SCOPE OF SERVICES

FOR

CLOSED LOOP COOLING TOWER WATER TREATMENT SERVICE

PROJECT #20190508

AT

U.S. COAST GUARD SECTOR KEY WEST

100 TRUMBO ROAD

KEY WEST, FL 33040

Feb 2020

US Coast Guard Sector Key West Project #20190508 Closed Loop Cooling Tower Water Treatment Service

TABLE OF CONTENTS TOC-1 / 1

TABLE OF CONTENTS

DIVISION 1 - GENERAL REQUIREMENTS

011000 SUMMARY OF WORK

ENCLOSURES

1. BUILDING 102 MECHANICAL DRAWINGS

2. UEPH MECHANICAL DRAWINGS

END OF CONTENTS

SUMMARY 011000 - 1 / 4

SECTION 011000 - SUMMARY

PART 1 - GENERAL

1.1 SUMMARY

1.2 PROJECT INFORMATION

A. Project Identification: Closed Loop Tower Water Treatment Service - Project #:

20190508

1. Project Location: 100 Trumbo Road – Key West, FL 33040.

1.3 PRE-BID SITE VISIT

A. Contractors are permitted and encouraged to visit the site prior to submitting bids. Site visits will be held on a case by case basis. To arrange for a site visit please contact a Sector Key West Engineering Staff Member. Contact information is as follows:

1. Name: LT Liam McCue

Engineering Officer Email: Liam.P.McCue@uscg.mil Phone: (305) 292-8756 Mobile: (305) 797-2086

2. Name: MKC Daniel Payne Email: Daniel.A.Payne@uscg.mil Phone: (305) 292-8830

1.4 WORK COVERED BY CONTRACT DOCUMENTS

A. The work of project is defined by the contract documents and consists of the following:

1. In general, Coast Guard Sector Key West intends to establish a term contract for furnishing water treatment chemicals and equipment to maintain a closed loop cooling tower water treatment program.

2. The Coast Guard’s goal is to keep the cooling towers free of insulating deposits such as scale, corrosion, biological growths and sludge that promote high energy consumption and equipment failure. This contract is inclusive of all aspects, materials, labor and equipment necessary to prevent these deposits.

SUMMARY 011000 - 2 / 4

1.5 CONTRACTOR QUALIFICATIONS

A. The contractor shall be in compliance with any applicable federal, state, local, ANSI, and OSHA laws, rules and regulations.

B. The contractor shall have been conducting business for a MINIMUM of five (5) years treating industrial, commercial, or institutional cooling systems. The contracted firm shall have a verifiable record of servicing Florida customers who have chilled water systems similar to the Coast Guards.

1.6 WORK SEQUENCE

A. The work shall be conducted by the contractor to provide the least possible interference to the activities of government personnel.

1.7 WORK BY GOVERNMENT

A. General: Cooperate fully with Government so work may be carried out smoothly, without interfering with or delaying work under this contract or work by Government.

Coordinate the work of this contract with work performed by Government.

1.8 ACCESS TO SITE

A. General: During the construction period, the contractor shall have limited use of project site for construction operations as indicated on drawings, as indicated by requirements of this Section, and as specified by the Contracting Officer.

1. Material storage and work areas shall be as designated by the Contracting Officer’s Representative (COR).

1.9 WORK RESTRICTIONS

A. Work Restrictions, General: Comply with restrictions on construction operations.

1. Comply with limitations on use of public streets and with other requirements of authorities having jurisdiction.

B. On-Site Work Hours: Limit work in the existing building to normal business working hours of 8:00 a.m. to 4:00 p.m., Monday through Friday, unless otherwise indicated.

1. Submit request to the COR at least 72 hours in advance for permission to work outside the normal working hours or on Saturdays, Sundays, or federal holidays.

2. Submit request to the COR at least 72 hours in advance of proposed utility interruptions.

SUMMARY 011000 - 3 / 4

1.10 SITE MAINTENANCE

A. The contractor shall perform daily cleanup of work site. All trash and debris from maintenance shall be removed daily when the contractor is finished. Debris shall not remain overnight on Coast Guard property.

1.11 SCOPE OF WORK FOR COOLING TOWERS

A. Contractor shall develop a comprehensive chemical treatment program for the cooling towers based on location and anticipated risk to the cooling towers. Contractor shall provide and install all necessary chemical feed equipment on each tower. Contractor shall also provide necessary treatment chemicals.

B. Monthly, a contractor’s service representative shall test all onsite equipment to ensure equipment is operating properly and make any necessary repairs or equipment replacement. Contractor shall replace defective water treatment equipment at contractors cost. Service representative shall also check chemical storage levels to ensure treatment chemicals are sufficiently stocked. Failure to keep chemicals properly supplied after notice, may be cause for termination of the contract.

C. Contractor is responsible for the delivery, offload, and fill all chemical drums.

Chemicals shall be administered as an uninterrupted supply.

D. Monthly, the contractor shall also collect and analyze samples of treated water. Tests shall include but are not limited to: pH, conductivity, total alkalinity, calcium hardness, and appropriate scale and corrosion agents. Contractor shall test other necessary parameters as deemed appropriate for the Florida Key’s climate and geolocation.

E. Prior to each site visit, the contractor shall notify Coast Guard Sector Key West Engineering’s Mechanical Chief of their intended visit date for that month.

F. During each site visit, the service representative shall notify Coast Guard Sector Engineering Mechanical Chief of their arrival and review findings of the site visit.

