SON Loader Rental for 6 months.pdf

PDF 55 KB Posted

Attached to
Front-End Loader Six-Month Lease for Snow Removal Federal contract opportunity
Solicitation number
FA254324Q0005
Issued by
Department of the Air Force Space Command

About this file

This document outlines a six-month rental requirement for a front-end loader by the Department of the Air Force Space Command. The Space Force at Buckley Air Force Base requires a 4.0 to 4.9 cubic yard front-end loader for snow removal, to be delivered within 7 days of order receipt. The loader must have a bucket of the specified size, four-wheel drive capability, and an enclosed cab with heat and air conditioning. If possible, an ACS industries Pro-series front coupler attachment would also be needed. The related federal contract opportunity is solicitation number FA254324Q0005 for the front-end loader rental, issued by the Department of the Air Force Space Command.

View the file

Other files for this federal contract opportunity

Other files attached to Front-End Loader Six-Month Lease for Snow Removal, newest first.
File Type Posted
Solicitation - FA254324Q0005.pdf PDF
Solicitation - FA254324Q0005.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF NEED

US Space Force

Front-End Loader Six-Month Lease for Snow Removal

31 October 2023

1. SCOPE:

A 4.0 to 4.9 cubic yard loader needs to be rented or leased to meet snow removal requirements.

2. REQUIREMENT:

Product

Product code/number

Quantity Unit of Issue Front end Loader 4.0-4.9 Cubic yard for 6-month rental.

Unknown 6

Month

3. SHALL PERFORM THE FOLLOWING:

• Shall have a 4-4.9 Cubic yard bucket.

• Shall be 4-wheel drive.

• Shall be closed cab with heat and air conditioning.

• If possible, ACS industries, Inc #70 Pro-series front coupler attachment.

4. DELIVERY:

Must be made to Buckley Space force Base. A lowboy delivery vehicle will be required, as there is limited access and no off-loading ramp available. The contractor shall deliver the above requirements no later than 7 days after receipt of order.

File details come from the government source that posted it. Updated .