SON_SH_crane_long_lead_overhaul_parts.docx
DOCX document 17 KB Posted
- Solicitation number
- 1333MK25Q0120
About this file
This Statement of Need outlines requirements for crane overhaul parts for the NOAA Ship Bell M. Shimada. The document specifies procurement of seven distinct replacement components, including an electric slip ring, angle and length transducers, hydraulic control valve, load pin, sheaves, and hydraulic motors. Delivery is required no later than December 30, 2025, to the NOAA Marine Operations Center-Pacific (MOC-P) in Newport, Oregon, with specific delivery instructions for the Bell M. Shimada located at 2002 SE Marine Science Drive. The parts are specifically for the vessel's telescoping boom crane, Model EB70-60-25, Serial Number 14927. The solicitation is issued by the Department of Commerce's National Oceanic and Atmospheric Administration (NOAA) under solicitation number 1333MK25Q0120, with a federal contract opportunity ID of 687a870f02dea08a07059f24.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Contract_Opps_Combined_Synopsis_under_250k_TEMPLATE_22OCT2020_red_notes.docx | DOCX document | |
| Sol_1333MK25Q0120.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF NEED
Crane long lead SHIP Bell M. Shimada - 2025
1.0 Abstract
a. Purpose: The NOAA Ship Bell M. Shimada needs crane overhaul parts.
2.0 Requirements
a. Provide replacement parts as following:
| QTY. | Description | Part No |
| i. 1 | Electric Slip Ring | YMD-8901 |
| ii. 1 | Angle Transducer | YMD-8902 |
| iii. 1 | Length Transducer | YMD-8891 |
| iv. 1 | Hydraulic control valve | YMD-8893 |
| v. 1 | Load Pin | YMD-8890 |
| vi. 4 | Sheave 12” OD x 5/8” rope | YMD-7802 |
| vii. 2 | Hydraulic motor | YMD-9102 |
b. Provide Shipping and handling to NOAA MOC-P, Newport, Oregon. Provide tracking for this shipment.
3.0 Deliverables
a. Period of Delivery: no later than 30 December 2025.
b. Place of Delivery:
NOAA Ship Bell M. Shimada, PE 2002 SE Marine Science Drive Newport, OR 97365
Delivery Contact: Jerry Sheehan 541-351-4630
4.0 Notes
a. Shimada's telescoping boom crane Model EB70-60-25 Sn 14927.
File details come from the government source that posted it. Updated .