SCOPE OF SERVICES
FOR
CLOSED LOOP COOLING TOWER WATER TREATMENT SERVICE
PROJECT #20190508
AT
U.S. COAST GUARD SECTOR KEY WEST
100 TRUMBO ROAD
KEY WEST, FL 33040
Feb 2020
US Coast Guard Sector Key West Project #20190508 Closed Loop Cooling Tower Water Treatment Service
TABLE OF CONTENTS TOC-1 / 1
TABLE OF CONTENTS
DIVISION 1 - GENERAL REQUIREMENTS
011000 SUMMARY OF WORK
ENCLOSURES
1. BUILDING 102 MECHANICAL DRAWINGS
2. UEPH MECHANICAL DRAWINGS
END OF CONTENTS
SUMMARY 011000 - 1 / 4
SECTION 011000 - SUMMARY
PART 1 - GENERAL
1.1 SUMMARY
1.2 PROJECT INFORMATION
A. Project Identification: Closed Loop Tower Water Treatment Service - Project #:
20190508
1. Project Location: 100 Trumbo Road – Key West, FL 33040.
1.3 PRE-BID SITE VISIT
A. Contractors are permitted and encouraged to visit the site prior to submitting bids. Site visits will be held on a case by case basis. To arrange for a site visit please contact a Sector Key West Engineering Staff Member. Contact information is as follows:
1. Name: LT Liam McCue
Engineering Officer Email: Liam.P.McCue@uscg.mil Phone: (305) 292-8756 Mobile: (305) 797-2086
2. Name: MKC Daniel Payne Email: Daniel.A.Payne@uscg.mil Phone: (305) 292-8830
1.4 WORK COVERED BY CONTRACT DOCUMENTS
A. The work of project is defined by the contract documents and consists of the following:
1. In general, Coast Guard Sector Key West intends to establish a term contract for furnishing water treatment chemicals and equipment to maintain a closed loop cooling tower water treatment program.
2. The Coast Guard’s goal is to keep the cooling towers free of insulating deposits such as scale, corrosion, biological growths and sludge that promote high energy consumption and equipment failure. This contract is inclusive of all aspects, materials, labor and equipment necessary to prevent these deposits.
SUMMARY 011000 - 2 / 4
1.5 CONTRACTOR QUALIFICATIONS
A. The contractor shall be in compliance with any applicable federal, state, local, ANSI, and OSHA laws, rules and regulations.
B. The contractor shall have been conducting business for a MINIMUM of five (5) years treating industrial, commercial, or institutional cooling systems. The contracted firm shall have a verifiable record of servicing Florida customers who have chilled water systems similar to the Coast Guards.
1.6 WORK SEQUENCE
A. The work shall be conducted by the contractor to provide the least possible interference to the activities of government personnel.
1.7 WORK BY GOVERNMENT
A. General: Cooperate fully with Government so work may be carried out smoothly, without interfering with or delaying work under this contract or work by Government.
Coordinate the work of this contract with work performed by Government.
1.8 ACCESS TO SITE
A. General: During the construction period, the contractor shall have limited use of project site for construction operations as indicated on drawings, as indicated by requirements of this Section, and as specified by the Contracting Officer.
1. Material storage and work areas shall be as designated by the Contracting Officer’s Representative (COR).
1.9 WORK RESTRICTIONS
A. Work Restrictions, General: Comply with restrictions on construction operations.
1. Comply with limitations on use of public streets and with other requirements of authorities having jurisdiction.
B. On-Site Work Hours: Limit work in the existing building to normal business working hours of 8:00 a.m. to 4:00 p.m., Monday through Friday, unless otherwise indicated.
1. Submit request to the COR at least 72 hours in advance for permission to work outside the normal working hours or on Saturdays, Sundays, or federal holidays.
2. Submit request to the COR at least 72 hours in advance of proposed utility interruptions.
SUMMARY 011000 - 3 / 4
1.10 SITE MAINTENANCE
A. The contractor shall perform daily cleanup of work site. All trash and debris from maintenance shall be removed daily when the contractor is finished. Debris shall not remain overnight on Coast Guard property.
1.11 SCOPE OF WORK FOR COOLING TOWERS
A. Contractor shall develop a comprehensive chemical treatment program for the cooling towers based on location and anticipated risk to the cooling towers. Contractor shall provide and install all necessary chemical feed equipment on each tower. Contractor shall also provide necessary treatment chemicals.
B. Monthly, a contractor’s service representative shall test all onsite equipment to ensure equipment is operating properly and make any necessary repairs or equipment replacement. Contractor shall replace defective water treatment equipment at contractors cost. Service representative shall also check chemical storage levels to ensure treatment chemicals are sufficiently stocked. Failure to keep chemicals properly supplied after notice, may be cause for termination of the contract.
C. Contractor is responsible for the delivery, offload, and fill all chemical drums.
Chemicals shall be administered as an uninterrupted supply.
D. Monthly, the contractor shall also collect and analyze samples of treated water. Tests shall include but are not limited to: pH, conductivity, total alkalinity, calcium hardness, and appropriate scale and corrosion agents. Contractor shall test other necessary parameters as deemed appropriate for the Florida Key’s climate and geolocation.
E. Prior to each site visit, the contractor shall notify Coast Guard Sector Key West Engineering’s Mechanical Chief of their intended visit date for that month.
F. During each site visit, the service representative shall notify Coast Guard Sector Engineering Mechanical Chief of their arrival and review findings of the site visit.
