This document is a Statement of Need (SON) for a federal contract opportunity to provide a replacement wheel build-up stand and wheel assembly torque system for the 60th Maintenance Squadron/Wheel & Tire at Travis AFB.
The 60th Maintenance Squadron/Wheel & Tire requires new equipment to assemble aircraft wheels for C-17, C-5, and KC-46 aircraft. The current torque system is inoperative and requires upgrade parts, while the existing wheel build-up stand has reached the end of its life and needs replacement. Without these critical items, the unit's production is reduced by 75%, potentially causing supply chain delays.
The contractor shall provide a replacement torque system that can simultaneously torque two wheel nuts with an accuracy of 2% at maximum torque and 1 degree of torque angle, with a range of 45-225 ft/lbs. The new wheel build-up stand must be able to lift and align wheels between 16-24 inches in diameter and 37-50 inch tires. The contract includes delivery, installation, training, warranty, and calibration equipment within 30 days of contract award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Brand name justification - redacted_Redacted.pdf | ||
| Combined Synopsis Solicitation - Torque System.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Need For
60 MXS/MXMTA
60th Maintenance Squadron/Wheel & Tire has a requirement to assemble multiple types of aircraft wheels to include C-17, C-5 and KC-46 main and nose wheel assemblies. To perform this task, we use a tilt cylinder wheel build-up stand paired with a twin-spindle torquing system meant for aircraft wheel assemblies. The current torque system needs repairs and is inoperative. It requires upgrade parts. The wheel build-up stand in use has come to its end of life and requires replacement/upgrade. Without these units Wheel & Tire’s production is reduced to 25% of normal operation potentially causing supply chain delay.
The contractor shall provide the following:
1. Equipment.
1.1 Contractor shall deliver and install equipment and provide training within 30 days after contract is awarded.
1.2 Contractor will deliver to 269 Ellis Rd. Travis AFB CA, 94535
1.3 Replacement parts are needed for Bauer Model 8071 Wheel Build-Up Stand and Bauer Model 8731 Wheel Assembly Torque System only. (Brand name).
1.3.1 Products must meet the following specifications:
Torque system must be adjustable to simultaneously torque two nuts on any given wheel. Must have an accuracy of 2% at max torque and 1deg of torque angle, with a torque range of 45-225 ft/lbs. Build stand must be able to lift and align wheel with torque system. It must be adjustable to accept wheel diameters from 16” to 24” and tire diameters from 37” to 50”.
1.3.2 Acceptable power source in building location where equipment will be placed is 20A 120V (single hot + neutral).
1.3.3 Optional wheel adaptors are not required
| 1.4 Additionally contractor will provide: | |
| 1.4.1 Torque standard calibration equipment (BS3345-02) is required for recuring tests. |
2. Training
| 2.1 Must include end-user manual with operational instructions for device. |
| 2.2 Must provide on-site installation and training services. |
3. Equipment warranty (1 year standard) and shipping costs must be included