Contractor shall provide a service report electronically to Coast Guard Sector Key West Engineering summarizing the visit, providing test results of the prior samples, and a statement of all parameters.

G. Contractor shall properly remove and dispose of all chemical containers properly from site upon depletion.

1.12 CHEMICAL DELIVERY

A. Chemical delivery shall be coordinated with the contracting officer’s representative and only delivered to the site as needed. Bulk extra chemicals shall not be stored onsite.

Contractor shall be responsible for the handling of all chemicals including unloading from delivery vehicles. Coast Guard employees shall not handle chemicals.

SUMMARY 011000 - 4 / 4

B. Contractor shall provide Material Safety Data cut sheets for every chemical used in treatment. Provide this submittal to the contracting officer’s representative prior to bringing chemicals onsite.

1.13 COOLING TOWER INFORMATION & SITE LOCATIONS

Site Location Cooling Tower Information Building 102 - Galley/Medical EVAPCO USS 14-89

UEPH - Barracks Marley Aquatower SPX

1.14 CONTRACT STRUCTURE

A. This contract shall be setup for a base year and four option years that the Coast Guard may choose to renew. Each contract year shall actually be for the Fiscal Year (i.e. FY 2020 starts 01 October of 2019 and runs to the end of September 2020. Contractor shall provide a proposal with Cost for servicing the two cooling towers in the following structure:

Contract Fiscal Year

Cooling Towers

Building 102 UEPH/Barracks Total Annual Price

Base Year (FY 2020)

Option Year 1 (FY 2021)

Option Year 2 (FY 2022)

Option Year 3 (FY 2023)

Option Year 4 (FY 2024)

END OF SECTION 011000

C:

B

A

L 3

KEY WEST

TOWER BUILDING

U®S®C®G® SECTOR

REPLACE COOLING

KEY WEST~

r;

L

FLORIDA

"----" AREA OF WORK

SITE PLAN ® ---·N

SCALE: NOT TO SCALE

USCG SECTOH KEY WEST I

VICINITY MAP ®

·-------4 N

SCALE: NOT TO SCALE

DRAWING INl)EX

SHT NO I DISCIPLINE

· · SHEET NO. I TITLE

GENERAL

1 G-01 COVER SHEET

MECHANICAL

2 M-01 NOTES & LEGEND

3 M-02 ' TEMPORARY SERVICE PLAN

4 M-03 DEMOLITION PLAN

5 M-04 NEW WORK PLAN

6 M-0$ SCHEDULES & DETAILS

ELECTRICAL

7 E-01 ' TEMPORARY ELECTRICAL PLAN

8 E-02 DEMOLITION PLAN

9 E-03 NEW ELECTRICAL PLAN

c

B

CONSULTANTS

U. S. COAST GUARD

CIVIL ENGINEERING UNIT

MIAMI

USCG. CEU MIAMI

15608 SW 117TH A.VE

MIAMI, FLORIDA 33177

ISSUE

A E PROJECT NO:

CAD FlLE NAME:

DESIGNED BY: AG

SCALE: AS SHOWN PLOT SCALE: 1:1

SHEET

I

REPLACE COOLING TOWER IN BLDG.

USCG SECTOR KEY WEST

KEY WEST

BUILDING 102

GENERAL

COVER SHEET

\c:~J .. -;x,•A~" l .. fEv...~ ~L~.~1,,\,·,,_;::._.~

APPROVING Of'ACER -

MBER [)

Fl I

DATE

2892084 M1923-D

DISCI NO

G-01 SHeET 1 OF 9

LPMcCue Typewritten Text Enclosure (1) c

A

I 2

GENERAL NEW WORK NOTES

1. PROVIDE ALL WORK AS INDICATED AND NOTED ON THE FLOOR PLANS, SCHEDULED ON THE

DRAWINGS AND AS DETAILED ON THE DRAWINGS HEREIN.

2. ALL SQUARE DIFFUSERS ARE 4 WAY THROW UNLESS NOTED OTHERWISE.

3. FIELD VERIFY ALL ASPECTS OF THE EXISTING CONDITIONS RELATED TO THIS JOB PRIOR TO

COMMENCING THE WORK.

4. VISIT AND CAREFULLY EXAMINE THOSE PORTIONS OF THE EXISTING BUILDING AND SITE

INCLUDED IN THE PROJECT SCOPE SO AS TO BECOME FAMILIAR WITH EXISTING CONDITIONS,

DIFFICULTIES AND PHASING REQUIREMENTS THAT WILL AFFECT EXECUTION OF THE CONTRACT

WORK.

5. ALL EXISTING DEVICES AND EQUIPMENT NOT SHOWN, AND IN AREAS OUTSIDE OF THE

PROJECT PHASE LIMITS OF CONSTRUCTION SHALL REMAIN ACTIVE. INSTALL NECESSARY ITEMS

AS REQUIRED TO MAINTAIN THE CONTINUITY TO EXISTING DEVICES AND EQUIPMENT THAT

REMAIN.

6. PERFORM WORK IN STRICT COMPLIANCE WITH THE ESTABLISHED WORK SCHEDULE BEING SET

FORTH BY THE GOVERNMENT. FURNISH ADEQUATE WORK FORCES, CONSTRUCTION SUPERVISION

AND EQUIPMENT, AND WORK SUCH HOURS, INCLUDING NIGHT SHIFTS AND OVERTIME OPERATIONS

IN ACCORDANCE WITH THE GOVERNMENT'S OPERATIONAL SCHEDULE. VERIFY AND COORDINATE.