Contractor shall provide a service report electronically to Coast Guard Sector Key West Engineering summarizing the visit, providing test results of the prior samples, and a statement of all parameters.
G. Contractor shall properly remove and dispose of all chemical containers properly from site upon depletion.
1.12 CHEMICAL DELIVERY
A. Chemical delivery shall be coordinated with the contracting officer’s representative and only delivered to the site as needed. Bulk extra chemicals shall not be stored onsite.
Contractor shall be responsible for the handling of all chemicals including unloading from delivery vehicles. Coast Guard employees shall not handle chemicals.
SUMMARY 011000 - 4 / 4
B. Contractor shall provide Material Safety Data cut sheets for every chemical used in treatment. Provide this submittal to the contracting officer’s representative prior to bringing chemicals onsite.
1.13 COOLING TOWER INFORMATION & SITE LOCATIONS
Site Location Cooling Tower Information Building 102 - Galley/Medical EVAPCO USS 14-89
UEPH - Barracks Marley Aquatower SPX
1.14 CONTRACT STRUCTURE
A. This contract shall be setup for a base year and four option years that the Coast Guard may choose to renew. Each contract year shall actually be for the Fiscal Year (i.e. FY 2020 starts 01 October of 2019 and runs to the end of September 2020. Contractor shall provide a proposal with Cost for servicing the two cooling towers in the following structure:
Contract Fiscal Year
Cooling Towers
Building 102 UEPH/Barracks Total Annual Price
Base Year (FY 2020)
Option Year 1 (FY 2021)
Option Year 2 (FY 2022)
Option Year 3 (FY 2023)
Option Year 4 (FY 2024)
END OF SECTION 011000
C:
B
A
L 3
KEY WEST
TOWER BUILDING
U®S®C®G® SECTOR
REPLACE COOLING
KEY WEST~
r;
L
FLORIDA
"----" AREA OF WORK
SITE PLAN ® ---·N
SCALE: NOT TO SCALE
USCG SECTOH KEY WEST I
VICINITY MAP ®
·-------4 N
SCALE: NOT TO SCALE
DRAWING INl)EX
SHT NO I DISCIPLINE
· · SHEET NO. I TITLE
GENERAL
1 G-01 COVER SHEET
MECHANICAL
2 M-01 NOTES & LEGEND
3 M-02 ' TEMPORARY SERVICE PLAN
4 M-03 DEMOLITION PLAN
5 M-04 NEW WORK PLAN
6 M-0$ SCHEDULES & DETAILS
ELECTRICAL
7 E-01 ' TEMPORARY ELECTRICAL PLAN
8 E-02 DEMOLITION PLAN
9 E-03 NEW ELECTRICAL PLAN
c
B
CONSULTANTS
U. S. COAST GUARD
CIVIL ENGINEERING UNIT
MIAMI
USCG. CEU MIAMI
15608 SW 117TH A.VE
MIAMI, FLORIDA 33177
ISSUE
A E PROJECT NO:
CAD FlLE NAME:
DESIGNED BY: AG
SCALE: AS SHOWN PLOT SCALE: 1:1
SHEET
I
REPLACE COOLING TOWER IN BLDG.
USCG SECTOR KEY WEST
KEY WEST
BUILDING 102
GENERAL
COVER SHEET
\c:~J .. -;x,•A~" l .. fEv...~ ~L~.~1,,\,·,,_;::._.~
APPROVING Of'ACER -
MBER [)
Fl I
DATE
2892084 M1923-D
DISCI NO
G-01 SHeET 1 OF 9
LPMcCue Typewritten Text Enclosure (1) c
A
I 2
GENERAL NEW WORK NOTES
1. PROVIDE ALL WORK AS INDICATED AND NOTED ON THE FLOOR PLANS, SCHEDULED ON THE
DRAWINGS AND AS DETAILED ON THE DRAWINGS HEREIN.
2. ALL SQUARE DIFFUSERS ARE 4 WAY THROW UNLESS NOTED OTHERWISE.
3. FIELD VERIFY ALL ASPECTS OF THE EXISTING CONDITIONS RELATED TO THIS JOB PRIOR TO
COMMENCING THE WORK.
4. VISIT AND CAREFULLY EXAMINE THOSE PORTIONS OF THE EXISTING BUILDING AND SITE
INCLUDED IN THE PROJECT SCOPE SO AS TO BECOME FAMILIAR WITH EXISTING CONDITIONS,
DIFFICULTIES AND PHASING REQUIREMENTS THAT WILL AFFECT EXECUTION OF THE CONTRACT
WORK.
5. ALL EXISTING DEVICES AND EQUIPMENT NOT SHOWN, AND IN AREAS OUTSIDE OF THE
PROJECT PHASE LIMITS OF CONSTRUCTION SHALL REMAIN ACTIVE. INSTALL NECESSARY ITEMS
AS REQUIRED TO MAINTAIN THE CONTINUITY TO EXISTING DEVICES AND EQUIPMENT THAT
REMAIN.
6. PERFORM WORK IN STRICT COMPLIANCE WITH THE ESTABLISHED WORK SCHEDULE BEING SET
FORTH BY THE GOVERNMENT. FURNISH ADEQUATE WORK FORCES, CONSTRUCTION SUPERVISION
AND EQUIPMENT, AND WORK SUCH HOURS, INCLUDING NIGHT SHIFTS AND OVERTIME OPERATIONS
IN ACCORDANCE WITH THE GOVERNMENT'S OPERATIONAL SCHEDULE. VERIFY AND COORDINATE.
