This document contains a source sought questionnaire and related federal contract opportunity notice. The source sought questionnaire seeks information from industry to determine the appropriate acquisition strategy for a construction contract valued between $2 million and $3.4 million to repair Cells 2 and 3 of the Point Mouillee Confined Disposal Facility. The scope of work includes installing four culverts through interior dikes, removing vegetation including phragmites and small trees, consolidating and regrading previously placed dredged materials across 250 acres to connect the two cells into a single larger cell. Respondents are asked whether they have experience with excavating and hauling dredge materials and installing culverts and rodent barriers. The related federal contract opportunity is a pre-solicitation notice for the Point Mouillee Confined Disposal Facility repair and cleanup project to be conducted by the U.S. Army Corps of Engineers Detroit District.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
This survey seeks information from Industry to determine the appropriate acquisition strategy in support of a construction contract for Confined Disposal Facility (CDF) repairs to Cell 2 & 3 of Pointe
Mouillee for U.S. Army Corps of Engineer, Detroit District. Your participation is appreciated.
Background information on potential project:
The project will address the backlog of maintenance material at the Point Mouillee
Confined Disposal Facility (CDF) to prepare for the upcoming dredging actions. Scope is anticipated to include: The installation of 4 culverts through the interior dike(s), removing vegetation, and performing material management across 250 acres of Cells 2 and 3. Vegetation removal includes phragmites and scattered small trees. Previously placed dredged material would be consolidated from the southeastern half of cells 2 and
3 by excavating and hauling material to the northwestern half of cells 2 and 3. The fill location would be spread evenly, and the excavated area will be graded to ensure it drains well to the cell 2 weir. Culverts to be installed in the cross dikes between cells 2 and 3 to allow water to flow between the cells. Goal is to connect the two cells into one large cell instead of two smaller cells, while building capacity for future dredge material.
Name of Firm: __________________________________
Address: ___________________________________
City: ________________________ State: _____________ Zip: _______________
UEI: _____________________________ CAGE Code: __________________
Point of Contract: _____________________ Telephone: ___________________
Email Address: _______________________
1. Does your firm have a current registration in the System for Award Management (SAM)
____ Yes ____ No
2. Business Size Standard: Mark all that apply. See Code of Federal Regulations, Title 13, Chapter 1, Part 121 – Small Business Regulations.
____ Small Business
____ SDB Certified to include 8 (a)
____ Service-Disabled Veteran Owned Small Business (SDVOSB)
____ HUBZone
____ Women-Owned Small Business (WOSB)
____ Large Business
3. Does your SAM profile show the North American Classification (NAICS) Code 237990 (Other Heavy and Civil Engineering Construction) on your assertions?
4. Has your firm performed the following work under NAICS 237990 for Civil Engineering Construction?
____ excavating and hauling dredge material
____ installation of Culverts for cross dikes
____ installation of rodent barrier protection
Attach a one-page document descripting the title of the project/description/magnitude/ period of performance/dollar value and the roll in which you performed for EACH type of work performed within the last 5 years.
5. Is your firm capable of performing a civil construction contract for a magnitude of construction between $2,000,000 and $3,400,000.
6. Please, provide your Bonding Capability
Individual Contract Bonding Capacity: $_________________
Aggregate Contract Bonding Capacity: $ _________________
| Name of Firm: |
| Address: |
| State: |
| Zip: |
| undefined: |
| UEI: |
| CAGE Code: |
| Telephone: |
| undefined_2: |
| Email Address: |
| Yes: |
| No: |
| Small Business: |
| SDB Certified to include 8 a: |
| ServiceDisabled Veteran Owned Small Business SDVOSB: |
| HUBZone: |
| WomenOwned Small Business WOSB: |
| Large Business: |
| Aggregate Contract Bonding Capacity: |
| undefined_3: |
| Check Box1: Off |
| Check Box2: Off |
| Check Box3: Off |
| Check Box4: Off |
| Check Box5: Off |
| Check Box6: Off |
| Check Box7: Off |
File details come from the government source that posted it. Updated .