7. PLANS AND SCHEMATICS ARE DIAGRAMMATIC ONLY AND SHOULD NOT BE SCALED. COORDINATE

HVAC WORK WITH ALL PLUMBING, FIRE PROTECTION, HVAC AND ELECTRICAL WORK AT THE

SO AS NOT TO CONFLICT IN LOCATION WITH OTHER WORK PERFORMED UNDER THIS

CONSTRUCTION CONTRACT.

8. BRING ANY CONFLICTS TO THE ATTENTION OF THE COR PRIOR TO THE INSTALLATION OF THE WORK. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE OF THE KO IN SITE

WRITING VIA AN RFI.

I 2

I

I

3 I

GENERAL DEMOLITION NOTES

1. VISIT AND CAREFULLY EXAMINE THOSE PORTIONS OF THE EXISTING BUILDING AND

SITE INCLUDED IN THE PROJECT SCOPE. BECOME FAMILIAR WITH EXISTING CONDITIONS,

DIFFICULTIES AND PHASING REQUIREMENTS.

2. ALL EXISTING WORK INDICATED FOR REMOVAL SHALL BECOME THE PROPERTY OF THE

CONTRACTOR. DISPOSE THIS WORK OFF-SITE:, IN A LAWFUL MANNER.

3. RESTORE ALL EXISTING TO REMAIN WORK DAMAGED DUE TO THE PROGRESS OF

CONSTRUCTION TO ITS INITIAL CONDITION AT NO ADDITIONAL COST TO THE OWNER.

THIS INCLUDES, IBUT IS NOT LIMITED TO, PIPING, SUPPORTS, EQUIPMENT & CONTROLS.

4. PIPING REMOVAL SHALL INCLUDE, BUT IS NOT LIMITED TO, THE COMPLETE REMOVAL

OF RELATED INSULATION., FITTINGS, VALVES CONTROLS & SUPPORTS.

5. CEASE ALL WORK IF ASBESTOS IS DISCOVERED AT ANY TIME DURING THE PROGRESS

OF THE DEMOLITION WORK. NOTIFY THE PROJECT MANAGER IMMEDIATELY.

SYMBOL

CD

LEGEND

DESCRIPTION

EXISTING WORK TO REMAIN

REMOVE EXISTING WORK

PROVIDE NEW WORK

DEMOLITION POINT OF BEGINNING

NEW WORK TO EXISTING WORK POINT OF CONNECTION

ETR EXISTING WORK TO REMAIN

RE

PN

CT

REMOVE EXISTING WORK

PROVIDE NEW

COOLING TOWER

TCT TEMPORARY COOLING TOWER

CWP CONDENSER WATER PUMP

TCWP TEMPORARY CONDENSER WATER PUMP

VTR

cws

VENT THRU ROOF

CONDENSER WATER SUPPLY

CWR CONDENSER WATER RETURN

MCV

DP

MOTORIZED CONTROL VALVIE

DIFFERENTIAL PRESSURE GAUGE

I c

B

A

CONSULTANTS

U. S. COAST GUARD

CIVIL ENGINEERING UNIT

MIAMI

USCG. CEU MIAMI

15606 SW 117TH AVE

MIAMI, FLORIDA 33177

ISSUE

AG 09/21/12 FINAL DESIGN SUBMITTAL

MARK DATE DESCRIPTION

A/E PROJECT NO:

CAO FILE NAME:

DESIGNED BY: AG

"' t>J: 1'-V

EDITED BY: AG

CHECKED BY: TEW

SCALE: AS SHOWN PLOT SCALE: 1:1

SHEET TITLE

REPLACE COOLING TOWER IN BUILDING 102

SECTOR KEY WEST

KEY WEST

BUILDING 'I 02

MECHANICAL

NOTES & LEGEND

FL

PROJECT ENG. BRANCH CHIEF '"-'or • • ; 1 OR

PROJECT NUMBER DRAWING NUMBER

2892084 IV11923-D

DISCIPUNE/SHT NO

M-01 SHEET 2 OF 9

LPMcCue

A

1 I

0 ~

(3) \!\

®\ G (4)

(9 0 0 0 l0

MECH

ROOM

LOWER

ROOF

@7

J

VTR

0 0

~-c• =. J

1)(1 ,_, a /

CM:M:::i cW:W:::i

[ - J -

[ =-P

[ =·b

~---------------------++-~EXHAUST FAN@)

jol

'VTR

• 1 J2" VT

EXHAUST FAN @ 0 4" VTR

• 2" VTR

..L lr.::t:==:::=::tl/

1 I

UPPER

ROOF

w a. s Ul

LL

a::

w

a. s Ul

LL

Cl'.:

TEMPORARY SERVICE PLAN

SCALE: 1/8"=1 '-Q"

I 3 I

© . . . (71

. Gv TCWP-1>

®,D ~ "' TCT-1 Gv 0 TCWP-2 0

- p

LOWER

ROOF 0

• VTR

VTR

I )(t ,_, 0 'C, I)

@ EXHAUST FANS

0 ROOF c?LOPE

'VTR

I 3 I

KEYED N•OTES

0 ETR CONDENSER WATER GALLEY REFRIGERATION

EQUIPMENT.