7. PLANS AND SCHEMATICS ARE DIAGRAMMATIC ONLY AND SHOULD NOT BE SCALED. COORDINATE
HVAC WORK WITH ALL PLUMBING, FIRE PROTECTION, HVAC AND ELECTRICAL WORK AT THE
SO AS NOT TO CONFLICT IN LOCATION WITH OTHER WORK PERFORMED UNDER THIS
CONSTRUCTION CONTRACT.
8. BRING ANY CONFLICTS TO THE ATTENTION OF THE COR PRIOR TO THE INSTALLATION OF THE WORK. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE OF THE KO IN SITE
WRITING VIA AN RFI.
I 2
I
I
3 I
GENERAL DEMOLITION NOTES
1. VISIT AND CAREFULLY EXAMINE THOSE PORTIONS OF THE EXISTING BUILDING AND
SITE INCLUDED IN THE PROJECT SCOPE. BECOME FAMILIAR WITH EXISTING CONDITIONS,
DIFFICULTIES AND PHASING REQUIREMENTS.
2. ALL EXISTING WORK INDICATED FOR REMOVAL SHALL BECOME THE PROPERTY OF THE
CONTRACTOR. DISPOSE THIS WORK OFF-SITE:, IN A LAWFUL MANNER.
3. RESTORE ALL EXISTING TO REMAIN WORK DAMAGED DUE TO THE PROGRESS OF
CONSTRUCTION TO ITS INITIAL CONDITION AT NO ADDITIONAL COST TO THE OWNER.
THIS INCLUDES, IBUT IS NOT LIMITED TO, PIPING, SUPPORTS, EQUIPMENT & CONTROLS.
4. PIPING REMOVAL SHALL INCLUDE, BUT IS NOT LIMITED TO, THE COMPLETE REMOVAL
OF RELATED INSULATION., FITTINGS, VALVES CONTROLS & SUPPORTS.
5. CEASE ALL WORK IF ASBESTOS IS DISCOVERED AT ANY TIME DURING THE PROGRESS
OF THE DEMOLITION WORK. NOTIFY THE PROJECT MANAGER IMMEDIATELY.
SYMBOL
CD
LEGEND
DESCRIPTION
EXISTING WORK TO REMAIN
REMOVE EXISTING WORK
PROVIDE NEW WORK
DEMOLITION POINT OF BEGINNING
NEW WORK TO EXISTING WORK POINT OF CONNECTION
ETR EXISTING WORK TO REMAIN
RE
PN
CT
REMOVE EXISTING WORK
PROVIDE NEW
COOLING TOWER
TCT TEMPORARY COOLING TOWER
CWP CONDENSER WATER PUMP
TCWP TEMPORARY CONDENSER WATER PUMP
VTR
cws
VENT THRU ROOF
CONDENSER WATER SUPPLY
CWR CONDENSER WATER RETURN
MCV
DP
MOTORIZED CONTROL VALVIE
DIFFERENTIAL PRESSURE GAUGE
I c
B
A
CONSULTANTS
U. S. COAST GUARD
CIVIL ENGINEERING UNIT
MIAMI
USCG. CEU MIAMI
15606 SW 117TH AVE
MIAMI, FLORIDA 33177
ISSUE
AG 09/21/12 FINAL DESIGN SUBMITTAL
MARK DATE DESCRIPTION
A/E PROJECT NO:
CAO FILE NAME:
DESIGNED BY: AG
"' t>J: 1'-V
EDITED BY: AG
CHECKED BY: TEW
SCALE: AS SHOWN PLOT SCALE: 1:1
SHEET TITLE
REPLACE COOLING TOWER IN BUILDING 102
SECTOR KEY WEST
KEY WEST
BUILDING 'I 02
MECHANICAL
NOTES & LEGEND
FL
PROJECT ENG. BRANCH CHIEF '"-'or • • ; 1 OR
PROJECT NUMBER DRAWING NUMBER
2892084 IV11923-D
DISCIPUNE/SHT NO
M-01 SHEET 2 OF 9
LPMcCue
A
1 I
0 ~
(3) \!\
®\ G (4)
(9 0 0 0 l0
MECH
ROOM
LOWER
ROOF
@7
J
VTR
0 0
~-c• =. J
1)(1 ,_, a /
CM:M:::i cW:W:::i
[ - J -
[ =-P
[ =·b
~---------------------++-~EXHAUST FAN@)
jol
'VTR
• 1 J2" VT
EXHAUST FAN @ 0 4" VTR
• 2" VTR
..L lr.::t:==:::=::tl/
1 I
UPPER
ROOF
w a. s Ul
LL
a::
w
a. s Ul
LL
Cl'.:
TEMPORARY SERVICE PLAN
SCALE: 1/8"=1 '-Q"
I 3 I
© . . . (71
. Gv TCWP-1>
®,D ~ "' TCT-1 Gv 0 TCWP-2 0
- p
LOWER
ROOF 0
• VTR
VTR
I )(t ,_, 0 'C, I)
@ EXHAUST FANS
0 ROOF c?LOPE
'VTR
I 3 I
KEYED N•OTES
0 ETR CONDENSER WATER GALLEY REFRIGERATION
EQUIPMENT.
