineering Construction and the size standard is $45 Million.
Response Requirements:
All business categories are invited to respond. Responses must include the following:
• Unique Entity Identifier (UEI) number and business type (i.e. Large Business, Small Business, (SB), Small Disadvantaged Business (SDB), Woman Owned Small Business (WOSB), Veteran Owned Small Business (VOSB), Service-Disabled Veteran Owned Small Business (SDVOSB), Historically Underutilized Business Zone (HUBZone), 8(a) Program or other).
• Document capability by providing a narrative response detailing a minimum of two (2) and a maximum of (5) projects similar to those detailed above. Project information shall include final price, location, date, and a narrative description.
• Include a statement detailing capacity to accomplish work required by the Service.
Responses shall be emailed to Samantha LaGue (Samantha_LaGue@fws.gov) no later than 04/10/2025 at 2:00 PM Eastern Standard Time.
| Summary: |
| Response Requirements: |
File details come from the government source that posted it. Updated .