@ ETR CT S1RUCTURAL SUPPORTS

0 EXISTING CT & PUMPS UNDERNEATH (NOT SHOWN

FOR CLARITY)

© EXISTING t." PVC CONDENSER WATER PIPING

®PROVIDE (2) NEW 4" PVC SCHEDULE 80 WYE

FITTINGS WITH (6) 4" STEEL BUTTERFLY VALVES

TO ALLOW CONDENSER WATER SOURCE TO C

SWITCH FROM PERMANENT TO TEMPORARY

COOLING iOWER WITHOUT DRAINING THE ENTIRE

WATER LOOP

©PROVIDE (2) TEMPORARY 4" FLEXIBLE

CONDENSER WATER HOSE APPROXIMATELY 100 FT

(FIELD VEHIFY DIAMETER AND LENGTH) LONG

EACH TO ":"EMPORARY COOLING TOWER AND

TEMPORARY CONDENSER WATER PUMP

0 PROVIDE TEMPORARY 80 TON COOLING TOWER

190 GPM, 460/3/60. SHP

©PROVIDE (2) TEMPORARY 190 GPM @ 70' HEAD,

460/3/60, 5 HP CONDENSER WATER PUMPS.

ONE PUMP TO OPERATE ONE PUMP ON 100%

STAND BY BACK-UP.

® PROVIDE TEMPORARY CONCRETE BARRIER TO

PROTECT TEMPORARY EQUIPMENT FROM

VEHICULAR TRAFFIC DAMAGE.

@ ETR CONCl~ETE BOLLARD (TYPICAL)

@ ETR CWS & CWR PVC PIPE TO CHILLER

CONSULTANTS

U. S. COAST GUARD

CIVIL ENGINEERING UNIT

MIAMI

USCG. CEU MIAMI

15608 SW 117TH AVE

MIAMI, FLORIDA 33177

ISSUE

AG 09/21/12 ANAL DES!GN SUBMITTAL

MARK DATE DESCRIPTION

AIE PROJECT NO:

CAD ALE NAME:

DESIGNED BY: AG

DJ: Ar.;

EDITED BY: AG

CHECKED BY: TEW

SCALE: N3 SHOWN PLOT SC:Al.E: 1 :1

Snc."-• 11 i LE

REPLACE COOLING TOWER IN BUILDING 102

SECTOR KEY WEST

KEY WEST Fl

BUILDING 102

A MECHANICAL

TEMPORARY SERVICE PLAN

REVIEWED BY: R ~ ,JJ~r) REVIEWED BY:

11 14. J{ , I :.4",.4,_. ~

. PROJECr tNG. :RANCH CHIEF '""""· ul

~- q-v-1~

~- DATE

PROJECT NUMBER DRAWING NUMBER

2892084 tv11923-D DISCIPUNt.J'SHT NO

4 M-02 SHEET 3 OF >9

LPMcCue

B

A

1 I

MECH

ROOM

LOWER

ROOF

VTR

~---------------------+!~ EXHAUST FAN@

_r~n

. 1 )2'' VT

EXHAUST FAN @ 0 4" VTR

· 2" VTR

J_ lr.:t=====:J::;ll ;

1 I

UPPER

ROOF

w 0..

g Cf)

LL

0::

w 0.. g Cf)

LL

0::

ROOF PLAN

SCALE: 1/8"=1'-Q"

- -[_p [_]

[ " - • J c - •

'VTR

I

'VfR

I

LOWER

ROOF vTR

VfR

@ EXHAUST FANS

ROOF aLOPE

3 I

3 I

KEYED N!OTES

G) RE 4" CONDENSER WATER PIPING FROM THIS

POINT TO THE EXISTING CT.

® ETR CT STRUCTURAL SUPPORTS

0 RE CT AND ASSOCIATED ACCESSORIES,

DISCONNECT AND CAP WATER MAKE-UP LINE AND

DRAIN LINE: AT GROUND LEVEL FOR FUTURE NEW

CT-1 RECONNECTION. RE CONDENSER WATER

PUMPS UNDERNEATH EXISTING CT (NOT SHOWN

FOR CLARrfY) AND ASSOCIATED PIPING, ACCESSORIES AND CONTROLS. ETR CWP

CONCRETE PADS UNDERNEATH EXISTING CT. c

©RE 4" PVC CONDENSER WATER PIPING

® ETR CONCl~ETE BOLLARD (TYPICAL)

B

A

CONSULTANTS

U. S. COAST GUARD

CIVIL ENGINEERING UNIT

MIAMI

USCG. CEU MIAMI

15608 SW 117TH AVE

MIAMI, FLORIDA 33177

ISSUE

AG 09121/12 FINAL DESIGN SUBMITTAL

MARK DATE DESCRIPTION

A/E PROJECT NO:

CAD FILE NAME:

DESIGNED BY: AG

EDITED BY: -

CHECKED BY: TEW

SCALE: AS SHOWN PLOT SCALE: 1:1

SHEET TITLE

REPLACE COOLING TOWER IN BUILDING 102

SECTOR KEY WEST

KEY WEST

BUILDING 102

MECHANICAL

DEMOLITION PLAN

FL

REVIEWED BY: ~; REY!EWED BY:

A... J_d. I.I , • Vf ~ ffe~ e-;n ~

!IVF .,,,._, ~

PROJECT ENG. BRANCH CHIEf 1c...,H. ul.,.c.CTOR

I~~~·~ cr~2t~ APPRViNGC>FFfC DATE

PRwt.CT NUMB= uRAWING NUMBER

2892084 M1923-D DISCIPUNr1SHT NO •

M-03 SHEET 4 OF '.9

LPMcCue l I ' 1 '

I ' I 'c i

B

A

I 2 I 3 I

5 t..WL...