@ ETR CT S1RUCTURAL SUPPORTS
0 EXISTING CT & PUMPS UNDERNEATH (NOT SHOWN
FOR CLARITY)
© EXISTING t." PVC CONDENSER WATER PIPING
®PROVIDE (2) NEW 4" PVC SCHEDULE 80 WYE
FITTINGS WITH (6) 4" STEEL BUTTERFLY VALVES
TO ALLOW CONDENSER WATER SOURCE TO C
SWITCH FROM PERMANENT TO TEMPORARY
COOLING iOWER WITHOUT DRAINING THE ENTIRE
WATER LOOP
©PROVIDE (2) TEMPORARY 4" FLEXIBLE
CONDENSER WATER HOSE APPROXIMATELY 100 FT
(FIELD VEHIFY DIAMETER AND LENGTH) LONG
EACH TO ":"EMPORARY COOLING TOWER AND
TEMPORARY CONDENSER WATER PUMP
0 PROVIDE TEMPORARY 80 TON COOLING TOWER
190 GPM, 460/3/60. SHP
©PROVIDE (2) TEMPORARY 190 GPM @ 70' HEAD,
460/3/60, 5 HP CONDENSER WATER PUMPS.
ONE PUMP TO OPERATE ONE PUMP ON 100%
STAND BY BACK-UP.
® PROVIDE TEMPORARY CONCRETE BARRIER TO
PROTECT TEMPORARY EQUIPMENT FROM
VEHICULAR TRAFFIC DAMAGE.
@ ETR CONCl~ETE BOLLARD (TYPICAL)
@ ETR CWS & CWR PVC PIPE TO CHILLER
CONSULTANTS
U. S. COAST GUARD
CIVIL ENGINEERING UNIT
MIAMI
USCG. CEU MIAMI
15608 SW 117TH AVE
MIAMI, FLORIDA 33177
ISSUE
AG 09/21/12 ANAL DES!GN SUBMITTAL
MARK DATE DESCRIPTION
AIE PROJECT NO:
CAD ALE NAME:
DESIGNED BY: AG
DJ: Ar.;
EDITED BY: AG
CHECKED BY: TEW
SCALE: N3 SHOWN PLOT SC:Al.E: 1 :1
Snc."-• 11 i LE
REPLACE COOLING TOWER IN BUILDING 102
SECTOR KEY WEST
KEY WEST Fl
BUILDING 102
A MECHANICAL
TEMPORARY SERVICE PLAN
REVIEWED BY: R ~ ,JJ~r) REVIEWED BY:
11 14. J{ , I :.4",.4,_. ~
. PROJECr tNG. :RANCH CHIEF '""""· ul
~- q-v-1~
~- DATE
PROJECT NUMBER DRAWING NUMBER
2892084 tv11923-D DISCIPUNt.J'SHT NO
4 M-02 SHEET 3 OF >9
LPMcCue
B
A
1 I
MECH
ROOM
LOWER
ROOF
VTR
~---------------------+!~ EXHAUST FAN@
_r~n
. 1 )2'' VT
EXHAUST FAN @ 0 4" VTR
· 2" VTR
J_ lr.:t=====:J::;ll ;
1 I
UPPER
ROOF
w 0..
g Cf)
LL
0::
w 0.. g Cf)
LL
0::
ROOF PLAN
SCALE: 1/8"=1'-Q"
- -[_p [_]
[ " - • J c - •
'VTR
I
'VfR
I
LOWER
ROOF vTR
VfR
@ EXHAUST FANS
ROOF aLOPE
3 I
3 I
KEYED N!OTES
G) RE 4" CONDENSER WATER PIPING FROM THIS
POINT TO THE EXISTING CT.
® ETR CT STRUCTURAL SUPPORTS
0 RE CT AND ASSOCIATED ACCESSORIES,
DISCONNECT AND CAP WATER MAKE-UP LINE AND
DRAIN LINE: AT GROUND LEVEL FOR FUTURE NEW
CT-1 RECONNECTION. RE CONDENSER WATER
PUMPS UNDERNEATH EXISTING CT (NOT SHOWN
FOR CLARrfY) AND ASSOCIATED PIPING, ACCESSORIES AND CONTROLS. ETR CWP
CONCRETE PADS UNDERNEATH EXISTING CT. c
©RE 4" PVC CONDENSER WATER PIPING
® ETR CONCl~ETE BOLLARD (TYPICAL)
B
A
CONSULTANTS
U. S. COAST GUARD
CIVIL ENGINEERING UNIT
MIAMI
USCG. CEU MIAMI
15608 SW 117TH AVE
MIAMI, FLORIDA 33177
ISSUE
AG 09121/12 FINAL DESIGN SUBMITTAL
MARK DATE DESCRIPTION
A/E PROJECT NO:
CAD FILE NAME:
DESIGNED BY: AG
EDITED BY: -
CHECKED BY: TEW
SCALE: AS SHOWN PLOT SCALE: 1:1
SHEET TITLE
REPLACE COOLING TOWER IN BUILDING 102
SECTOR KEY WEST
KEY WEST
BUILDING 102
MECHANICAL
DEMOLITION PLAN
FL
REVIEWED BY: ~; REY!EWED BY:
A... J_d. I.I , • Vf ~ ffe~ e-;n ~
!IVF .,,,._, ~
PROJECT ENG. BRANCH CHIEf 1c...,H. ul.,.c.CTOR
I~~~·~ cr~2t~ APPRViNGC>FFfC DATE
PRwt.CT NUMB= uRAWING NUMBER
2892084 M1923-D DISCIPUNr1SHT NO •
M-03 SHEET 4 OF '.9
LPMcCue l I ' 1 '
I ' I 'c i
B
A
I 2 I 3 I
5 t..WL...
