SOO SkyRaider Maintenance Jun 24.pdf
PDF 163 KB Posted
- Solicitation number
- HDTRA124R0031
- Issued by
-
Defense Threat Reduction Agency
About this file
This document is a Statement of Objectives (SOO) for the maintenance and spare parts support of the Teledyne FLIR R80 SkyRaider and Griffin G510 GCMS equipment used by the DTRA Technical Support Groups.
The key objectives of this effort are to: 1) Provide the spare parts listed in Attachment 1, 2) Provide D-level maintenance for the SkyRaider, tether, and associated FLIR detectors, including shipping capability and 15-day turnaround, 3) Provide online training materials for SkyRaider pilots, 4) Provide software reflashing and image reloading services, and 5) Provide annual preventative maintenance for the Griffin G510. The contractor is required to provide specific CDRL deliverables, including a final invoice and a parts price list.
This SOO is associated with a pre-solicitation for a 5-year repair, maintenance, and spare parts contract for the Teledyne FLIR R80D SkyRaider Mission kits, tether, CBRN detectors, and the Griffin G510, to be issued by the Defense Threat Reduction Agency.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Objectives (SOO) for
Teledyne FLIR R80 SkyRaider & Griffin G510 Maintenance and Spare Parts Support
5 June 2024
BACKGROUND:
DTRA Technical Support Groups (TSGs) provide chemical, biological, radiological, and nuclear (CBRN) assistance, guidance, and operational support to Geographic Combatant Commands and other United States Government departments and agencies in all operational and physical environments to combat weapons of mass destruction. The nature of the support requires specialized equipment such as CBRN search capability. The goal of this effort is to procure maintenance and spare parts support for the Teledyne FLIR R80 SkyRaider (including all associated FLIR equipment, payloads, sensors, and tether) and Griffin G510 GCMS.
TASKING:
1. Provide the spare parts listed in Attachment 1.
2. Provide D-level Maintenance for the SkyRaider, tether, and associated FLIR detectors.
o Provide capability to ship direct from DTRA to FLIR repair facility and back.
o Complete maintenance and ship product within 15 business days from receipt of product at repair facility.
o D-Level Maintenance covers a return to factory specification plus the following if applicable:
3. Provide SkyRaider Instructor and Student Pilot on-line training material.
4. Provide service to reflash the aircraft and to reload the R80 software image.
5. Provide Annual Preventative Maintenance for the G510.
Aircraft Arms Batteries Inspect Body & dampers Inspect arms & propellers Inspect latch cover Clean Battery Bay Inspect & Clean motor windings Inspect latch play Update Service Bulletin compliance Replace Propeller (as required) Clean connectors Inspect & clean nav cam Inspect motor bearing play Inspect latch hole Inspect & retorque payload latch Inspect motor glue Inspect top edge Inspect payload connector Inspect motor to Arm gasket Inspect sidewall Inspect Battery gasket Inspect heatsink Legs Inspect Battery sleeves Inspect arm latch Clean Leg contacts Inspect top cap seal Inspect connector plate Inspect & Replace Legs (as required) Inspect arm connector Tablet & MCS Inspect rubber foot Inspect leg connector Clean screen Inspect back cover Re-torque heatsink screws Check correct settings are applied Inspect connector pad Re-torque tub to topcap screws Inspect keying feature
Base-Station Battery Charger Payload Replace Antenna (as required) Inspect Charger Inspect & clean lens Inspect Base Station o Provide capability to ship direct from DTRA to FLIR repair facility and back.
6. Provide the Contract Data Requirements List (CDRL) item for this effort as summarized below:
CDRL Title Due A001 Final Invoice 60 Days after end of each contract year A002 Parts Price list 90 Days before end of each contract year
| BACKGROUND: |
| TASKING: |
File details come from the government source that posted it. Updated .