·~-:------------ ·-·--:._., .• 1-l.J ·~ !:' ___________ ©_ _____________________________________ ,

• . ----------- ------•·• I I '" ------------------------------------------: r--+--CZ< ff1I (3)

(4) G

CT-1

0 0

MECH

ROOM

LOWER

ROOF

I-

- -[,_ = 0 1,. - )

I = IJ

LOWER

ROOF

VTR

@EXHAUST FANS

TCWP-1: I : I 111<:£)

{.;\Gt-1 ·'· . I ~ \VD-{}- J TCT-1 I lift~ TCWP-2 - L _____ .J nu<~ .

e==a e--a e==~

VTR

KEYED NOTES

0 ETR CONDENSER WATER GALLEY REFRIGERATION

EQUIPMENT. ·

® ETR COOLING TOWER STRUCTURAL SUPPORTS

0 PN COOU'IG TOWER CT-1 (SEE SHEET M-05

·FOR ADDfflONAL REQUIREMENTS) INCLUDING

WATER DF:AIN AND MAKE-UP WATER CONNECTIONS

TO NEW TOWER. PN CONDENSER WATER PUMPS

CWP-1 & CWP-2 UNDERNEATH TOWER (NOT

SHOWN FOR CLARITY). CWP-1 & CWP-2 PIPING

SHALL MATCH PROVIDED PUMPS INLET AND

OUTLET FcANGED CONNECTIONS SIZES.

© PN 4" PVC CONDENSER WATER PIPING

© REMOVE TEMPORARY 4" FLEXIBLE CONDENSER

WATER HOSES TO THIS POINT.

c

©REMOVE (2) TEMPORARY 4" FLEXIBLE CONDENSER

WATER HOSE APPROXIMATELY 100 FT LONG EACH

TO TEMPORARY COOLING TOWER AND TEMPORARY

CONDENS~R WATER PUMP

(j) REMOVE 'fEMPORARY 80 TON COOLING TOWER

190 GPM, 460/3/60. 5HP

©REMOVE (2) TEMPORARY 190 .GPM @ 70' HEAD.

460/3/61'.), 5 HP CONDENSER WATER PUMPS.

ONE PUMP TO OPERATE ONE PUMP ON 100% -

STAND B" BACK-UP.

© REMOVE TEMPORARY CONCRETE BARRIER TO

PROTECT TEMPORARY EQUIPMENT FROM

VEHICULAR TRAFFIC DAMAGE.

@ ETR CONCRETE BOLLARD (TYPICAL)

.ri-..-..~------~--~----~----~-----· VTR 0 0 ROOF aLOPE

WORK OPTION #3---1

@PN. 24"x<!4"x4" FIBERGLASS 1" THICK R/A

PLENUM WITH 24x4 FIBERGLASS DUCT 1" THICK, 12" LONG FOR SOUND ATTENUATION.

r-----------------------1.1..- EXHAUST FAN@)

_rh

• 1 )2" VI

EXHAUST FAN@

0 4" VTR

• 2" VTR

INTERIOR WORK

GROUND FLOOR

; I

WORK OPTION #3

1 I

UPPER

ROOF

w a.. s w a.. g

LL.

NEW WORK PLAN

SCALE: 1/8"=1'-0"

'VTR 'VTR

B

A

4 I 3 I .

CONSULTANTS

i------------~-L---

U. S. COAST GUARD

CIVIL ENGINEEl~ING UNIT

MIAMI

USCG. CEU MIAMI

15608. SW 117TH AVE

MIAMI, FLORIDA 33177

AG. 09121112 ANAL DESIGN SUBMITTAL

MARK DATE DESCRIPTION

A/E PROJECT NO:

CAD FILE l\IAUE:

-=EO BY: AG

51: Al-i, EDITED BY: A!J

CHECKED BY: TEW

SCALE: AS SHOWN PLOT SCALE: 1:1

SHEEr TITLE

REPLACE COOLING ·TOWER IN BUILDING 102

SECTOR KEY WEST

KEY WEST FL

BUILDING 102

MECHANICAL

NEW WORK PLAN

PROJECT '" ~G. BRANCH CtUEf " GH, OR d2dft{tl 't!:Sel'/2

APPROVING OFFICER -- DATE

·PROJECT NUMBER DRAWING NUMBER

2892084 M1923-D

· DISClPUNEJSHT NO

M~Q4 SHEET 5 OF 9

LPMcCue

B

: 4'. ~·

A-..: .. ·"· . . ..~

. • .6 ••

PUMP SCHEDULE

DESIGNATION CWP-1 CWP-2

SERVICE CONDENSER CONDENSER

FLOW RATE (GPM) 190 190

TOTAL DYNAMIC HEAD (FT) 60 60

RPM 1750 1750

EFFICIENCY (%) 72 72

MAXIMUM BRAKEHORSEPOWER 4 4

MOTOR HORSEPOWER 5 5

ELECTRICAL (V /PH/HZ) 480/3/60 480/3/60

TYPE END SUCTION END SUCTION

COOLING TOWER SCHEDULE

DESIGNATION CT-1

TYPE CROSS FLOW

. NUMBER OF CELLS 1

WATER DATA

FLOW RATE (GPM) . 190

MAXIMUM PRESSURE DROP (FT) 15

ENTERING WATER TEMPERATURE (F) 95

LEAVING WATER TEMPERATURE (F) 85

AMBIENT AIR WET .BULB TEMPERATURE 81

FAN DATA

AIR FLOW RATE (CFM) 20000

MOTOR HORSEPOWER 5.0

ELECTRICAL DATA 480/3/60

DRIVE TYPE V-BELT

CASING CONSTRUCTION STAINLESS STEEL

MCV-2

CT-1

4" cws

PN (4) TYPE 4

RESTRAINED SPRING-..,.."\li:&

ISOLATOR MIN .5"

4" cws

3" cws .