·~-:------------ ·-·--:._., .• 1-l.J ·~ !:' ___________ ©_ _____________________________________ ,
• . ----------- ------•·• I I '" ------------------------------------------: r--+--CZ< ff1I (3)
(4) G
CT-1
0 0
MECH
ROOM
LOWER
ROOF
I-
- -[,_ = 0 1,. - )
I = IJ
LOWER
ROOF
VTR
@EXHAUST FANS
TCWP-1: I : I 111<:£)
{.;\Gt-1 ·'· . I ~ \VD-{}- J TCT-1 I lift~ TCWP-2 - L _____ .J nu<~ .
e==a e--a e==~
VTR
KEYED NOTES
0 ETR CONDENSER WATER GALLEY REFRIGERATION
EQUIPMENT. ·
® ETR COOLING TOWER STRUCTURAL SUPPORTS
0 PN COOU'IG TOWER CT-1 (SEE SHEET M-05
·FOR ADDfflONAL REQUIREMENTS) INCLUDING
WATER DF:AIN AND MAKE-UP WATER CONNECTIONS
TO NEW TOWER. PN CONDENSER WATER PUMPS
CWP-1 & CWP-2 UNDERNEATH TOWER (NOT
SHOWN FOR CLARITY). CWP-1 & CWP-2 PIPING
SHALL MATCH PROVIDED PUMPS INLET AND
OUTLET FcANGED CONNECTIONS SIZES.
© PN 4" PVC CONDENSER WATER PIPING
© REMOVE TEMPORARY 4" FLEXIBLE CONDENSER
WATER HOSES TO THIS POINT.
c
©REMOVE (2) TEMPORARY 4" FLEXIBLE CONDENSER
WATER HOSE APPROXIMATELY 100 FT LONG EACH
TO TEMPORARY COOLING TOWER AND TEMPORARY
CONDENS~R WATER PUMP
(j) REMOVE 'fEMPORARY 80 TON COOLING TOWER
190 GPM, 460/3/60. 5HP
©REMOVE (2) TEMPORARY 190 .GPM @ 70' HEAD.
460/3/61'.), 5 HP CONDENSER WATER PUMPS.
ONE PUMP TO OPERATE ONE PUMP ON 100% -
STAND B" BACK-UP.
© REMOVE TEMPORARY CONCRETE BARRIER TO
PROTECT TEMPORARY EQUIPMENT FROM
VEHICULAR TRAFFIC DAMAGE.
@ ETR CONCRETE BOLLARD (TYPICAL)
.ri-..-..~------~--~----~----~-----· VTR 0 0 ROOF aLOPE
WORK OPTION #3---1
@PN. 24"x<!4"x4" FIBERGLASS 1" THICK R/A
PLENUM WITH 24x4 FIBERGLASS DUCT 1" THICK, 12" LONG FOR SOUND ATTENUATION.
r-----------------------1.1..- EXHAUST FAN@)
_rh
• 1 )2" VI
EXHAUST FAN@
0 4" VTR
• 2" VTR
INTERIOR WORK
GROUND FLOOR
; I
WORK OPTION #3
1 I
UPPER
ROOF
w a.. s w a.. g
LL.
NEW WORK PLAN
SCALE: 1/8"=1'-0"
'VTR 'VTR
B
A
4 I 3 I .
CONSULTANTS
i------------~-L---
U. S. COAST GUARD
CIVIL ENGINEEl~ING UNIT
MIAMI
USCG. CEU MIAMI
15608. SW 117TH AVE
MIAMI, FLORIDA 33177
AG. 09121112 ANAL DESIGN SUBMITTAL
MARK DATE DESCRIPTION
A/E PROJECT NO:
CAD FILE l\IAUE:
-=EO BY: AG
51: Al-i, EDITED BY: A!J
CHECKED BY: TEW
SCALE: AS SHOWN PLOT SCALE: 1:1
SHEEr TITLE
REPLACE COOLING ·TOWER IN BUILDING 102
SECTOR KEY WEST
KEY WEST FL
BUILDING 102
MECHANICAL
NEW WORK PLAN
PROJECT '" ~G. BRANCH CtUEf " GH, OR d2dft{tl 't!:Sel'/2
APPROVING OFFICER -- DATE
·PROJECT NUMBER DRAWING NUMBER
2892084 M1923-D
· DISClPUNEJSHT NO
M~Q4 SHEET 5 OF 9
LPMcCue
B
: 4'. ~·
A-..: .. ·"· . . ..~
. • .6 ••
PUMP SCHEDULE
DESIGNATION CWP-1 CWP-2
SERVICE CONDENSER CONDENSER
FLOW RATE (GPM) 190 190
TOTAL DYNAMIC HEAD (FT) 60 60
RPM 1750 1750
EFFICIENCY (%) 72 72
MAXIMUM BRAKEHORSEPOWER 4 4
MOTOR HORSEPOWER 5 5
ELECTRICAL (V /PH/HZ) 480/3/60 480/3/60
TYPE END SUCTION END SUCTION
COOLING TOWER SCHEDULE
DESIGNATION CT-1
TYPE CROSS FLOW
. NUMBER OF CELLS 1
WATER DATA
FLOW RATE (GPM) . 190
MAXIMUM PRESSURE DROP (FT) 15
ENTERING WATER TEMPERATURE (F) 95
LEAVING WATER TEMPERATURE (F) 85
AMBIENT AIR WET .BULB TEMPERATURE 81
FAN DATA
AIR FLOW RATE (CFM) 20000
MOTOR HORSEPOWER 5.0
ELECTRICAL DATA 480/3/60
DRIVE TYPE V-BELT
CASING CONSTRUCTION STAINLESS STEEL
MCV-2
CT-1
4" cws
PN (4) TYPE 4
RESTRAINED SPRING-..,.."\li:&
ISOLATOR MIN .5"
4" cws
3" cws .
