SOO - Loop System Water Treatment Services FY24.pdf

PDF 71 KB Posted

Attached to
COOLING TOWER WATER TREATMENT & TESTING SERVICES Federal contract opportunity
Solicitation number
70FBR024Q00000010
Issued by
Federal Emergency Management Agency

About this file

This document is a Statement of Objectives (SOO) for a federal contract opportunity for Cooling Tower Water Treatment and Testing Services at the Federal Emergency Management Agency (FEMA) Region 10 Federal Regional Center (FRC) in Bothell, Washington.

The key objectives are for the contractor to provide all labor, parts, and materials to perform water testing and treatment services for the cooling tower of the HVAC chilled water system at the FRC facility. This includes tasks such as conducting water analysis, inspecting the cooling towers, controlling equipment, applying biocides and scale/corrosion inhibitors, and performing annual cooling tower cleanouts. The contractor must respond to emergency calls within 4 hours and provide monthly and annual service reports. The period of performance will be as stated in the contract, and the work must be conducted during FEMA's standard business hours unless otherwise approved. The contractor must comply with all applicable federal safety and security requirements for the facility.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FEDERAL EMERGENCY MANAGEMENT AGENCY | REGION 10

FRC COOLING TOWER WATER TREATMENT & TESTING SERVICES

STATEMENT OF OBJECTIVE

March 4, 2024

A. PROJECT TITLE

Federal Emergency Management Agency (FEMA) Region 10 Federal Regional Center (FRC) Cooling Tower Water Treatment and Testing Services.

B. BACKGROUND

FEMA has a cooling tower for the chilled water system that needs to have chemicals added to maintain the quality of water and prevent buildup of algae and minerals.

C. OBJECTIVE

The Contractor shall provide FEMA - Region 10 with all labor, parts, and materials to perform work related to water testing and treatment for the cooling tower for the HVAC chilled water system at the FRC Bothell facility. Before coming on-site, contact will be made with the Facilities team to ensure FEMA is given a report on every visit with what is completion at the job site.

D. REQUIREMENTS

Contractor to provide water testing and treatment services to include:

Provide all necessary supervision, personal protective equipment, and tools to perform service.

Water treatment to prevent fouling on metal services, inhibit corrosion, sanitize, clean, disinfect and control biological growths.

Check and inspect chemical levels and replenish chemicals as needed on a regular basis to ensure the integrity of the system.

Respond to emergency calls within 4 hours.

Monthly service shall include:

a. Conduct water analysis on the cooling towers.

b. Inspect cooling towers for biological growth, foam, sludge, and proper system operation.

c. Control equipment is to be checked for calibration and proper operations, probes are cleaned, and adjustments made as test results dictate.

d. Inspect blow down solenoid valve.

e. Inspect and repair chemical pumps, injection points, and check valves on all treated equipment.

f. Ensure water flow is sufficient through all lines.

g. Furnish and apply all products to retard scale and corrosion in condensing water circuits.

h. Furnish and apply biocides for the prevention of biological fouling in the circulating water systems.

i. Visually inspect operation of equipment and make note of any conditions that interfere with proper equipment operations and report to FEMA Facility Manager.

j. Furnish all test regents, test equipment, and log sheets necessary to properly maintain the treatment program.

k. Supply copies of computerize reports listing findings and recommendations to FEMA Facility

Manager.

l. Water analysis on closed water circuits.

m. Furnish and apply all products to retard scale and corrosion in closed loop water circuits.

n. Visually inspect operation of equipment and keep the treatment area neat, clean, and orderly.

Annual service shall include:

a. Present yearly review of the treatment program, topics to include recommendations, effectiveness of existing program, results of equipment inspections and future consideration.

b. Perform annual cooling tower cleanout to maintain tower fill, tower nozzles, and distribution decks from scale and debris accumulation.

c. Flush sumps and basins to remove debris and deliver water samples results to FEMA

Facility Manager.

E. DELIVERABLE AND DELIVERY SCHEDULE

All work will be completed and reviewed and accepted by the government upon completion after treatments. The Contractor must call and give a minimum 1-day notice before coming on-site or will not be allowed to enter the facility.

F. GOVERNMENT-FURNISHED EQUIPMENT AND INFORMATION

Any work or action indicated to be accomplished by the Contractor, including the furnishing of materials therefore unless otherwise specified, shall be at the Contractor’s expense.

G. PLACE OF PERFORMANCE

The Contractor shall perform work at the following FEMA Region 10 location:

FEMA Federal Regional Center (FRC) Region 10

130 228th ST SW

Bothell, WA 98021

H. PERIOD OF PERFORMANCE

The period of performance to be as stated on contract.

I. SITE SECURITY REQUIREMENTS

Security requirement of this facility grounds include but are not limited to a 100% identification check. All toolboxes, machinery, etc. are subject to random search, and shall not be left unattended in public areas, except by prior approval of the FEMA Region 10 Facility Manager or designee. Such containers and toolboxes shall be locked and secured when unattended and shall be clearly labeled to indicate general contents and a point of contact in case of emergency. The Contractor shall make available and keep a current roster of employees working at the FEMA Region 10 site.

J. SAFETY REQUIREMENTS

In order to provide safety controls for protection of the life and health of employees and other persons; for prevention of damage to property, materials, supplies, and equipment; and for avoidance of work interruptions in the performance of this contract, the Contractor shall comply with all applicable Federal laws and regulations with such additional measures as the government may deem necessary.

All tools and personal protective equipment required to be provided by the Contractor. The Contractor shall ensure all tools, equipment, and machinery are in good working order.

K. PROJECT WORK HOURS AND SITE ACCESS

Working hours of the building occupants designated to assist with this project are from 7:00AM to 4:00PM

– Monday through Friday, excluding Federal holidays. Work performed under this contract shall be performed during these hours designated above, unless otherwise approved in advanced by the FEMA Region 10 Facility Manager or designee. The Contractor shall coordinate the contracted and/or related work items with the FEMA Region 10 Facilities Manager or designee. The Contractor shall make request for exception to the work hours indicated above to the FEMA Region 10 Facility Manager or designee, at least 48 hours prior to the proposed deviation from the above work hours.

File details come from the government source that posted it. Updated .