3" cws

,..........., DEFLECTION

ETR CT SUPPORTS

1. :.. ' •

.. t ·. • • •

. :·.· . . · CWP-1

SUCTIO .... · .

ETR CWP CONCRETE PAD

TCWP-1 TCWP-2

CORPORATION STOP AND --...

NOZZLE

3 4

~ CONNECTION AFTER CHILLER

TEMP CONDENSER TEMP CONDENSER ~SLOWDOWN SOLENOD VALVE

480/3/60

END .SUCTION

TCT-1

CROSS FLOW

20000

5.0

480/3/60

ANY

ANY

CT-1

MCV-1

4" CWR TO COOLING TOWER ~

SCHEDULE 80 CPVC PIPING _.,.--

!fOI---------- /_ '.~.:~~l ~~".:'.'--(ffl~----1 - 4" CWS FROM COOLING TOWER

- CONNECTION BEFORE TAKEOFF TO

CONDENSING UNITS

,, INJECTION MANIFOLD l 1 I

'-!-~~-:-~~~--1 I ___.-- 3 I 4"

- 3/4"

480/3/60

TO NEAREST FLOOR DRAIN ---.

I I r------+~~"'--- SCHEDULE 80 PVC PIPING c

END SUCTION

r--~---------- ------ ,,,,,. ___ _ : 115/1/60 ~

CHEMICAL PUMP (TYP.) --------~'~...._

tA.--- ISOLATION VALVE (TYP.)

I I I

I I I

- 3/4"

SHELF ADJACENT TO CONTROL ----------=---~7--f;- CHEMICAL TREATMENT _/

CONTROL PANEL ' '

-...._..._ 1 /2" SAMPLE Wi\STE TO NEAREST

FLOOR DRAIN

4" cws

PANEL AND ABOVE CHEMICAL

TANKS

CHEMICAL SHIPPING ---------1

CONTAINER ((lTY~P~.~) -----------1

BIOCIDE #1 ~

MCV-2

PN (4) 1/2" STAINLESS

STEEL CONCRETE WEDGE

,..,........., ANCHOR. {2) 4" AWAY

... · ... .I'-·;- FROM EDGE, (2) EQUALLY

DISTANCED. EACH SUPPORT

WITH MIN 4 3/4"

EMBEDMENT IN CONCRETE.

6"

ALUMINUM

6060-T6

BEAM

ETR DOC

CONTROLLER

CT-1

-...___ CORROSION AND SCALE

INHIBITOR

L _____ --s TO 3/4" WATER METER

(REFER TO DETAIL BELOW

FOR CONTINUATION

NEW CONDENSER WATER SYSTEM

CHEMICAL TREATMENT SYSTEM SCHEMATIC (REPLACE EXISTING)

SCALE: N.T.S.

MCV-1

'---WOR:K C)PTION # l

CWR TO

EXISTING

CHILLER ~:;-1

ELECTRICAL CONNECTION

TO CHEMICAL TREATMENT

CONTROL PANEL. REFER

TO SCHEMATIC ABOVE

FOR CONTINUATION

B

~----- UNION (TYP.)

_,r-- PRESSURE VALVE SET: 75 PSIG

/ . SAFEWASTE OVER FLOORDRAIN .

r PRESSURE GAUGE r PRESSURE REDUCING VALVE SET:

30 PSIG

ISOLATION VALVE (TYP.)

CWP-1 2

MCV-2

CWS TO

EXISTING

CHILLER j:;-1 1---T- 3/4" 3/4"

N.C .

'+-~:r-----tl~:....--1-1

QUICK FILL BYPASS "'--- 3/4" WATER METER

3/4" MAKEUP WATER TO COOLING

,· .. ·. . ' .. .,,, 2 1/2" cws 4 3/4" MIN.

. ·:.. .. .. ,.' '"': . TOWER

A

; . ·-4 rL-~-h---,--,----b--~J..,..J . _,{' .

• ., • 4.

"'<--!-->-'--' '7-' •• ~ '• • : • •

~~ 3::M·I~ l~"M;N,(

CONDENSER WATER SYSTEM SCHEMATIC

SCALE: · N.T.S.

NEW MAKE-UP WATEI~ ASSEMBLY DETAIL

(REPLACE EXISTING)

SCALE: N.T.S.

COOLING TOWER MOUNTING DETAIL -WORK OPTION #2

SCALE: N.T.S.

1 2 3 4

CONSULTANTS

U. S. COAST GUARD

CIVIL ENGINEERING UNIT

MIAMI

USCG. CEU MIAMI

15608 SW 117ll.I AVE

MIAMI, FLORIDA 33177

ISSUE

AG 09 21 12 FINA!. DESIGN SUBMITTAL

MARK DATE DESCRIPTION

E PROJECT NO:

CAD FILE NAME: M1932M05.DWG

DESIGNED BY: AG

SCALE: AS SHOWN PLOT SCALE:--· -1:1----i

SHE

REPLACE COOLING TOWER IN BUILDING 102

SECTOR KEY WEST

KEY WEST FL

BUILDING 102

MECHANICAL

SCHEDULES & DETAILS

Rf.\llEWEO BY: R

'/.l5st/>t'2.