3" cws
,..........., DEFLECTION
ETR CT SUPPORTS
1. :.. ' •
.. t ·. • • •
. :·.· . . · CWP-1
SUCTIO .... · .
ETR CWP CONCRETE PAD
TCWP-1 TCWP-2
CORPORATION STOP AND --...
NOZZLE
3 4
~ CONNECTION AFTER CHILLER
TEMP CONDENSER TEMP CONDENSER ~SLOWDOWN SOLENOD VALVE
480/3/60
END .SUCTION
TCT-1
CROSS FLOW
20000
5.0
480/3/60
ANY
ANY
CT-1
MCV-1
4" CWR TO COOLING TOWER ~
SCHEDULE 80 CPVC PIPING _.,.--
!fOI---------- /_ '.~.:~~l ~~".:'.'--(ffl~----1 - 4" CWS FROM COOLING TOWER
- CONNECTION BEFORE TAKEOFF TO
CONDENSING UNITS
,, INJECTION MANIFOLD l 1 I
'-!-~~-:-~~~--1 I ___.-- 3 I 4"
- 3/4"
480/3/60
TO NEAREST FLOOR DRAIN ---.
I I r------+~~"'--- SCHEDULE 80 PVC PIPING c
END SUCTION
r--~---------- ------ ,,,,,. ___ _ : 115/1/60 ~
CHEMICAL PUMP (TYP.) --------~'~...._
tA.--- ISOLATION VALVE (TYP.)
I I I
I I I
- 3/4"
SHELF ADJACENT TO CONTROL ----------=---~7--f;- CHEMICAL TREATMENT _/
CONTROL PANEL ' '
-...._..._ 1 /2" SAMPLE Wi\STE TO NEAREST
FLOOR DRAIN
4" cws
PANEL AND ABOVE CHEMICAL
TANKS
CHEMICAL SHIPPING ---------1
CONTAINER ((lTY~P~.~) -----------1
BIOCIDE #1 ~
MCV-2
PN (4) 1/2" STAINLESS
STEEL CONCRETE WEDGE
,..,........., ANCHOR. {2) 4" AWAY
... · ... .I'-·;- FROM EDGE, (2) EQUALLY
DISTANCED. EACH SUPPORT
WITH MIN 4 3/4"
EMBEDMENT IN CONCRETE.
6"
ALUMINUM
6060-T6
BEAM
ETR DOC
CONTROLLER
CT-1
-...___ CORROSION AND SCALE
INHIBITOR
L _____ --s TO 3/4" WATER METER
(REFER TO DETAIL BELOW
FOR CONTINUATION
NEW CONDENSER WATER SYSTEM
CHEMICAL TREATMENT SYSTEM SCHEMATIC (REPLACE EXISTING)
SCALE: N.T.S.
MCV-1
'---WOR:K C)PTION # l
CWR TO
EXISTING
CHILLER ~:;-1
ELECTRICAL CONNECTION
TO CHEMICAL TREATMENT
CONTROL PANEL. REFER
TO SCHEMATIC ABOVE
FOR CONTINUATION
B
~----- UNION (TYP.)
_,r-- PRESSURE VALVE SET: 75 PSIG
/ . SAFEWASTE OVER FLOORDRAIN .
r PRESSURE GAUGE r PRESSURE REDUCING VALVE SET:
30 PSIG
ISOLATION VALVE (TYP.)
CWP-1 2
MCV-2
CWS TO
EXISTING
CHILLER j:;-1 1---T- 3/4" 3/4"
N.C .
'+-~:r-----tl~:....--1-1
QUICK FILL BYPASS "'--- 3/4" WATER METER
3/4" MAKEUP WATER TO COOLING
,· .. ·. . ' .. .,,, 2 1/2" cws 4 3/4" MIN.
. ·:.. .. .. ,.' '"': . TOWER
A
; . ·-4 rL-~-h---,--,----b--~J..,..J . _,{' .
• ., • 4.
"'<--!-->-'--' '7-' •• ~ '• • : • •
~~ 3::M·I~ l~"M;N,(
CONDENSER WATER SYSTEM SCHEMATIC
SCALE: · N.T.S.
NEW MAKE-UP WATEI~ ASSEMBLY DETAIL
(REPLACE EXISTING)
SCALE: N.T.S.
COOLING TOWER MOUNTING DETAIL -WORK OPTION #2
SCALE: N.T.S.
1 2 3 4
CONSULTANTS
U. S. COAST GUARD
CIVIL ENGINEERING UNIT
MIAMI
USCG. CEU MIAMI
15608 SW 117ll.I AVE
MIAMI, FLORIDA 33177
ISSUE
AG 09 21 12 FINA!. DESIGN SUBMITTAL
MARK DATE DESCRIPTION
E PROJECT NO:
CAD FILE NAME: M1932M05.DWG
DESIGNED BY: AG
SCALE: AS SHOWN PLOT SCALE:--· -1:1----i
SHE
REPLACE COOLING TOWER IN BUILDING 102
SECTOR KEY WEST
KEY WEST FL
BUILDING 102
MECHANICAL
SCHEDULES & DETAILS
Rf.\llEWEO BY: R
'/.l5st/>t'2.
