SOR - 411 AGE Cage Assembly_V2.pdf
PDF 51 KB Posted
- Attached to
- Power Cable Assemblies
- Solicitation number
- FA930226Q0057V2
About this file
This is a Statement of Requirements for procurement of specific power cable assemblies and related freight services. The requirement specifies two units of Cable Assembly, Power (Part Number 1036251) and one shipment of freight. These cables are essential components for Age PAO equipment and are required to enable operation via electrical base grid power during aircraft maintenance operations, eliminating the need to vent diesel exhaust in the hangar environment. Delivery to 411 FLTS must occur within a maximum of 100 days from order placement, as this timeline is identified as mission essential.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| JA_411 FLTS AGE Parts_Quote SQ0173955 signed by CO_V2_Redacted.pdf | ||
| QA.pdf | ||
| Solicitation - FA930226Q0057.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Requirements
• CABLE ASSEMBLY, POWER, P/N: 1036251, QTY 2
• FREIGHT, QTY 1
• THESE CABLES ARE A REQUIRED LINE ITEM TO THE COMPLEMENT OF AGE PAO
EQUIPMENT AND NEEDED TO OPERATE VIA ELECTRIAL BASE GRID VICE TRYING TO
VENT DIESEL EXHAUST IN A HANGAR ENVIROMENT DURING AIRCRAFT
MAINTENANCE.
• A MAXIMUM OF 100 DAYS BETWEEN ORDER PLACEMENT AND DELIVERY TO
411 FLTS IS MISSION ESSENTIAL.
File details come from the government source that posted it. Updated .