DATE

i_;P~ROJ=E:::.CT:...:.::.:N ::.::M::::B:::.ER:.._-'-__ :::,:DM.:..: NUMBER

2892084 Ml923-D

SHEET 6 Or 9

LPMcCue

B

A

I 2

PROVIDE TEMPORARY 4" X 4" X 2-1/2"

NEMA 3R J. BOX. REUSE EXISTING COOLING

TOWER AND CONDENSED PUMP BRANCH

CIRCUITS.

PROVIDE TEMPORARY 4" X 4" X 2-1/2"

NEMA 3R J. BOX. FOR CONTROL CABLING---.._~

I 2

MECH

ROOM

LOWER

ROOF

I

PROVIDE TEMPORARY (1) 3/4" PVC SCH

40 CONDUIT SURFACE MOUNTED ON WALL

FOR CONTROL CABLING.

I I,,} I I I I I

UPPER

ROOF

TEMPORARY ELECTRICAL PLAN

SCALE: 1/8"=1 '-0"

I

PROVIDE TEMPORARY (2) 3/ 4" PVC SCH

40 CONDUIT SURFACE MOUNTED ON WALL

WITH 3#10 & 1#10G CONDUCTORS.

I r- PROVIDE TEMPORARY 3P-20A, 480V

COMBINATION NONO-FUSED/DISCONNECT

SWITCH AND MAGNETIC MOTOR STARTER IN

NEMA 3R ENCLOSURE.

ol ~i TCWP-1

D-8 D-8

TCWP-2

I

TCT-1

c

CONSULTANTS

U. S. COAST GUARD

CIVIL ENGINEERING UNIT

MIAMI

USCG. CEU MIAMI

15608 SW 117TH AVE

MIAMI, FLORIDA 33177

ISSUE

RL 09/21/12 FINAL DESIGN SUBMITTAL

MARK DATE DESCRIPTION

AIE PROJECT NO:

CAD FILE NAME:

DESIGNED BY: RL

Dl ! t<L

ED111:.0 OT: RL

CHECKED BY: OT

SCALE: AS SHOWN PLOT SCALE: 1:1

~·· 1111£

REPLACE COOLING TOWER IN BUILDING 102

SECTOR KEY WEST

KEY WEST FL

BUILDING ·102

A ELECTRICAL

TEMPORARY ELECTRICAL PLAN

Ra!;;~: ~~2(Ji~lBY:

PR1 "'"-CT ENG. BRANCH CHIEF 11:.1..H. • 'n •R v--~Ly~~ <[-'£/- J'Z- APPROVING OFFlCER DATE p..nlECT NUMBER DRAWING NUMBER

2892084 M1923-D ui:>UPUNEtSHT NO

E-01 SHEET 7 OF 9

LPMcCue

B

A

REMOVE EXIST. HAND/OFF /AUTO

STARTER DISCONNECT. PRESERVE

EXISTING 1/2" CONDUIT AND

I

CABLES FROM SOURCE PANEL ----...

0 "'------.C

REMOVE ALL ELECTRICAL -----;;---r- ., ___ _

EQUIPMENT UNDERNEATH 0

=i- _ _ _ _ - -::.

0 (/ 0 0 0 0 0 0 0 0 0

REMOVE EXISTING (5) PVC '//

ELECTRICAL CONDUIT BACK TO

BUILDING WALL.

I

MECH

ROOM

LOWER

ROOF

UPPER

ROOF

ELECTRICAL DEMO PLAN

SCALE: 1/8"=1'-o"

I 3

I 3

I 4

~GENERAL DEMOLITION NOTE:S

1. VISIT AND CAREFULLY EXAMINE THOSE PORTIONS OF THE EXl~>TING BUILDING AND

SITE INCLUDED IN THE PROJECT SCOPE. BECOME FAMILIAR WITH EXISTING CONDITIONS,

DIFFICULTIES AND PHASING REQUIREMENTS.

2. ALL EXISTING DEVICES AND EQUIPMENT NOT SHOWN, AND IN A.REAS OUTSIDE OF

THE PROJECT PHASE LIMITS OF CONSTRUCTION SHALL REMAl~i ACTIVE. INSTALL NECESSARY ITEMS AS REQUIRED TO MAINTAIN THE CONTINUl1Y OF EXISTING DEVICES AND EQUIPMENT TI-lAT REMAIN.

3. OWNER HAS FIRST CHOICE OF REFUSAL FOR ANY AND ALL WORK INDICATED FOR

REMOVAL. /i,RRANGE FOR A WALK-THROUGH OF THE PROJECT SITE WITH THE OWNER

PRIOR TO THE COMMENCEMENT OF ANY OF THE DEMOLITION 'NORK TO DCTERMINE

WHAT EXISTING WORK INDICATED FOR REMOVAL IS ACCEPTED BY THE OWNER.

4. ALL EXISTING WORK INDICATED FOR REMOVAL BUT REFUSED BY THE OWNER SHALL

BECOME THE PROPERTY OF THE CONTRACTOR. DISPOSE THIS WORK OFF-SITE, IN A

LAWFUL MANNER.

5. OBSERVE ALL OF THE ACCEPTED WORK WITH THE OWNER BEF'ORE COMMENCING

DISMANTLING PROCEDURES AND NOTE THEIR CONDITION. ANY OAMAGE SUSTAINED BY

THE ACCEPTED WORK FROM THE COMMENCEMENT OF THE DISMANTLING PROCEDURE

TO ITS PLACEMENT IN STORAGE SHALL BE THE RESPONSIBILITY OF THIS

CONTRACTOI~. EITHER REPAIR THE DAMAGE TO THE OBSERVED CONDITION PRIOR TO

ITS DISMANTLING TO THE SATISFACTION OF THE OWNER OR REPLACE THE ACCEPTED

WORK WITH NEW AS DIRECTED BY THE OWNER.