DATE
i_;P~ROJ=E:::.CT:...:.::.:N ::.::M::::B:::.ER:.._-'-__ :::,:DM.:..: NUMBER
2892084 Ml923-D
SHEET 6 Or 9
LPMcCue
B
A
I 2
PROVIDE TEMPORARY 4" X 4" X 2-1/2"
NEMA 3R J. BOX. REUSE EXISTING COOLING
TOWER AND CONDENSED PUMP BRANCH
CIRCUITS.
PROVIDE TEMPORARY 4" X 4" X 2-1/2"
NEMA 3R J. BOX. FOR CONTROL CABLING---.._~
I 2
MECH
ROOM
LOWER
ROOF
I
PROVIDE TEMPORARY (1) 3/4" PVC SCH
40 CONDUIT SURFACE MOUNTED ON WALL
FOR CONTROL CABLING.
I I,,} I I I I I
UPPER
ROOF
TEMPORARY ELECTRICAL PLAN
SCALE: 1/8"=1 '-0"
I
PROVIDE TEMPORARY (2) 3/ 4" PVC SCH
40 CONDUIT SURFACE MOUNTED ON WALL
WITH 3#10 & 1#10G CONDUCTORS.
I r- PROVIDE TEMPORARY 3P-20A, 480V
COMBINATION NONO-FUSED/DISCONNECT
SWITCH AND MAGNETIC MOTOR STARTER IN
NEMA 3R ENCLOSURE.
ol ~i TCWP-1
D-8 D-8
TCWP-2
I
TCT-1
c
CONSULTANTS
U. S. COAST GUARD
CIVIL ENGINEERING UNIT
MIAMI
USCG. CEU MIAMI
15608 SW 117TH AVE
MIAMI, FLORIDA 33177
ISSUE
RL 09/21/12 FINAL DESIGN SUBMITTAL
MARK DATE DESCRIPTION
AIE PROJECT NO:
CAD FILE NAME:
DESIGNED BY: RL
Dl ! t<L
ED111:.0 OT: RL
CHECKED BY: OT
SCALE: AS SHOWN PLOT SCALE: 1:1
~·· 1111£
REPLACE COOLING TOWER IN BUILDING 102
SECTOR KEY WEST
KEY WEST FL
BUILDING ·102
A ELECTRICAL
TEMPORARY ELECTRICAL PLAN
Ra!;;~: ~~2(Ji~lBY:
PR1 "'"-CT ENG. BRANCH CHIEF 11:.1..H. • 'n •R v--~Ly~~ <[-'£/- J'Z- APPROVING OFFlCER DATE p..nlECT NUMBER DRAWING NUMBER
2892084 M1923-D ui:>UPUNEtSHT NO
E-01 SHEET 7 OF 9
LPMcCue
B
A
REMOVE EXIST. HAND/OFF /AUTO
STARTER DISCONNECT. PRESERVE
EXISTING 1/2" CONDUIT AND
I
CABLES FROM SOURCE PANEL ----...
0 "'------.C
REMOVE ALL ELECTRICAL -----;;---r- ., ___ _
EQUIPMENT UNDERNEATH 0
=i- _ _ _ _ - -::.
0 (/ 0 0 0 0 0 0 0 0 0
REMOVE EXISTING (5) PVC '//
ELECTRICAL CONDUIT BACK TO
BUILDING WALL.
I
MECH
ROOM
LOWER
ROOF
UPPER
ROOF
ELECTRICAL DEMO PLAN
SCALE: 1/8"=1'-o"
I 3
I 3
I 4
~GENERAL DEMOLITION NOTE:S
1. VISIT AND CAREFULLY EXAMINE THOSE PORTIONS OF THE EXl~>TING BUILDING AND
SITE INCLUDED IN THE PROJECT SCOPE. BECOME FAMILIAR WITH EXISTING CONDITIONS,
DIFFICULTIES AND PHASING REQUIREMENTS.
2. ALL EXISTING DEVICES AND EQUIPMENT NOT SHOWN, AND IN A.REAS OUTSIDE OF
THE PROJECT PHASE LIMITS OF CONSTRUCTION SHALL REMAl~i ACTIVE. INSTALL NECESSARY ITEMS AS REQUIRED TO MAINTAIN THE CONTINUl1Y OF EXISTING DEVICES AND EQUIPMENT TI-lAT REMAIN.
3. OWNER HAS FIRST CHOICE OF REFUSAL FOR ANY AND ALL WORK INDICATED FOR
REMOVAL. /i,RRANGE FOR A WALK-THROUGH OF THE PROJECT SITE WITH THE OWNER
PRIOR TO THE COMMENCEMENT OF ANY OF THE DEMOLITION 'NORK TO DCTERMINE
WHAT EXISTING WORK INDICATED FOR REMOVAL IS ACCEPTED BY THE OWNER.
4. ALL EXISTING WORK INDICATED FOR REMOVAL BUT REFUSED BY THE OWNER SHALL
BECOME THE PROPERTY OF THE CONTRACTOR. DISPOSE THIS WORK OFF-SITE, IN A
LAWFUL MANNER.
5. OBSERVE ALL OF THE ACCEPTED WORK WITH THE OWNER BEF'ORE COMMENCING
DISMANTLING PROCEDURES AND NOTE THEIR CONDITION. ANY OAMAGE SUSTAINED BY
THE ACCEPTED WORK FROM THE COMMENCEMENT OF THE DISMANTLING PROCEDURE
TO ITS PLACEMENT IN STORAGE SHALL BE THE RESPONSIBILITY OF THIS
CONTRACTOI~. EITHER REPAIR THE DAMAGE TO THE OBSERVED CONDITION PRIOR TO
ITS DISMANTLING TO THE SATISFACTION OF THE OWNER OR REPLACE THE ACCEPTED
WORK WITH NEW AS DIRECTED BY THE OWNER.