6. RESTORE ALL EXISTING TO REMAIN WORK DAMAGED DUE TO THE PROGRESS OF

CONSTRUCTION TO ITS INITIAL CONDITION AT NO ADDITIONAL COST TO THE OWNER.

7. CEASE ALL WORK IF ASBESTOS IS DISCOVERED AT ANY TIME )URING THE PROGRESS

OF THE DEMOLITION WORK. NOTIFY THE PROJECT MANAGER IMMEDIATELY.

I 4 c

B

A

CONSULTANTS

U. S. COAST GUARD

CIVIL ENGINEERING UNIT

MIAMI

~@~ST Iii/

;;;, .,..... d

\l~S'

USCG. CEU MIAMI

15608 SW 117TH AVE

MIAMI, FLORIDA 33177

ISSUE

RL 09/21/12 ANAL DESIGN SUBMITTAL

MARK DATE DESCRIPTION

A/E PROJECT NO:

CAO ALE NAME:

DESIGNED BY: RL

1:11: "'-

EDITED BY: RL

CHECKED BY: OT

SCALE: AS SHOWN PLOT SCALE: 1 :1

SHEE.T TITLE

REPlACE COOLING TOWER IN BUILDING 102

SECTOR KEY WEST

KEY WEST FL

BUILDING 102

ELECTRICAL

DEMOLITION PLAN

REVI.· ii8 t1,v. ~ ~: REYJEWED BY: /v-: cw /(),~ <1-n ri i 1 1 ;_;-.?......, (_, - r.~

Prc•JJECT ENG. BRANCH CHIEF 11:.Cn. uh<"-'"'Otc

,----~{,~~ Cf-Z,t ~ /'/_ APPROVING OFflCER DATE

PROJECT NUMBER DRAWlNG NUMBER

2892084 M1923-D

OISCIPUNE/SHT NO

E-02 sHm a or 9

LPMcCue

A

PROVIDE 3P-20A, 480V HAND/OFF /AUTO

COMBINATION NON-FUSED/DISCONNECT

SWITCH AND MAGNETIC MOTOR STARTER IN

NEMA 4X SS ENCLOSURE. REUSE EXISTING

COOLING TOWER AND CONDENSED PUMP

BRANCH CIRCUITS (SEE NOTE BELOW)

NEW

COOLING

TOWER

T

,Y

ALL ELECTRICAL CONDUITS SHALL BE 1 /2" GRS

PVC COATED CONDUIT

NOTE:

ALL STARTER ARE 3 POLE, FULL VOLTAGE, NON REVERSING

COMBINATION STARTER WITH NON-FUSED DISCONNECT SWITCH.

PROVIDE EACH WITH 120V CONTROL CIRCUIT TRANSFORMER

WITH 2 PRIMARY FUSES AND ONE SECONDARY FUSE. ALL

UNITS TO BE EQUIPPED WITH HEAVY-DUTY OIL TIGHT

"HAND/OFF /AUTO" SELECTOR SWITCH, TRANSFORMER TYPE

RED , RUN PILOT LIGHT AND TWO CONVERTIBLE AUXILIARY

CONTACTS. PROVIDE STAINLESS STEEL ENCLOSURE.

I 1,,,1 I I I I I

MECH

ROOM

LOWER

ROOF

Lr_11

UPPER

ROOF

NEW ELECTRICAL PLAN

SCALE: 1/8"=1'-0"

I

I

GENERAL NOTES

1. REMOVE ALL TEMPORARY ELECTRICAL CONDUITS AND

DISCONNECT SWITCH SHOWN ON SHE ET E-1.

2. ALL CONTROL WIRING AND EQUIPME~JTS SHALL BE

INSTALLED BY ELECTRICAL CONTRACT>)R AND CONNECTED

BY MECHANICAL CONTRACTOR.

ABBREVIATION

AFF - ABOVE RNISHED FLOOR

C - CONDUIT

CKT - CIRCUIT

G - GROUND

GRS - GALVANIZED RIGID STEEL

PVC - POLY-VINYL CHLORIDE

WP - WEATHER-PROOF

c

B

A

CONSULTANTS

U. S. COAST GUARD

CIVIL ENGINEERING UNIT

MIAMI

USCG. CEU MIAMI

15608 SW 117TH AVE

MIAMI, FLORIDA 33177

ISSUE

RL 09/21/12 FINAL DESIGN SUBMITTAL

MARK DATE DESCRIPTION

A/E PROJECT NO:

CAD FILE NAME:

DESIGNED BY: RL

- 01: "'"

EDITED BY: l'IL

CHECKED BY: DT

SCALE: AS SHOWN PLOT SCALE: 1:1

SnEr• ,,,_I!

REPLACE COOLING TOWER IN BUILD! NG 102

SECTOR KEY WEST

KEY WEST

BUILDING 102

ELECTRICAL

NEW ELECTRICAL PLAN

FL

PROJECT NUMBER DRAWING NUMBER

2892084 M1923-D

1---=D='"' LINE,SHT NO

E-03 SHffi 9 OF 9

LPMcCue

LPMcCue

Enclosure (2)

28920894-FINAL DRAWINGS.pdf
M1923G01
M1923M01
M1923M02
M1923M03
M1923M04
M1923M05
M1923E01
M1923E02
M1923E03

File details come from the government source that posted it. Updated .