6. RESTORE ALL EXISTING TO REMAIN WORK DAMAGED DUE TO THE PROGRESS OF
CONSTRUCTION TO ITS INITIAL CONDITION AT NO ADDITIONAL COST TO THE OWNER.
7. CEASE ALL WORK IF ASBESTOS IS DISCOVERED AT ANY TIME )URING THE PROGRESS
OF THE DEMOLITION WORK. NOTIFY THE PROJECT MANAGER IMMEDIATELY.
I 4 c
B
A
CONSULTANTS
U. S. COAST GUARD
CIVIL ENGINEERING UNIT
MIAMI
~@~ST Iii/
;;;, .,..... d
\l~S'
USCG. CEU MIAMI
15608 SW 117TH AVE
MIAMI, FLORIDA 33177
ISSUE
RL 09/21/12 ANAL DESIGN SUBMITTAL
MARK DATE DESCRIPTION
A/E PROJECT NO:
CAO ALE NAME:
DESIGNED BY: RL
1:11: "'-
EDITED BY: RL
CHECKED BY: OT
SCALE: AS SHOWN PLOT SCALE: 1 :1
SHEE.T TITLE
REPlACE COOLING TOWER IN BUILDING 102
SECTOR KEY WEST
KEY WEST FL
BUILDING 102
ELECTRICAL
DEMOLITION PLAN
REVI.· ii8 t1,v. ~ ~: REYJEWED BY: /v-: cw /(),~ <1-n ri i 1 1 ;_;-.?......, (_, - r.~
Prc•JJECT ENG. BRANCH CHIEF 11:.Cn. uh<"-'"'Otc
,----~{,~~ Cf-Z,t ~ /'/_ APPROVING OFflCER DATE
PROJECT NUMBER DRAWlNG NUMBER
2892084 M1923-D
OISCIPUNE/SHT NO
E-02 sHm a or 9
LPMcCue
A
PROVIDE 3P-20A, 480V HAND/OFF /AUTO
COMBINATION NON-FUSED/DISCONNECT
SWITCH AND MAGNETIC MOTOR STARTER IN
NEMA 4X SS ENCLOSURE. REUSE EXISTING
COOLING TOWER AND CONDENSED PUMP
BRANCH CIRCUITS (SEE NOTE BELOW)
NEW
COOLING
TOWER
T
,Y
ALL ELECTRICAL CONDUITS SHALL BE 1 /2" GRS
PVC COATED CONDUIT
NOTE:
ALL STARTER ARE 3 POLE, FULL VOLTAGE, NON REVERSING
COMBINATION STARTER WITH NON-FUSED DISCONNECT SWITCH.
PROVIDE EACH WITH 120V CONTROL CIRCUIT TRANSFORMER
WITH 2 PRIMARY FUSES AND ONE SECONDARY FUSE. ALL
UNITS TO BE EQUIPPED WITH HEAVY-DUTY OIL TIGHT
"HAND/OFF /AUTO" SELECTOR SWITCH, TRANSFORMER TYPE
RED , RUN PILOT LIGHT AND TWO CONVERTIBLE AUXILIARY
CONTACTS. PROVIDE STAINLESS STEEL ENCLOSURE.
I 1,,,1 I I I I I
MECH
ROOM
LOWER
ROOF
Lr_11
UPPER
ROOF
NEW ELECTRICAL PLAN
SCALE: 1/8"=1'-0"
I
I
GENERAL NOTES
1. REMOVE ALL TEMPORARY ELECTRICAL CONDUITS AND
DISCONNECT SWITCH SHOWN ON SHE ET E-1.
2. ALL CONTROL WIRING AND EQUIPME~JTS SHALL BE
INSTALLED BY ELECTRICAL CONTRACT>)R AND CONNECTED
BY MECHANICAL CONTRACTOR.
ABBREVIATION
AFF - ABOVE RNISHED FLOOR
C - CONDUIT
CKT - CIRCUIT
G - GROUND
GRS - GALVANIZED RIGID STEEL
PVC - POLY-VINYL CHLORIDE
WP - WEATHER-PROOF
c
B
A
CONSULTANTS
U. S. COAST GUARD
CIVIL ENGINEERING UNIT
MIAMI
USCG. CEU MIAMI
15608 SW 117TH AVE
MIAMI, FLORIDA 33177
ISSUE
RL 09/21/12 FINAL DESIGN SUBMITTAL
MARK DATE DESCRIPTION
A/E PROJECT NO:
CAD FILE NAME:
DESIGNED BY: RL
- 01: "'"
EDITED BY: l'IL
CHECKED BY: DT
SCALE: AS SHOWN PLOT SCALE: 1:1
SnEr• ,,,_I!
REPLACE COOLING TOWER IN BUILD! NG 102
SECTOR KEY WEST
KEY WEST
BUILDING 102
ELECTRICAL
NEW ELECTRICAL PLAN
FL
PROJECT NUMBER DRAWING NUMBER
2892084 M1923-D
1---=D='"' LINE,SHT NO
E-03 SHffi 9 OF 9
LPMcCue
LPMcCue
Enclosure (2)
| 28920894-FINAL DRAWINGS.pdf |
| M1923G01 |
| M1923M01 |
| M1923M02 |
| M1923M03 |
| M1923M04 |
| M1923M05 |
| M1923E01 |
| M1923E02 |
| M1923E03 |
File details come from the government source that posted it. Updated .